Show Job Controls
Bid Cobra

TARRANT VARIOUS (0902-00-299)

Items: 152

County: TARRANT
Length: 0.0000 MILES
Highway: VARIOUS
District: FORT WORTH
Control Number: 0902-00-299
DBE Goal: 0.0%
Project: C 902-00-299
Guaranty: $78,000.00
Time: 768 WORKING DAYS
Engineer's Estimate: $3,901,065.00
Date: 03/04/2025 (1 year ago)
Contract Number: 3253017
Type: INSTALL/REHABILITATE ITS
Project ID: A00135507
Project Description: FY25 NON-SITE SPECIFIC ITS.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
THERESA POER
CARLOS MOLINA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,901,065.00
$4,204,056.00
Over/Under Est: 7.77% $302,991.00
$4,980,251.00
Over/Under Est: 27.66% $1,079,186.00
Amt Left: 18.46% $776,195.00
$5,169,052.00
Over/Under Est: 32.5% $1,267,987.00
Amt Left: 22.95% $964,996.00
Delta: -3.79% -$188,801.00
Subcontractor Percentage Amount
ALBATROSS CONSTRUCTION LLC 6.83% $287,137.02
SUPERIOR TRAFFIC CONTROL, LLC 0.43% $18,077.44
Total: 7.26% $305,214.46

Bid Items & Bid Tabulations

152 Total 0 of 152
TARRANT  |  VARIOUS  |  FORT WORTH  |  0902-00-299  |  03/04/2025  |  $3,901,065.00  |  C 902-00-299  |  INSTL/REHAB ITS  |  768 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELECNOR BELCO ELECTRIC, INC.
LIGHT IT UP ELECTRIC
MICA CORPORATION
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 2,000.000 $2.000 $35.000 $3.000 $3.300
CELL FBR MLCH SEED(TEMP)(COOL)
SY 2,000.000 $2.000 $35.000 $3.000 $3.300
VEGETATIVE WATERING
MG 100.000 $300.000 $400.000 $300.000 $165.000
DRILL SHAFT (36 IN)
LF 30.000 $270.000 $420.000 $450.000 $660.000
DRILL SHAFT (42 IN)
LF 30.000 $300.000 $470.000 $575.000 $676.500
DRILL SHAFT (48 IN)
LF 350.000 $560.000 $570.000 $700.000 $693.000
DRILL SHAFT (54 IN)
LF 200.000 $520.000 $1,000.000 $900.000 $896.500
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 60.000 $790.000 $1,500.000 $1,000.000 $902.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 20.000 $400.000 $375.000 $385.000 $401.500
RIPRAP (CONC) (CL A )
CY 24.000 $2,000.000 $1,000.000 $2,000.000 $2,200.000
RIPRAP (CONC)(CL B)
CY 1.400 $3,240.000 $1,800.000 $2,200.000 $2,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $850.000 $1,000.000 $2,200.000 $2,200.000
MOBILIZATION
LS 1.000 $354,300.000 $225,136.000 $460,000.000 $495,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 36.000 $8,000.000 $5,000.000 $14,000.000 $13,750.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 250.000 $4.200 $12.000 $7.000 $14.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 250.000 $1.600 $5.000 $2.000 $6.600
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 250.000 $11.400 $10.000 $10.000 $7.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 250.000 $5.000 $5.000 $3.000 $5.500
