TARRANT CS (0902-90-125)

Items: 101

County: TARRANT
Length: N/A
Highway: CS
District: FORT WORTH
Control Number: 0902-90-125
DBE Goal: N/A
Project: BR 2022(252)
Guaranty: N/A
Time: 217 WORKING DAYS
Engineer's Estimate: $3,578,676.65
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
DAVID NEELEY
RUSSELL POER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$3,578,676.65
$3,861,246.79
Over/Under Est: 7.9% $282,570.14
$3,918,306.00
Over/Under Est: 9.49% $339,629.35
Amt Left: 1.48% $57,059.21
Over/Under Est: 11.65% $416,761.98
Amt Left: 3.48% $134,191.84
Delta: -1.97% -$77,132.63
Over/Under Est: 23.45% $839,287.07
Amt Left: 14.42% $556,716.93
Delta: -10.58% -$422,525.09
$4,428,457.95
Over/Under Est: 23.75% $849,781.30
Amt Left: 14.69% $567,211.16
Delta: -0.24% -$10,494.23
$5,279,025.84
Over/Under Est: 47.51% $1,700,349.19
Amt Left: 36.72% $1,417,779.05
Delta: -19.21% -$850,567.89
Subcontractor Percentage Amount
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 6.62% $252,950.24
TEXAS SHAFTS, INC. 6.48% $247,600.83
HERMANOS STEEL, LLC 3.89% $148,636.92
FORTSON CONTRACTING, INC. 0.76% $29,039.60
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.64% $24,454.40
KING GEORGE TRAFFIC SOLUTIONS LLC 0.55% $21,015.50
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.52% $19,869.20
A BROTHERS MILLING, LLC 0.44% $16,812.40
TNT CRANE & RIGGING, INC. 0.32% $12,227.20
FC TRAFFIC CONTROL, INC. 0.25% $9,552.50
C. GREEN SCAPING, L.P. 0.22% $8,406.20
SOUTHEAST GRINDING AND GROOVING LLC 0.22% $8,406.20
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.01% $382.10
VISTA RIDGE CONCRETE PUMPING, INC. 0.00% $0.00
HILBASH INVESTMENT LLC 0.00% $0.00
PROFESSIONAL SERVICE INDUSTRIES, INC. 0.00% $0.00
DAVIS MOTOR CRANE SERVICE, INC. 0.00% $0.00
KING & GEORGE, LLC 0.00% $0.00
Total: 20.92% $799,353.29

Bid Items & Bid Tabulations

101 Total 0 of 101
TARRANT  |  CS  |  FORT WORTH  |  0902-90-125  |  01/06/2023  |  $3,578,676.65  |  BR 2022(252)  |  BRIDGE REPL  |  217 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INDUS ROAD & BRIDGE, INC.
IBCTX, LLC
ED BELL CONSTRUCTION COMPANY
RAGLE CONSTRUCTION, INC.
REBCON, LLC
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 8.020 $10,000.000 $4,916.770 $8,000.000 $21,000.000 $33,250.000 $20,000.000 $12,763.270
REMOVING CONC (RIPRAP)
SY 71.000 $15.000 $43.000 $33.000 $25.000 $25.000 $8.000 $17.610
REMOVING CONC (SIDEWALKS)
SY 135.000 $25.000 $20.000 $22.000 $25.000 $17.000 $24.000 $28.160
REMOVING CONC (CURB AND GUTTER)
LF 557.000 $20.000 $25.000 $22.000 $12.500 $13.000 $9.000 $13.020
REMOVING CONC (FLUME)
SY 22.000 $20.000 $30.000 $55.000 $50.000 $35.000 $59.000 $95.720
EXCAVATION (ROADWAY)
CY 317.000 $17.000 $60.000 $120.000 $50.000 $84.000 $45.000 $31.910
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 317.000 $15.000 $40.000 $132.000 $50.000 $33.000 $35.000 $63.820
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 189.000 $25.000 $45.000 $132.000 $150.000 $60.000 $55.000 $63.820
COMPOST MANUF TOPSOIL (4")
SY 3,405.000 $2.500 $3.500 $9.000 $2.500 $2.450 $8.000 $2.300
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 780.000 $1.000 $3.750 $4.000 $3.500 $3.550 $3.000 $1.600
