REMOVING CONC (PAV)
|
SY
|
67.000
|
$35.000
|
$20.000
|
$75.000
|
$100.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
485.000
|
$25.000
|
$20.000
|
$2.000
|
$45.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
68.000
|
$40.000
|
$20.000
|
$50.000
|
$90.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
522.000
|
$30.000
|
$20.000
|
$40.000
|
$70.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
1,250.000
|
$10.000
|
$10.000
|
$10.000
|
$3.000
|
|
|
BLOCK SODDING
|
SY
|
1,250.000
|
$10.000
|
$10.000
|
$7.500
|
$8.000
|
|
|
FERTILIZER
|
AC
|
0.250
|
$2,500.000
|
$5,000.000
|
$1,200.000
|
$5,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
44.000
|
$50.000
|
$50.000
|
$90.000
|
$65.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
1,253.000
|
$35.000
|
$30.000
|
$60.000
|
$100.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (7")
|
SY
|
1,120.000
|
$150.000
|
$120.000
|
$269.000
|
$215.000
|
|
|
CURB (TYPE II)
|
LF
|
1,199.000
|
$30.000
|
$30.000
|
$5.000
|
$10.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
12.000
|
$255.000
|
$380.000
|
$295.630
|
$470.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
11.000
|
$300.000
|
$450.000
|
$677.250
|
$630.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
39.000
|
$325.000
|
$500.000
|
$698.750
|
$705.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
5.000
|
$600.000
|
$850.000
|
$1,500.000
|
$1,650.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
1.000
|
$2,500.000
|
$3,500.000
|
$4,000.000
|
$2,800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$75,390.000
|
$90,000.000
|
$97,000.000
|
$111,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$8,200.000
|
$8,500.000
|
$21,000.000
|
$10,690.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
270.000
|
$20.000
|
$4.000
|
$8.000
|
$5.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
7.000
|
$100.000
|
$350.000
|
$250.000
|
$255.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
8.000
|
$2,300.000
|
$3,250.000
|
$5,000.000
|
$3,350.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
90.000
|
$15.000
|
$40.000
|
$19.890
|
$38.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
245.000
|
$60.000
|
$40.000
|
$37.410
|
$68.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
100.000
|
$35.000
|
$50.000
|
$45.690
|
$46.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
390.000
|
$45.000
|
$60.000
|
$55.900
|
$24.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
780.000
|
$2.000
|
$3.000
|
$1.610
|
$3.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
765.000
|
$2.000
|
$4.000
|
$2.690
|
$3.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
10.000
|
$3.500
|
$7.000
|
$2.630
|
$4.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
20.000
|
$3.500
|
$6.000
|
$2.960
|
$4.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
3.000
|
$1,300.000
|
$2,300.000
|
$1,634.000
|
$1,960.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$1,600.000
|
$2,300.000
|
$1,935.000
|
$2,730.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$8,800.000
|
$9,500.000
|
$9,943.750
|
$12,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$700.000
|
$1,150.000
|
$584.800
|
$1,435.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$700.000
|
$1,000.000
|
$584.800
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
9.000
|
$180.000
|
$500.000
|
$75.250
|
$175.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
216.000
|
$2.000
|
$2.000
|
$1.610
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
575.000
|
$8.000
|
$7.000
|
$6.720
|
$9.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$350.000
|
$250.000
|
$161.250
|
$240.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
2.000
|
$450.000
|
$250.000
|
$177.380
|
$410.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$350.000
|
$250.000
|
$188.130
|
$310.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
447.000
|
$1.500
|
$3.000
|
$1.430
|
$7.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
299.000
|
$1.000
|
$3.000
|
$1.170
|
$10.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
28.000
|
$5.000
|
$6.000
|
$5.910
|
$35.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
10.000
|
$5.000
|
$6.000
|
$5.910
|
$35.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
286.000
|
$3.000
|
$2.000
|
$1.080
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
87.000
|
$8.000
|
$6.000
|
$3.230
|
$17.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
746.000
|
$0.200
|
$1.000
|
$0.160
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
216.000
|
$0.200
|
$1.000
|
$0.270
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
575.000
|
$0.500
|
$1.000
|
$0.590
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$25.000
|
$100.000
|
$29.030
|
$65.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$25.000
|
$100.000
|
$38.700
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$25.000
|
$100.000
|
$38.700
|
$70.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
38.000
|
$2.000
|
$15.000
|
$1.080
|
$3.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
6.000
|
$350.000
|
$450.000
|
$467.630
|
$800.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
6.000
|
$350.000
|
$450.000
|
$467.630
|
$800.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$350.000
|
$450.000
|
$467.630
|
$800.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$350.000
|
$450.000
|
$467.630
|
$800.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$350.000
|
$450.000
|
$467.630
|
$800.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$350.000
|
$450.000
|
$467.630
|
$800.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$750.000
|
$1,500.000
|
$1,053.500
|
$1,600.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
8.000
|
$170.000
|
$400.000
|
$193.500
|
$305.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
4.000
|
$200.000
|
$500.000
|
$215.000
|
$335.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
|
LF
|
1,220.000
|
$2.000
|
$5.000
|
$2.960
|
$5.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
370.000
|
$4.000
|
$6.000
|
$3.330
|
$6.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
595.000
|
$6.000
|
$7.000
|
$4.030
|
$6.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
635.000
|
$10.000
|
$10.000
|
$11.290
|
$10.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$17,000.000
|
$16,000.000
|
$19,806.880
|
$16,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
1.000
|
$14,000.000
|
$15,000.000
|
$19,780.000
|
$16,400.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$16,000.000
|
$16,000.000
|
$22,413.750
|
$17,700.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
1.000
|
$17,500.000
|
$21,000.000
|
$25,047.500
|
$19,600.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
2.000
|
$3,000.000
|
$4,000.000
|
$2,182.250
|
$6,500.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
8.000
|
$1,000.000
|
$1,850.000
|
$1,204.000
|
$2,600.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,750.000
|
$5,000.000
|
$4,998.750
|
$5,000.000
|
|
|
REMOVE LUMINAIRE POLE
|
EA
|
1.000
|
$3,500.000
|
$2,000.000
|
$2,687.500
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
428.000
|
$80.000
|
$150.000
|
$82.500
|
$40.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
1.000
|
$9,000.000
|
$10,000.000
|
$14,512.500
|
$10,000.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$9,000.000
|
$10,000.000
|
$13,921.250
|
$9,500.000
|
|
|
VIDEO IMAGING AND RAD VEH DETECTION SYS
|
EA
|
5.000
|
$10,000.000
|
$12,000.000
|
$12,384.000
|
$13,500.000
|
|
|
CAT 5 ETHERNET CABLE
|
LF
|
800.000
|
$5.000
|
$7.000
|
$4.350
|
$4.000
|
|
|
HIGHWAY TRAFFIC SIGNALS
|
EA
|
1.000
|
$34,000.000
|
$65,000.000
|
$67,402.500
|
$65,000.000
|
|
|
COFW EMR VEH (EV) PREEMPT (INST ONLY)
|
EA
|
4.000
|
$2,000.000
|
$2,000.000
|
$1,268.500
|
$1,000.000
|
|
|
COFW CELLULAR ROUTER (INSTALL ONLY)
|
EA
|
1.000
|
$2,000.000
|
$2,000.000
|
$483.750
|
$300.000
|
|
Totals: |
$827,881.400
|
$938,539.000
|
$1,169,419.100
|
$1,173,076.000
|