TARRANT CS (0902-90-134)

Items: 73

County: TARRANT
Length: N/A
Highway: CS
District: FORT WORTH
Control Number: 0902-90-134
DBE Goal: N/A
Project: BR 2021(124)
Guaranty: N/A
Time: 192 WORKING DAYS
Engineer's Estimate: $1,344,600.09
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
____________________MINH TRAN
_____________DANIEL POOLE
___________________SAM YACOUB
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,344,600.09
$1,644,915.14
Over/Under Est: 22.33% $300,315.05
Over/Under Est: 26.33% $353,972.90
Amt Left: 3.26% $53,657.85
Over/Under Est: 49.38% $663,919.17
Amt Left: 22.1% $363,604.12
Delta: -18.25% -$309,946.27
$2,089,136.50
Over/Under Est: 55.37% $744,536.41
Amt Left: 27.01% $444,221.36
Delta: -4.01% -$80,617.24
Subcontractor Percentage Amount
LAUGHLEY BRIDGE & CONSTRUCTION, INC. 12.92% $206,954.53
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 4.92% $78,809.31
WYLIE DRILLING & DRAINAGE, INC. 3.15% $50,457.18
FC TRAFFIC CONTROL, INC. 2.25% $36,040.84
FORTSON CONTRACTING, INC. 0.83% $13,295.07
DUSTROL, INC. 0.80% $12,814.52
TRP CONSTRUCTION GROUP, LLC 0.77% $12,333.98
C. GREEN SCAPING, L.P. 0.43% $6,887.81
BREDA COMPANY, INC. 0.39% $6,247.08
MASSEY CONTRACTORS, LLC 0.36% $5,766.53
SYNERGY SIGNS & SERVICES LLC 0.19% $3,043.45
DFW REBAR, INC. 0.14% $2,242.54
GEOTEX ENGINEERING LLC 0.00% $0.00
Total: 27.15% $434,892.84