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 2,625.000 $1.000 $1.200 $2.000 $1.000 $1.050 $1.100 $1.150
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,703.000 $1.000 $1.750 $2.000 $1.500 $1.600 $1.600 $0.980
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,703.000 $1.000 $1.750 $2.000 $1.500 $1.600 $1.600 $1.000
VEGETATIVE WATERING
MG 34.000 $20.000 $52.000 $300.000 $200.000 $189.830 $300.000 $127.630
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 803.000 $5.000 $1.600 $5.000 $2.000 $1.500 $3.500 $2.010
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 464.000 $70.000 $120.000 $143.000 $150.000 $93.000 $160.000 $133.520
LIME (HYDRATED LIME (SLURRY))
TON 18.000 $275.000 $400.000 $500.000 $400.000 $280.000 $288.000 $309.420
LIME TRT (EXST MATL)(8")
SY 1,030.000 $12.000 $5.000 $17.000 $30.000 $16.000 $22.000 $5.750
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
SY 2,384.000 $6.500 $11.000 $10.000 $14.000 $11.000 $11.000 $12.760
SALV, HAUL STKPL RCL ASPH PAV(0"TO 24")
SY 54.000 $20.000 $35.000 $10.000 $21.000 $50.000 $10.000 $63.820
PRIME COAT (MC-30 OR EC-30)
GAL 692.000 $15.000 $11.000 $11.000 $10.000 $9.500 $6.000 $3.860
CEM STABIL BKFL
CY 172.000 $175.000 $300.000 $280.000 $300.000 $130.000 $380.000 $144.020
TEMPORARY SPL SHORING
SF 1,240.000 $65.000 $45.000 $22.000 $1.000 $19.000 $5.000 $28.150
DRILL SHAFT (18 IN)
LF 100.000 $125.000 $225.000 $200.000 $165.000 $175.000 $234.000 $357.370
DRILL SHAFT (24 IN)
LF 1,536.000 $200.000 $235.000 $225.000 $210.000 $250.000 $265.000 $372.450
CL A CONC (FLUME)
CY 9.000 $1,000.000 $500.000 $1,400.000 $1,500.000 $660.000 $1,160.000 $1,297.210
CL C CONC (ABUT)(HPC)
CY 52.000 $1,200.000 $1,100.000 $3,000.000 $3,000.000 $1,125.000 $2,600.000 $2,276.440
CL C CONC (CAP)(HPC)
CY 51.000 $1,200.000 $1,700.000 $3,000.000 $3,000.000 $2,100.000 $2,650.000 $1,880.730
CL C CONC (COLUMN)(HPC)
CY 28.800 $1,000.000 $1,500.000 $3,000.000 $3,000.000 $2,110.000 $2,200.000 $1,401.770
REINF CONC SLAB (HPC)
SF 10,880.000 $25.000 $19.000 $21.000 $30.000 $23.500 $18.000 $61.770
APPROACH SLAB (HPC)
CY 108.000 $650.000 $800.000 $1,100.000 $850.000 $613.000 $1,100.000 $1,897.640
PRESTR CONC SLAB BEAM (4SB15)
LF 632.020 $280.000 $260.000 $275.000 $250.000 $237.000 $330.000 $414.380
PRESTR CONC SLAB BEAM (5SB15)
LF 1,580.060 $280.000 $270.000 $275.000 $250.000 $228.000 $340.000 $336.870
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 10.000 $500.000 $800.000 $1,700.000 $700.000 $790.000 $1,500.000 $537.840
RIPRAP (STONE PROTECTION)(12 IN)
CY 435.000 $155.000 $208.000 $240.000 $175.000 $132.000 $235.000 $206.050
RIPRAP (MOW STRIP)(4 IN)
CY 6.000 $675.000 $525.000 $1,100.000 $750.000 $828.000 $1,170.000 $543.370
RIPRAP (MOW STRIP)(6 IN)
CY 18.000 $1,040.000 $560.000 $1,100.000 $750.000 $690.000 $1,100.000 $655.310
STR STEEL (MISC NON - BRIDGE)
LB 462.000 $15.000 $25.000 $35.000 $25.000 $23.000 $30.000 $41.350
RAIL (TY T223)(HPC)
LF 130.000 $185.000 $190.000 $160.000 $200.000 $179.000 $388.000 $168.510
RAIL (TY C221)(HPC)
LF 400.000 $120.000 $235.000 $220.000 $150.000 $140.000 $255.000 $186.110
RAIL (TY PR11)
LF 372.000 $150.000 $155.000 $150.000 $111.000 $120.000 $125.000 $303.770
ARMOR JOINT (SEALED)
LF 195.000 $120.000 $120.000 $150.000 $150.000 $116.000 $140.000 $153.390