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $32.000 $40.000 $28.000 $38.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,390.000 $2,800.000 $2,650.000 $3,025.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,270.000 $1,900.000 $1,600.000 $1,925.000
MTL W-BEAM GD FEN (NESTED)(TIM POST)
LF 25.000 $50.000 $50.000 $45.000 $38.500
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,200.000 $4,000.000 $3,500.000 $4,125.000
IN RD IL (TY ST) 40T-8 (250W EQ) LED
EA 2.000 $4,950.000 $13,000.000 $4,800.000 $4,675.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 2.000 $49,300.000 $62,000.000 $62,000.000 $54,340.000
CONDT (PVC) (SCH 40) (2")
LF 500.000 $25.000 $30.000 $20.000 $19.250
CONDT (PVC) (SCH 40) (3")
LF 4,000.000 $29.000 $35.000 $28.000 $18.150
CONDT (PVC) (SCH 40) (3") (STL ENCSE)
LF 40.000 $90.000 $40.000 $100.000 $88.000
CONDT (PVC) (SCH 40) (4")
LF 50.000 $49.000 $45.000 $32.000 $22.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 100.000 $37.000 $40.000 $40.000 $40.700
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,000.000 $42.000 $45.000 $43.000 $53.900
CONDT (PVC) (SCH 80) (4") (BORE)
LF 50.000 $45.000 $54.000 $50.000 $53.900
CONDT (RM) (1 1/2")
LF 70.000 $28.000 $60.000 $40.000 $55.000
CONDT (RM) (2")
LF 50.000 $45.000 $70.000 $70.000 $60.500
CONDT (RM) (3")
LF 50.000 $120.000 $80.000 $100.000 $115.200
ELEC CONDR (NO.8) BARE
LF 100.000 $3.100 $2.200 $3.250 $2.200
ELEC CONDR (NO.8) INSULATED
LF 300.000 $3.100 $2.200 $3.500 $2.310
ELEC CONDR (NO.6) BARE
LF 100.000 $3.800 $2.600 $5.000 $2.970
ELEC CONDR (NO.6) INSULATED
LF 300.000 $3.600 $2.600 $5.300 $3.080
ELEC CONDR (NO.4) BARE
LF 2,000.000 $3.800 $3.500 $6.300 $3.410
ELEC CONDR (NO.4) INSULATED
LF 4,000.000 $4.100 $3.500 $6.600 $4.070
ELEC CONDR (NO.2) BARE
LF 500.000 $4.200 $4.700 $8.100 $5.720
ELEC CONDR (NO.2) INSULATED
LF 1,500.000 $4.700 $4.700 $8.500 $6.160
ELEC CONDR (NO.1) BARE
LF 650.000 $5.600 $5.600 $9.500 $6.160
ELEC CONDR (NO.1) INSULATED
LF 1,300.000 $5.800 $5.600 $9.700 $6.380
ELEC CONDR (NO.1/0) BARE
LF 1,600.000 $6.400 $7.000 $10.000 $6.670
ELEC CONDR (NO.1/0) INSULATED
LF 3,200.000 $6.900 $7.000 $10.250 $7.150
ELEC CONDR (NO.2/0) BARE
LF 100.000 $7.200 $8.000 $10.500 $7.430
ELEC CONDR (NO.2/0) INSULATED
LF 300.000 $7.500 $8.000 $11.000 $8.030
ELEC CONDR (NO.3/0) BARE
LF 100.000 $7.800 $9.000 $11.500 $8.690
ELEC CONDR (NO.3/0) INSULATED
LF 300.000 $14.000 $9.000 $12.000 $9.520
GROUND BOX TY D (162922)W/APRON
EA 20.000 $2,640.000 $1,900.000 $2,200.000 $3,520.000
REMOVE GROUND BOX
EA 1.000 $500.000 $300.000 $800.000 $825.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $890.000 $1,000.000 $1,200.000 $1,100.000
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 1.000 $9,385.000 $8,500.000 $12,200.000 $13,200.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 15.000 $9,475.000 $7,800.000 $12,200.000 $11,000.000