Bid Items & Bid Tabulations

73 Total 0 of 73
TARRANT  |  CS  |  FORT WORTH  |  0902-90-134  |  06/01/2023  |  $1,344,600.09  |  BR 2021(124)  |  BRIDGE REPL  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
RAGLE CONSTRUCTION, INC.
ED BELL CONSTRUCTION COMPANY
TEXAS-REYES GROUP LTD.
PREPARING ROW
STA 5.200 $7,500.000 $31,309.420 $30,000.000 $12,600.000 $15,000.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 5.000 $400.000 $750.000 $1,000.000 $1,260.000 $1,100.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 578.000 $50.000 $10.000 $60.000 $50.000 $12.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 1,131.000 $35.000 $22.000 $48.000 $40.000 $45.000
COMPOST MANUF TOPSOIL (4")
SY 1,027.000 $10.000 $9.500 $4.700 $10.100 $9.250
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 1,027.000 $2.000 $1.800 $2.250 $6.710 $1.750
VEGETATIVE WATERING
MG 36.000 $50.000 $15.000 $150.000 $90.000 $70.500
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 1,918.000 $22.000 $12.000 $16.000 $35.000 $25.000
PRIME COAT (MULTI OPTION)
GAL 575.000 $10.000 $8.000 $8.000 $9.000 $5.750
PLANE ASPH CONC PAV(0" TO 8")
SY 1,290.000 $10.000 $7.500 $11.500 $10.000 $14.000
CEM STABIL BKFL
CY 188.000 $250.000 $165.000 $135.000 $300.000 $335.000
TEMPORARY SPL SHORING
SF 261.000 $48.000 $100.000 $28.000 $210.000 $15.000
DRILL SHAFT (36 IN)
LF 210.000 $250.000 $380.000 $351.000 $350.000 $540.000
CL C CONC (ABUT)(HPC)
CY 53.200 $1,500.000 $1,500.000 $952.000 $4,000.000 $1,850.000
REINF CONC SLAB (HPC)
SF 2,990.000 $25.000 $28.000 $39.000 $55.000 $95.000
APPROACH SLAB
CY 70.600 $750.000 $700.000 $677.000 $1,000.000 $1,000.000
PRESTR CONC GIRDER (TX28)
LF 387.060 $250.000 $240.000 $257.000 $450.000 $450.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 265.000 $150.000 $136.000 $174.000 $196.150 $490.000
RIPRAP (MOW STRIP)(4 IN)
CY 11.000 $550.000 $750.000 $681.000 $945.000 $1,903.000
RAIL (TY T223)(HPC)
LF 178.000 $185.000 $175.000 $129.000 $178.000 $292.000
ARMOR JOINT (SEALED)
LF 84.000 $160.000 $165.000 $135.000 $150.000 $290.250
GABIONS (GALV)
CY 52.000 $450.000 $260.000 $413.000 $427.350 $1,189.250
GABION MATTRESSES (GALV)(6 IN)
SY 60.000 $225.000 $140.000 $133.000 $126.540 $323.000
GABION MATTRESSES (GALV)(12 IN)
SY 146.000 $250.000 $160.000 $156.000 $161.070 $364.750
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $40,000.000 $140,000.000 $150,000.000 $50,000.000 $60,000.000
REMOV STR (SMALL FENCE)
LF 120.000 $15.000 $5.000 $10.000 $29.080 $15.000
MOBILIZATION
LS 1.000 $122,236.370 $164,491.510 $165,000.000 $197,500.000 $75,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $9,000.000 $12,500.000 $16,500.000 $21,500.000 $1,650.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $21.000 $50.000 $42.300 $10.000 $17.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $7.250 $18.000 $30.000 $5.000 $17.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,043.000 $5.000 $6.000 $4.750 $5.250 $3.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,043.000 $1.250 $1.900 $1.350 $2.650 $1.000
CONSTRUCTING DETOURS
SY 622.000 $80.000 $160.000 $74.000 $90.000 $110.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 48.000 $135.000 $250.000 $95.000 $55.780 $147.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 6.000 $4,550.000 $5,600.000 $5,000.000 $6,000.000 $5,650.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 90.000 $100.000 $48.000 $50.000 $25.000 $176.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 480.000 $60.000 $51.000 $50.000 $25.000 $173.500
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $60.000 $62.000 $50.000 $50.000 $226.750
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 590.000 $10.000 $5.000 $2.000 $12.500 $19.750
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $15.000 $6.500 $2.000 $25.000 $36.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 90.000 $10.000 $17.000 $10.000 $25.000 $50.750
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 480.000 $10.000 $16.500 $10.000 $25.000 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $10.000 $19.000 $22.000 $50.000 $32.000
PCTB(FUR & INST)(F-SHP TO LOW PROF)TY T
LF 20.000 $250.000 $175.000 $160.000 $525.000 $650.000
PORT CTB(REMOVE)(F-SHAPE)(TY T)
LF 20.000 $75.000 $22.000 $37.000 $50.000 $45.250
MTL W-BEAM GD FEN (TIM POST)
LF 112.500 $25.000 $24.000 $20.500 $22.040 $34.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,100.000 $2,000.000 $3,700.620 $3,236.640 $2,471.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,250.000 $1,100.000 $1,000.000 $1,075.000 $2,014.000
MTL BM GD FEN TRANS (NON - SYM)
EA 3.000 $1,000.000 $700.000 $650.000 $698.750 $1,503.750
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,200.000 $3,000.000 $2,775.000 $2,983.130 $3,839.750
WIRE FENCE (TY C)
LF 120.000 $30.000 $10.000 $20.000 $53.490 $25.250
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $660.000 $720.000 $612.000 $657.900 $1,437.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $990.000 $950.000 $884.000 $950.300 $1,777.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $26.000 $23.000 $20.500 $22.040 $58.250
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 12.000 $32.000 $23.000 $20.000 $21.500 $56.750
INSTL OM ASSM (OM-3L)(TWT)GND
EA 2.000 $342.000 $300.000 $265.000 $284.880 $755.500
INSTL OM ASSM (OM-3R)(TWT)GND
EA 2.000 $342.000 $300.000 $265.000 $284.880 $755.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,336.000 $1.000 $1.600 $0.970 $1.040 $1.750
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $7.000 $15.000 $15.000 $16.130 $24.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,112.000 $1.150 $1.600 $0.970 $1.040 $1.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 60.000 $1.500 $9.500 $5.000 $5.910 $1.500
PAVEMENT SEALER 6"
LF 420.000 $0.500 $0.400 $0.450 $0.480 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,628.000 $1.000 $1.500 $1.090 $1.170 $1.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 2,628.000 $1.000 $1.500 $1.090 $1.170 $1.500
REFL PAV MRKR TY II-A-A
EA 32.000 $6.000 $9.500 $5.000 $5.380 $18.250
ELIM EXT PAV MRK & MRKS (4")
LF 2,816.000 $0.850 $0.850 $0.950 $1.020 $1.000
PAV SURF PREP FOR MRK (4")
LF 5,321.000 $0.670 $0.050 $0.150 $0.160 $0.750
D-GR HMA TY-B PG64-22
TON 573.000 $125.000 $136.000 $124.800 $138.000 $230.000
SP MIXES SP-C SAC-A PG70-28
TON 208.000 $200.000 $182.000 $173.500 $191.000 $325.000
TACK COAT
GAL 363.000 $5.000 $8.000 $8.000 $8.000 $5.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $14,000.000 $35,000.000 $10,000.000 $1,000.000
TMA (STATIONARY)
DAY 2.000 $165.000 $330.000 $400.000 $210.000 $395.000
TMA (MOBILE OPERATION)
HR 16.000 $75.000 $100.000 $80.000 $126.000 $85.000
Totals: $1,344,600.090 $1,644,915.144 $1,698,572.990 $2,008,519.260 $2,089,136.500