CONC BOX CULV (6 FT X 6 FT)
LF 136.000 $1,000.000 $890.000 $900.000 $800.000 $815.000 $1,050.000 $1,358.010
RC PIPE (CL III)(36 IN)
LF 235.000 $250.000 $275.000 $200.000 $200.000 $140.000 $350.000 $280.790
MANH (COMPL)(PRM)(60IN)
EA 1.000 $7,500.000 $6,900.000 $7,500.000 $11,500.000 $5,800.000 $10,800.000 $8,806.660
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 1.000 $8,000.000 $8,700.000 $8,000.000 $18,200.000 $6,200.000 $10,700.000 $10,670.090
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $20,000.000 $32,000.000 $42,000.000 $55,000.000 $49,000.000 $53,000.000 $64,979.210
SET (TY II) (36 IN) (RCP) (4: 1) (P)
EA 1.000 $6,500.000 $5,000.000 $5,000.000 $4,100.000 $4,300.000 $9,200.000 $5,756.230
ADJUSTING MANHOLES (SANITARY)
EA 1.000 $2,000.000 $1,500.000 $2,500.000 $2,500.000 $2,200.000 $5,300.000 $1,892.140
REMOV STR (BOX CULVERT)
EA 1.000 $71,600.000 $15,000.000 $15,000.000 $25,000.000 $100,000.000 $38,000.000 $21,719.910
REMOV STR (INLET)
EA 1.000 $1,050.000 $2,000.000 $2,500.000 $1,500.000 $1,000.000 $3,000.000 $687.990
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $90,000.000 $77,000.000 $60,000.000 $125,000.000 $450,000.000 $190,000.000 $208,424.190
MOBILIZATION
LS 1.000 $281,642.000 $380,000.000 $391,000.000 $348,000.000 $440,000.000 $328,400.000 $510,530.780
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $15,000.000 $15,000.000 $3,500.000 $9,000.000 $30,000.000 $15,000.000 $15,315.920
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 190.000 $50.000 $70.000 $45.000 $40.000 $36.000 $38.000 $53.370
ROCK FILTER DAMS (REMOVE)
LF 190.000 $20.000 $30.000 $30.000 $20.000 $19.000 $27.000 $12.770
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 225.000 $25.000 $46.000 $50.000 $20.000 $25.000 $42.000 $30.680
CONSTRUCTION EXITS (REMOVE)
SY 225.000 $15.000 $12.000 $30.000 $10.000 $10.000 $27.000 $9.670
TEMP SEDMT CONT FENCE (INSTALL)
LF 482.000 $3.000 $5.000 $8.000 $5.000 $1.900 $5.000 $3.920
TEMP SEDMT CONT FENCE (REMOVE)
LF 482.000 $1.000 $2.000 $3.000 $1.000 $0.840 $1.350 $0.930
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 44.000 $7.000 $10.000 $25.000 $12.000 $3.750 $18.000 $5.810
BIODEG EROSN CONT LOGS (REMOVE)
LF 44.000 $2.000 $2.000 $20.000 $2.000 $1.000 $12.000 $1.730
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 780.000 $45.000 $65.000 $75.000 $30.000 $60.000 $87.000 $95.530
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $65.000 $90.000 $75.000 $60.000 $60.000 $87.000 $95.530
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 440.000 $10.000 $11.000 $25.000 $10.000 $9.000 $20.000 $28.340
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $12.000 $14.000 $25.000 $20.000 $9.000 $20.000 $28.340
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 780.000 $10.000 $20.000 $30.000 $15.000 $11.000 $23.000 $17.700
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $12.000 $36.000 $30.000 $30.000 $11.000 $23.000 $17.700
CONC CURB & GUTTER (TY II)
LF 560.000 $65.000 $29.000 $35.000 $75.000 $30.000 $40.000 $32.610
CONC SIDEWALKS (4")
SY 182.000 $75.000 $89.000 $95.000 $100.000 $66.000 $145.000 $65.830
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $35.000 $27.000 $24.000 $21.000 $20.000 $22.000 $30.790
