REMOVING CONC (RIPRAP)
|
SY
|
33.000
|
$28.000
|
$40.000
|
$30.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
404.000
|
$30.000
|
$25.000
|
$30.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
985.000
|
$7.000
|
$10.000
|
$12.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
30.000
|
$65.000
|
$500.000
|
$240.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
15.000
|
$35.000
|
$120.000
|
$210.000
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
46.000
|
$100.000
|
$40.000
|
$258.000
|
|
|
GENERAL USE COMPOST (4")
|
SY
|
1,146.000
|
$5.000
|
$4.800
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
1,146.000
|
$30.000
|
$8.500
|
$6.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,146.000
|
$0.400
|
$0.500
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
1,146.000
|
$0.400
|
$0.510
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
171.000
|
$400.000
|
$40.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
659.000
|
$20.000
|
$15.000
|
$54.000
|
|
|
CEMENT
|
TON
|
12.000
|
$450.000
|
$334.000
|
$840.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
739.000
|
$4.500
|
$10.000
|
$23.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (0 TO 6")
|
SY
|
659.000
|
$5.000
|
$10.000
|
$20.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
132.000
|
$9.000
|
$30.000
|
$36.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
10,102.000
|
$28.000
|
$52.500
|
$100.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
1,968.000
|
$13.000
|
$9.000
|
$15.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
354.000
|
$265.000
|
$120.000
|
$225.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
11.000
|
$900.000
|
$805.000
|
$1,200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
3.000
|
$750.000
|
$1,040.000
|
$1,500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
40.000
|
$850.000
|
$680.000
|
$1,000.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
4,689.000
|
$6.500
|
$6.000
|
$14.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$350,000.000
|
$238,000.000
|
$400,000.000
|
|
|
RAIL (TY C411)
|
LF
|
450.000
|
$300.000
|
$220.000
|
$350.000
|
|
|
RETROFIT RAIL (TY C411)
|
LF
|
134.000
|
$400.000
|
$335.000
|
$400.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
90.000
|
$175.000
|
$150.000
|
$500.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
102.000
|
$145.000
|
$250.000
|
$250.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$2,850.000
|
$2,500.000
|
$5,300.000
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
600.000
|
$120.000
|
$225.000
|
$230.000
|
|
|
PIPE (PVC) (SCH 40) (12 IN)
|
LF
|
200.000
|
$325.000
|
$240.000
|
$190.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
1.000
|
$250,000.000
|
$643,000.000
|
$500,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$242,424.240
|
$310,000.000
|
$499,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$10,000.000
|
$35,000.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
72.000
|
$40.000
|
$32.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
72.000
|
$15.000
|
$16.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$40.000
|
$31.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$16.000
|
$14.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,632.000
|
$4.000
|
$3.250
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,632.000
|
$1.500
|
$1.000
|
$3.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
404.000
|
$130.000
|
$60.000
|
$150.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,600.000
|
$65.000
|
$120.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$65.000
|
$120.000
|
$100.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,600.000
|
$20.000
|
$10.000
|
$50.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$25.000
|
$10.000
|
$50.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
296.000
|
$65.000
|
$35.000
|
$70.000
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
450.000
|
$65.000
|
$55.000
|
$120.000
|
|
|
CONC MEDIAN
|
SY
|
404.000
|
$150.000
|
$65.000
|
$216.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
413.000
|
$60.000
|
$28.500
|
$36.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,200.000
|
$900.000
|
$1,400.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,300.000
|
$2,200.000
|
$2,800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,600.000
|
$1,200.000
|
$1,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
517.000
|
$8.000
|
$3.500
|
$6.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,350.000
|
$2,875.000
|
$3,600.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$30.000
|
$25.000
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,342.000
|
$1.000
|
$2.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
28.000
|
$1.250
|
$3.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,065.000
|
$1.000
|
$2.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
116.000
|
$1.750
|
$2.000
|
$12.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
200.000
|
$1.500
|
$2.000
|
$12.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,889.000
|
$2.000
|
$1.750
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
890.000
|
$4.500
|
$6.500
|
$10.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
169.000
|
$15.000
|
$14.750
|
$12.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
3.000
|
$230.000
|
$190.000
|
$300.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
3.000
|
$240.000
|
$250.000
|
$300.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
3,380.000
|
$1.000
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
637.000
|
$1.000
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
2,889.000
|
$1.250
|
$1.100
|
$1.000
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
922.000
|
$2.000
|
$4.000
|
$4.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
169.000
|
$4.000
|
$9.000
|
$5.000
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
3.000
|
$145.000
|
$150.000
|
$120.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
3.000
|
$135.000
|
$200.000
|
$120.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
421.000
|
$1.000
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,380.000
|
$1.100
|
$2.500
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
637.000
|
$1.100
|
$2.500
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
421.000
|
$1.300
|
$2.500
|
$2.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
189.000
|
$5.250
|
$10.000
|
$9.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,051.000
|
$0.750
|
$0.670
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,017.000
|
$0.500
|
$0.500
|
$1.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
173.000
|
$81.000
|
$150.000
|
$100.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
152.000
|
$135.000
|
$174.000
|
$210.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
76.000
|
$180.000
|
$230.000
|
$275.000
|
|
|
TACK COAT
|
GAL
|
146.000
|
$5.000
|
$8.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$12,000.000
|
$15,000.000
|
$42,000.000
|
|
|
REFL PAV MRKR TY II A-A
|
EA
|
22.000
|
$6.000
|
$10.000
|
$9.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
1,640.000
|
$30.000
|
$5.000
|
$40.000
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
1,640.000
|
$3.000
|
$0.500
|
$20.000
|
|
|
TMA (STATIONARY)
|
DAY
|
186.000
|
$175.000
|
$100.000
|
$100.000
|
|
|
WATER LINE GROUTING
|
CY
|
30.000
|
$350.000
|
$650.000
|
$450.000
|
|
|
4"-12" WATER ABANDONMENT PLUG
|
EA
|
4.000
|
$700.000
|
$1,725.000
|
$6,500.000
|
|
|
REMOVE 12" WATER VALVE
|
EA
|
3.000
|
$700.000
|
$1,700.000
|
$6,500.000
|
|
|
12' WIDE ACP REPAIR, ARTERIAL
|
LF
|
60.000
|
$175.000
|
$170.000
|
$350.000
|
|
|
6" CONC CURB AND GUTTER*
|
LF
|
60.000
|
$45.000
|
$45.000
|
$70.000
|
|
|
6" CONC PVMT
|
SY
|
70.000
|
$200.000
|
$105.000
|
$342.000
|
|
|
TRENCH SAFETY
|
LF
|
65.000
|
$10.000
|
$25.000
|
$50.000
|
|
|
CONSTRUCTION STAKING
|
EA
|
1.000
|
$5,000.000
|
$2,700.000
|
$30,000.000
|
|
|
AS-BUILT SURVEY
|
EA
|
1.000
|
$2,500.000
|
$5,000.000
|
$30,000.000
|
|
|
TRAFFIC CONTROL
|
MO
|
2.000
|
$10,000.000
|
$12,500.000
|
$50,000.000
|
|
|
REMOVE 12" CI WATER PIPE FROM BRIDGE
|
LF
|
282.000
|
$250.000
|
$150.000
|
$1,000.000
|
|
|
WATER CONSTRUCTION ALLOWANCE
|
LS
|
1.000
|
$20,000.000
|
$20,000.000
|
$34,000.000
|
|
Totals: |
$2,637,352.290
|
$3,188,000.330
|
$4,999,315.000
|