Show Job Controls
Bid Cobra

TARRANT VA (0902-00-337)

Items: 28

County: TARRANT
Length: N/A
Highway: VA
District: FORT WORTH
Control Number: 0902-00-337
DBE Goal: N/A
Project: F 2023(240)
Guaranty: N/A
Time: 80 WORKING DAYS
Engineer's Estimate: $1,140,179.25
Date: 11/03/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE BRIDGE
Mail/Deliver Bids To: N/A
JANET CRAWFORD
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,140,179.25
1
$996,994.97
Over/Under Est: -12.56% -$143,184.28
Over/Under Est: -2.16% -$24,588.21
Amt Left: 11.9% $118,596.07
Over/Under Est: 23.97% $273,298.25
Amt Left: 41.77% $416,482.53
Delta: -26.70% -$297,886.46
Over/Under Est: 32.9% $375,080.00
Amt Left: 51.98% $518,264.28
Delta: -7.20% -$101,781.75
$1,585,343.31
Over/Under Est: 39.04% $445,164.06
Amt Left: 59.01% $588,348.34
Delta: -4.63% -$70,084.06
$1,791,701.00
Over/Under Est: 57.14% $651,521.75
Amt Left: 79.71% $794,706.03
Delta: -13.02% -$206,357.69

Bid Items & Bid Tabulations

28 Total 0 of 28
TARRANT  |  VA  |  FORT WORTH  |  0902-00-337  |  11/03/2022  |  $1,140,179.25  |  F 2023(240)  |  REHAB BRIDGE  |  80 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
3LW CIVIL LLC
SHALOM SERVICES CORPORATION
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
RAGLE CONSTRUCTION, INC.
ALTUS CONSTRUCTION LLC
IBCTX, LLC
PREPARING ROW
STA 18.000 $5,000.000 $1,000.000 $1,800.000 $1,000.000 $5,000.000 $7,646.490 $8,000.000
REMOVING CONC (RIPRAP)
SY 355.000 $25.000 $26.000 $10.000 $35.000 $13.000 $10.550 $25.000
EXCAVATION (CHANNEL)
CY 437.000 $40.000 $35.000 $28.000 $65.000 $32.000 $74.800 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 843.000 $30.000 $36.500 $16.000 $25.000 $49.000 $54.150 $50.000
FLOWABLE BACKFILL
CY 11.000 $8,000.000 $285.000 $320.000 $400.000 $600.000 $213.840 $1,000.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 226.000 $15.000 $25.000 $3.000 $30.000 $25.000 $35.680 $50.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 71.000 $200.000 $170.000 $150.000 $200.000 $135.000 $335.590 $275.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 24.000 $300.000 $295.500 $175.000 $500.000 $480.000 $213.600 $600.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 351.000 $200.000 $165.000 $150.000 $220.000 $100.000 $308.640 $240.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 4,774.100 $105.000 $129.750 $160.000 $175.000 $162.500 $158.200 $170.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 411.000 $40.000 $33.000 $40.000 $50.000 $28.000 $35.680 $60.000
HEADER TYPE EXPANSION JOINT
CF 61.000 $450.000 $389.000 $300.000 $600.000 $450.000 $1,011.890 $600.000
MOBILIZATION
LS 1.000 $91,928.750 $50,000.000 $10,000.000 $110,000.000 $140,000.000 $152,929.850 $179,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $8,000.000 $6,500.000 $5,000.000 $9,400.000 $34,750.000 $15,292.980 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 280.000 $30.000 $29.000 $30.000 $38.000 $45.000 $38.730 $65.000
ROCK FILTER DAMS (REMOVE)
LF 280.000 $18.000 $5.000 $8.000 $15.000 $20.000 $12.750 $50.000
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 444.000 $25.000 $18.000 $40.000 $25.000 $75.000 $38.540 $105.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $8.500 $6.000 $8.000 $7.000 $15.000 $9.660 $50.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,498.000 $3.000 $4.000 $3.730 $6.000 $7.000 $5.800 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,498.000 $3.000 $1.000 $0.750 $8.000 $1.000 $1.730 $3.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 60.000 $120.000 $65.000 $240.000 $120.000 $110.000 $254.880 $200.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 60.000 $60.000 $12.000 $240.000 $20.000 $35.000 $254.880 $200.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $2,400.000 $1,000.000 $2,400.000 $1,000.000 $800.000 $1,279.080 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $2,500.000 $15,000.000 $12,000.000 $7,500.000 $4,936.210 $12,000.000
CONCRETE POST REPLACEMENT
EA 3.000 $4,000.000 $500.000 $1,000.000 $3,500.000 $3,400.000 $2,548.830 $10,000.000
CONCRETE BEAM REPAIR (CFRP)
EA 4.000 $10,000.000 $11,214.000 $10,000.000 $15,000.000 $13,100.000 $10,039.210 $20,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 113.000 $110.000 $105.000 $20.000 $100.000 $60.000 $142.990 $250.000
TMA (STATIONARY)
DAY 11.000 $283.000 $100.000 $100.000 $285.000 $325.000 $254.880 $500.000
Totals: $1,140,179.250 $996,994.975 $1,115,591.040 $1,413,477.500 $1,515,259.250 $1,585,343.310 $1,791,701.000