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
EA 1.000 $9,170.000 $6,000.000 $11,000.000 $11,275.000
ELC SRV TY D 120/240 070(NS)SS(N)SP(U)
EA 2.000 $9,780.000 $7,500.000 $11,000.000 $11,275.000
ELC SRV TY D 120/240 070(NS)SS(N)PS(U)
EA 1.000 $9,385.000 $9,000.000 $12,500.000 $14,300.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $870.000 $800.000 $900.000 $1,650.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $740.000 $900.000 $900.000 $1,815.000
REMOVE SM RD SN SUP&AM
EA 1.000 $200.000 $200.000 $400.000 $550.000
INS OH SN SUP(35 FT BAL TEE)
EA 5.000 $46,900.000 $3,000.000 $68,000.000 $107,470.000
REMOVE OVERHD SIGN SUP
EA 1.000 $9,820.000 $1,500.000 $8,500.000 $11,000.000
SIGN WALKWAY (48 IN) WITH HNDRL
LF 45.000 $825.000 $100.000 $800.000 $797.500
REMOVE SIGN WALKWAY
EA 1.000 $2,610.000 $500.000 $3,800.000 $2,200.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 6.000 $167.000 $700.000 $75.000 $110.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
EA 6.000 $167.000 $700.000 $75.000 $110.000
REMOVAL OF TIMBER POLES
EA 1.000 $1,220.000 $2,500.000 $900.000 $825.000
REMOVE UNDERGROUND CONDUIT
LF 100.000 $45.000 $25.000 $3.000 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $160.000 $200.000 $250.000 $220.000
ITS COM CBL (ETHERNET)
LF 1,500.000 $6.300 $2.000 $7.000 $6.050
ITS COM CBL (SERIAL)
LF 350.000 $6.300 $2.000 $8.000 $11.000
FO CBL (6 SMF)(PIGTAIL)
LF 50.000 $11.000 $70.000 $50.000 $8.250
FO CBL (12 SMF)
LF 50.000 $6.500 $2.000 $9.000 $13.200
FO CBL (12 SMF)(PIGTAIL)
LF 100.000 $4.500 $80.000 $55.000 $16.500
FO CBL (24 SMF)
LF 100.000 $6.200 $2.600 $7.250 $11.000
FO CBL (36 SMF)
LF 1,000.000 $5.300 $3.100 $9.000 $8.250
FO CBL (72 SMF)
LF 1,000.000 $5.300 $3.500 $9.000 $6.600
FO SPLICE ENCLOSURE (TYPE 1)
EA 1.000 $2,675.000 $1,500.000 $2,900.000 $2,860.000
FO SPLICE ENCLOSURE (TYPE 2)
EA 1.000 $2,560.000 $1,800.000 $3,200.000 $3,217.500
FIBER OPTIC FUSION SPLICE
EA 100.000 $100.000 $120.000 $200.000 $88.000
RELOCATE FIBER OPTIC CABLE
LF 1,000.000 $13.250 $4.000 $11.000 $14.580
REMOVE FIBER OPTIC CABLE
LF 1,000.000 $2.400 $2.000 $2.500 $2.750
FO CBL (24 SMF)(PIGTAIL)
LF 100.000 $10.350 $385.000 $300.000 $17.600
PRETERM FIBER PATCH PANEL (6 POSITION)
EA 1.000 $1,440.000 $1,700.000 $1,800.000 $1,463.000
PRETERM FIBER PATCH PANEL (12 POSITION)
EA 1.000 $2,300.000 $2,000.000 $1,825.000 $1,661.000
PRETERM FIBER PATCH PANEL (24 POSITION)
EA 1.000 $2,760.000 $2,800.000 $1,850.000 $2,205.500
FIBER OPTIC JUMPERS
EA 10.000 $120.000 $150.000 $300.000 $40.000
ITS GRND MNT CAB (TY 6) (CONF 2) (REM)
EA 1.000 $2,500.000 $2,000.000 $4,500.000 $1,650.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 20.000 $9,370.000 $11,000.000 $11,300.000 $9,900.000
