Show Job Controls
Bid Cobra

TARRANT CS (0902-90-130)

Items: 64

County: TARRANT
Length: N/A
Highway: CS
District: FORT WORTH
Control Number: 0902-90-130
DBE Goal: N/A
Project: BR 2021(304)
Guaranty: N/A
Time: 192 WORKING DAYS
Engineer's Estimate: $1,231,106.25
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,231,106.25
Over/Under Est: 22.91% $282,011.84
Over/Under Est: 33.94% $417,780.87
Amt Left: 8.97% $135,769.03
Over/Under Est: 46.88% $577,092.44
Amt Left: 19.5% $295,080.60
Delta: -9.66% -$159,311.57
Subcontractor Percentage Amount
WYLIE DRILLING & DRAINAGE, INC. 7.04% $116,499.13
UNDERGROUND SUPPORT SERVICES, LLC 3.17% $52,457.70
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 2.72% $45,011.03
TRP CONSTRUCTION GROUP, LLC 1.99% $32,930.86
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.91% $31,607.01
BUYERS BARRICADES, INC. 1.27% $21,016.18
TORO BRAVO CONSTRUCTION, LLC 0.90% $14,893.35
DUSTROL, INC. 0.51% $8,439.57
PENHALL COMPANY 0.42% $6,950.23
Total: 19.93% $329,805.06

Bid Items & Bid Tabulations

64 Total 0 of 64
TARRANT  |  CS  |  FORT WORTH  |  0902-90-130  |  06/28/2023  |  $1,231,106.25  |  BR 2021(304)  |  BRIDGE REPL  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MCMAHON CONTRACTING AND CONSTRUCTION, LLC
RAGLE CONSTRUCTION, INC.
ED BELL CONSTRUCTION COMPANY
REMOVING CONC (SIDEWALKS)
SY 33.000 $40.000 $18.080 $40.000 $50.000
REMOVING STAB BASE & ASPH PAV (8"-12")
SY 500.000 $10.000 $25.540 $29.000 $25.000
COMPOST MANUF TOPSOIL (4")
SY 137.000 $2.000 $12.870 $11.000 $13.000
BLOCK SODDING
SY 137.000 $10.000 $11.470 $13.400 $11.000
BROADCAST SEED (TEMP) (WARM)
SY 137.000 $2.000 $9.360 $3.750 $8.000
BROADCAST SEED (TEMP) (COOL)
SY 137.000 $2.000 $9.360 $3.750 $8.000
VEGETATIVE WATERING
MG 39.000 $40.000 $102.960 $10.000 $150.000
CEMENT
TON 3.000 $300.000 $639.990 $1,900.000 $750.000
CEMENT TREAT (EXIST MATL) (6")
SY 264.000 $10.000 $188.880 $22.100 $90.000
PRIME COAT(MC-30 OR AE-P)
GAL 47.000 $10.000 $40.950 $35.000 $10.000
CEM STABIL BKFL
CY 140.700 $250.000 $253.220 $120.000 $400.000
DRILL SHAFT (24 IN)
LF 752.000 $240.000 $247.990 $166.000 $250.000
CL C CONC (ABUT)(HPC)
CY 43.800 $1,400.000 $1,991.470 $1,200.000 $3,000.000
REINF CONC SLAB (HPC)
SF 3,600.000 $30.000 $31.270 $28.000 $50.000
BRIDGE SIDEWALK (HPC)
SF 744.000 $15.000 $22.940 $16.000 $30.000
APPROACH SLAB (HPC)
CY 112.500 $750.000 $834.040 $656.000 $1,000.000
PRESTR CONC SLAB BEAM (4SB15)
LF 693.000 $270.000 $240.330 $299.500 $375.000
PRESTR CONC SLAB BEAM (5SB15)
LF 148.500 $270.000 $288.880 $299.500 $375.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 7.400 $800.000 $1,187.530 $881.000 $1,000.000
STR STEEL (MISC NON - BRIDGE)
LB 1,621.000 $20.000 $20.320 $10.000 $40.000
RAIL (TY C402)(HPC)
LF 124.000 $170.000 $325.760 $258.000 $350.000
ARMOR JOINT (SEALED)
LF 136.000 $130.000 $122.690 $139.000 $150.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $45,000.000 $70,627.150 $260,000.000 $75,000.000
MOBILIZATION
LS 1.000 $103,900.000 $283,684.060 $160,000.000 $173,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $10,000.000 $3,456.270 $20,000.000 $15,750.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $50.000 $35.100 $46.000 $61.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $20.000 $17.550 $25.000 $35.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $30.000 $33.350 $28.500 $12.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $15.000 $11.700 $10.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 366.000 $5.000 $4.040 $3.450 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 366.000 $1.000 $1.170 $1.000 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 48.000 $8.000 $5.790 $4.950 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 48.000 $2.000 $2.340 $2.000 $1.500
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 240.000 $95.000 $78.690 $200.000 $125.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 240.000 $25.000 $10.250 $5.000 $10.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 240.000 $20.000 $37.900 $19.000 $25.000
CONC CURB & GUTTER (TY II)
LF 72.000 $50.000 $89.300 $48.000 $75.000
DRIVEWAYS (CONC)
SY 67.000 $85.000 $203.890 $122.000 $250.000
CONC SIDEWALKS (5")
SY 72.000 $200.000 $318.650 $82.000 $125.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 4.000 $100.000 $263.250 $79.100 $275.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 4,510.000 $1.500 $1.050 $1.500 $1.650
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 108.000 $1.500 $1.050 $2.000 $2.200
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 7,617.000 $1.500 $1.050 $1.500 $1.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 716.000 $2.000 $1.400 $1.400 $1.540
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 88.000 $10.000 $11.700 $10.000 $11.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 1,360.000 $1.000 $0.420 $0.500 $0.550
REFL PAV MRK TY II (W) 6" (SLD)
LF 309.000 $1.000 $0.420 $0.500 $0.550
REFL PAV MRK TY II (W) 8" (SLD)
LF 716.000 $1.000 $0.570 $0.700 $0.770
REFL PAV MRK TY II (W) 24" (SLD)
LF 88.000 $5.000 $5.850 $2.000 $2.200
REFL PAV MRK TY II (Y) 6" (BRK)
LF 1,209.000 $1.250 $0.420 $0.500 $0.550
REFL PAV MRK TY II (Y) 6" (SLD)
LF 5,888.000 $1.250 $0.420 $1.000 $0.550
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,360.000 $1.250 $1.030 $1.100 $1.210
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 309.000 $0.750 $1.030 $1.100 $1.210
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,209.000 $0.750 $1.030 $1.100 $1.210
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,888.000 $0.750 $1.030 $1.000 $1.100
REFL PAV MRKR TY I-C
EA 71.000 $6.000 $9.360 $4.000 $4.400
REFL PAV MRKR TY II-A-A
EA 144.000 $6.000 $9.360 $4.000 $4.400
ELIM EXT PAV MRK & MRKS (4")
LF 1,333.000 $1.000 $5.850 $0.990 $1.100
PAV SURF PREP FOR MRK (6")
LF 90.000 $1.000 $1.170 $0.750 $0.830
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 95.000 $150.000 $397.800 $340.000 $275.000
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
TON 28.000 $200.000 $421.200 $360.000 $753.000
TACK COAT
GAL 104.000 $10.000 $11.700 $10.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $11,700.000 $50,000.000 $12,000.000
TMA (STATIONARY)
DAY 210.000 $190.000 $52.650 $206.000 $155.000
Totals: $1,231,106.250 $1,513,118.102 $1,648,887.120 $1,808,198.690