MTL BEAM GD FEN TRANS (TL2)
EA 8.000 $1,900.000 $1,290.000 $1,100.000 $997.500 $950.000 $1,045.000 $1,581.300
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,925.000 $1,420.000 $1,300.000 $1,102.500 $1,050.000 $1,155.000 $1,675.460
REMOVE METAL BEAM GUARD FENCE
LF 446.000 $3.500 $4.000 $6.000 $3.150 $3.000 $3.300 $2.780
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $4,275.000 $3,800.000 $3,100.000 $2,940.000 $2,800.000 $3,080.000 $3,869.450
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $725.000 $1,050.000 $1,000.000 $945.000 $900.000 $550.000 $748.120
IN SM RD SN SUP&AM TYFRP(1)UA(P)
EA 1.000 $750.000 $815.000 $90.000 $1,575.000 $75.000 $715.000 $797.880
REMOVE SM RD SN SUP&AM
EA 4.000 $165.000 $69.000 $200.000 $78.750 $100.000 $150.000 $167.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $40.000 $27.000 $90.000 $21.000 $20.000 $22.000 $38.670
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $40.000 $27.000 $90.000 $21.260 $20.250 $22.300 $29.450
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $75.000 $6.000 $70.000 $5.250 $5.000 $5.500 $28.450
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $40.000 $30.000 $90.000 $26.250 $25.000 $27.500 $32.880
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $40.000 $34.000 $90.000 $26.780 $25.500 $28.000 $39.400
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,938.000 $1.250 $1.000 $1.500 $1.020 $0.970 $1.400 $1.390
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 107.000 $10.000 $12.000 $13.000 $11.550 $11.000 $15.000 $5.110
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,110.000 $1.250 $1.000 $1.500 $1.020 $0.970 $1.400 $1.390
REFL PAV MRK TY II (W) 4" (BRK)
LF 467.000 $1.500 $1.000 $1.500 $0.840 $0.800 $1.500 $0.660
REFL PAV MRK TY II (W) 4" (SLD)
LF 539.000 $1.500 $1.000 $1.500 $0.840 $0.800 $1.600 $0.660
REFL PAV MRK TY II (Y) 4" (SLD)
LF 4,354.000 $1.500 $0.900 $1.000 $0.690 $0.660 $1.600 $0.640
PAVEMENT SEALER 4"
LF 5,360.000 $0.750 $0.400 $0.500 $0.370 $0.350 $0.060 $0.260
REFL PAV MRKR TY II-A-A
EA 55.000 $5.000 $11.000 $12.000 $10.500 $10.000 $6.600 $5.620
ELIM EXT PAV MRK & MRKS (4")
LF 1,311.000 $1.250 $1.000 $2.000 $1.050 $1.000 $1.100 $1.140
PAV SURF PREP FOR MRK (4")
LF 5,360.000 $0.750 $0.700 $1.000 $0.680 $0.650 $0.060 $0.320
PAV SURF PREP FOR MRK (RPM)
EA 55.000 $2.000 $0.500 $1.000 $0.530 $0.500 $0.550 $0.630
INSTALL HWY TRF SIG (FLASH BEACON)
EA 2.000 $10,000.000 $8,000.000 $10,000.000 $20,000.000 $10,000.000 $6,000.000 $6,895.970
TACK COAT
GAL 613.000 $5.000 $14.000 $11.000 $10.000 $9.800 $6.000 $4.240
D-GR HMA TY-C PG 70-28 (EXEMPT)
TON 1,189.000 $180.000 $244.000 $200.000 $200.000 $170.400 $175.000 $191.450
D-GR HMA TY-D PG70-22(LEVEL-UP)(EXEMPT)
TON 222.000 $150.000 $244.000 $200.000 $200.000 $170.400 $220.000 $223.360
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 765.000 $165.000 $102.000 $25.000 $75.000 $71.000 $75.000 $107.400
TMA (STATIONARY)
DAY 285.000 $200.000 $475.000 $50.000 $157.500 $292.000 $180.000 $200.980
TMA (MOBILE OPERATION)
DAY 3.000 $550.000 $1,155.000 $250.000 $750.000 $670.000 $300.000 $360.740
Totals: $3,578,676.650 $3,861,246.795 $3,918,306.000 $3,995,438.630 $4,417,963.720 $4,428,457.950 $5,279,025.861