CCTV MOUNT (POLE)
EA 13.000 $670.000 $500.000 $1,200.000 $825.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $3,170.000 $1,500.000 $3,800.000 $3,575.000
RELOCATE CCTV FIELD EQUIPMENT
EA 1.000 $6,070.000 $2,000.000 $3,500.000 $6,325.000
REMOVE CCTV FIELD EQUIPMENT
EA 1.000 $2,560.000 $1,000.000 $1,500.000 $2,750.000
ITS MULTI-DUCT CND (PVC-40)
LF 1,000.000 $32.000 $50.000 $35.000 $40.980
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 100.000 $43.000 $50.000 $45.000 $40.980
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 100.000 $50.000 $80.000 $65.000 $49.500
FIBER OPTIC CABLE ROAD MARKER
EA 10.000 $260.000 $500.000 $250.000 $242.000
CABLE RACK ASSEMBLY (INSTALL)
EA 1.000 $700.000 $6,000.000 $500.000 $3,080.000
CONDUIT (PREPARE)
LF 1,000.000 $5.600 $8.000 $5.000 $5.500
JUNCTION BOX (INSTALL)
EA 1.000 $1,330.000 $1,200.000 $1,200.000 $3,850.000
GROUND BOX (PREPARE)
EA 10.000 $705.000 $650.000 $1,000.000 $1,045.000
INSTALL DMS (POLE MTD CABINET)
EA 5.000 $23,300.000 $3,500.000 $18,000.000 $29,700.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 1.000 $19,400.000 $3,500.000 $25,000.000 $36,300.000
ITS RADIO (SNGL)(900 MHZ)-C-O
EA 2.000 $3,500.000 $4,000.000 $4,050.000 $7,975.000
ITS RADIO (SNGL)(900 MHZ)-C-U
EA 2.000 $3,500.000 $4,200.000 $4,550.000 $7,975.000
ITS RADIO (SNGL)(5 GHZ)-I-U
EA 20.000 $8,090.000 $4,800.000 $7,800.000 $8,992.500
ITS RADIO (SNGL)(5 GHZ)-C-P
EA 2.000 $6,300.000 $5,800.000 $7,800.000 $10,532.500
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
EA 2.000 $5,400.000 $6,200.000 $8,200.000 $11,121.000
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-C-P
EA 2.000 $5,200.000 $8,400.000 $8,700.000 $11,550.000
RELOCATE ITS RADIO
EA 2.000 $4,695.000 $2,000.000 $5,850.000 $5,335.000
REMOVE ITS RADIO
EA 2.000 $3,025.000 $1,000.000 $4,025.000 $3,025.000
ITS POLE (30 FT)(REM)
EA 1.000 $1,420.000 $2,500.000 $925.000 $1,320.000
ITS POLE (40 FT)(90 MPH)
EA 1.000 $15,700.000 $20,000.000 $16,500.000 $15,950.000
ITS POLE (50 FT)(90 MPH)
EA 1.000 $18,470.000 $26,000.000 $25,300.000 $23,320.000
ITS POLE (60 FT)(90 MPH)
EA 9.000 $23,600.000 $35,000.000 $34,100.000 $26,950.000
ITS POLE (60 FT)(INST ONLY)
EA 5.000 $5,000.000 $4,500.000 $11,250.000 $7,507.500
ITS POLE (60 FT)(REL)
EA 1.000 $9,700.000 $4,500.000 $11,250.000 $9,900.000
ITS POLE (60 FT)(REM)
EA 1.000 $1,350.000 $2,500.000 $1,800.000 $1,457.500
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000 $7,720.000 $12,000.000 $8,500.000 $8,140.000
ITS POLE MNT CAB (TY 2)(CONF 2)(REL)
EA 1.000 $1,660.000 $5,000.000 $4,800.000 $5,610.000
ITS POLE MNT CAB (TY 2)(CONF 2)(REM)
EA 1.000 $600.000 $2,500.000 $1,900.000 $1,100.000
ITS POLE MNT CAB (TY 3)(CONF 2)
EA 13.000 $8,700.000 $14,000.000 $9,000.000 $8,690.000
ITS POLE MNT CAB (TY 3)(CONF 2)(REL)
EA 1.000 $3,020.000 $5,000.000 $4,000.000 $5,720.000
ITS POLE MNT CAB (TY 3)(CONF 2)(REM)
EA 1.000 $600.000 $2,500.000 $1,700.000 $1,210.000
TERMINAL SERVER (INSTALL ONLY)
EA 5.000 $1,760.000 $500.000 $1,050.000 $1,595.000
REMOVE EXISTING CABLES (POWER)
LF 100.000 $4.000 $2.000 $2.000 $1.100
REMOVE EXISTING CABLES (COMMUNICATION)
LF 100.000 $4.000 $2.000 $2.000 $2.750
TMA (STATIONARY)
DAY 100.000 $330.000 $500.000 $500.000 $385.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 20.000 $5,760.000 $6,000.000 $5,500.000 $5,637.500
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 1.000 $7,520.000 $9,000.000 $8,800.000 $8,085.000
REMOVE ITS GROUND BOX
EA 1.000 $1,340.000 $1,000.000 $1,200.000 $1,650.000
HIGH MAST ASSEMBLY FOR ITS
EA 2.000 $42,100.000 $50,000.000 $47,500.000 $49,500.000
ITS RVSD (DATA COLLECT & WWA) SYS
EA 5.000 $21,720.000 $19,000.000 $24,500.000 $23,100.000
ITS RVSD (DC & WWA) (RELOCATE)
EA 1.000 $5,845.000 $2,000.000 $8,600.000 $7,810.000
ITS RVSD (DC & WWA) (REMOVE)
EA 1.000 $2,560.000 $1,000.000 $2,800.000 $2,970.000
LCS SIGNAL UNIT (REMOVE)
EA 10.000 $2,500.000 $1,000.000 $1,800.000 $1,650.000
INSTALL OF HARD ETHERNET SWITCH
EA 15.000 $2,800.000 $8,000.000 $6,300.000 $3,080.000
CELLULAR ROUTER
EA 7.000 $2,800.000 $5,500.000 $4,200.000 $1,925.000
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
EA 1.000 $11,200.000 $3,000.000 $17,000.000 $17,325.000
FURNISH AND INSTALL RWIS
EA 2.000 $77,900.000 $70,000.000 $82,910.000 $117,700.000
ALL-IN-ONE ATMOSPHERIC SENSOR
EA 2.000 $6,400.000 $40,000.000 $6,688.000 $14,190.000
PRECIPITATION TYPE SENSOR
EA 1.000 $3,000.000 $35,000.000 $3,215.000 $11,880.000
AIR TEMP/RELATIVE HUMIDITY SENSOR
EA 1.000 $2,600.000 $35,000.000 $2,800.000 $11,577.500
ROAD SURFACE SENSOR
EA 1.000 $11,600.000 $30,000.000 $26,310.000 $21,505.000
SUBSURFACE SENSOR
EA 1.000 $1,700.000 $30,000.000 $2,425.000 $10,802.000
NON-INTRUSIVE PAVE CONDI & TEMP SENSOR
EA 2.000 $24,200.000 $30,000.000 $20,500.000 $29,865.000
RAIN SENSOR
EA 1.000 $4,800.000 $35,000.000 $5,000.000 $13,530.000
WINDSPEED/DIRECTION SENSOR
EA 1.000 $2,700.000 $45,000.000 $2,950.000 $11,715.000
BAROMETRIC PRESSURE SENSOR
EA 1.000 $3,800.000 $45,000.000 $3,925.000 $12,485.000
NON-INTRUSIVE WATER LEVEL FLOOD SENSOR
EA 1.000 $9,500.000 $45,000.000 $13,800.000 $19,767.000
Totals: $3,901,065.000 $4,204,056.000 $4,980,251.000 $5,169,052.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (NON-PARTICIPATING) $100,000.00
MATERIAL FURNISHED BY THE STATE $485,000.00
CONTRACTOR FORCE ACCOUNT EROSION CONTROL MAINTENANCE (NON-PARTICIPATING) $40,000.00
CONTRACTOR FORCE ACCOUNT SAFETY CONTINGENCY (NON-PARTICIPATING) $120,000.00
Total: $745,000.00