TARRANT VA (0902-00-216)

Items: 50

County: TARRANT
Length: N/A
Highway: VA
District: FORT WORTH
Control Number: 0902-00-216
DBE Goal: N/A
Project: STP 2019(722)
Guaranty: N/A
Time: 280 WORKING DAYS
Engineer's Estimate: $1,629,565.02
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,629,565.02
$1,766,886.32
Over/Under Est: 8.43% $137,321.30
$2,115,588.00
Over/Under Est: 29.83% $486,022.98
Amt Left: 19.74% $348,701.68

Bid Items & Bid Tabulations

50 Total 0 of 50
TARRANT  |  VA  |  FORT WORTH  |  0902-00-216  |  08/07/2019  |  $1,629,565.02  |  STP 2019(722)  |  CONSTRUCT RAMPS  |  280 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PROJECT ALLIED RESOURCES, LLC
FNH CONSTRUCTION, LLC
REMOVING CONC (MEDIANS)
SY 45.000 $10.000 $30.700 $100.000
REMOVING CONC (SIDEWALKS)
SY 42.000 $25.000 $16.500 $100.000
REMOVING CONC (DRIVEWAYS)
SY 1,242.000 $20.000 $17.000 $20.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,768.000 $8.000 $8.300 $18.000
BLOCK SODDING
SY 5,762.000 $5.000 $9.500 $6.000
VEGETATIVE WATERING
MG 171.000 $25.000 $47.900 $50.000
RIPRAP (CONC)(4 IN)
CY 60.000 $600.000 $728.000 $550.000
RAIL (HANDRAIL)(TY A)
LF 158.000 $122.000 $135.000 $185.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 3.000 $7,000.000 $17,700.000 $12,500.000
REMOVE STR (BOLLARD)
EA 1.000 $245.000 $200.000 $500.000
REMOVE STR (RAIL)
LF 24.000 $20.000 $48.900 $100.000
MOBILIZATION
LS 1.000 $148,079.910 $196,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $3,000.000 $5,640.000 $8,500.000
SANDBAGS FOR EROSION CONTROL
EA 2,000.000 $11.000 $7.200 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,000.000 $5.460 $7.700 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,000.000 $1.210 $1.620 $9.000
CONC CURB (DOWEL)
LF 1,738.000 $71.670 $15.800 $35.000
DRIVEWAYS (CONC)
SY 1,514.000 $100.000 $99.000 $100.000
CONC SIDEWALKS (4")
SY 6,093.000 $50.000 $66.000 $55.000
CONC SIDEWALKS (6")
SY 169.000 $70.000 $84.000 $80.000
CURB RAMPS (TY 1)
EA 100.000 $1,550.000 $2,030.000 $2,250.000
CURB RAMPS (TY 2)
EA 3.000 $2,217.000 $2,030.000 $2,500.000
CURB RAMPS (TY 3)
EA 20.000 $2,000.000 $2,090.000 $2,500.000
CURB RAMPS (TY 5)
EA 1.000 $2,544.000 $5,030.000 $2,500.000
CURB RAMPS (TY 6)
EA 18.000 $1,552.000 $2,550.000 $2,500.000
CURB RAMPS (TY 7)
EA 71.000 $1,982.000 $2,150.000 $2,500.000
CURB RAMPS (TY 10)
EA 2.000 $1,585.000 $2,090.000 $2,500.000
CURB RAMPS (TY 22)
EA 1.000 $2,840.000 $3,910.000 $2,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $250.000 $759.000 $950.000
CONDT (PVC) (SCH 80) (3")
LF 178.000 $16.000 $42.200 $13.000
ELEC CONDR (NO.6) BARE
LF 178.000 $2.000 $6.700 $4.000
GROUND BOX TY C (162911)
EA 6.000 $830.000 $3,180.000 $1,000.000
REMOVE GROUND BOX
EA 6.000 $226.000 $314.000 $100.000
RELOCATE SM RD SN SUP&AM TY S80
EA 37.000 $577.500 $520.000 $650.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 4,134.000 $3.000 $4.400 $8.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 987.000 $7.000 $6.600 $15.000
PAVEMENT SEALER 12"
LF 4,134.000 $2.000 $3.300 $5.000
PAVEMENT SEALER 24"
LF 987.000 $3.000 $4.400 $8.000
ELIM EXT PAV MRK & MRKS (4")
LF 76.000 $0.600 $5.500 $5.000
ELIM EXT PAV MRK & MRKS (12")
LF 649.000 $2.550 $4.400 $8.000
ELIM EXT PAV MRK & MRKS (24")
LF 230.000 $4.000 $5.500 $5.000
PAV SURF PREP FOR MRK (12")
LF 4,134.000 $0.300 $0.830 $8.000
PAV SURF PREP FOR MRK (24")
LF 987.000 $1.200 $1.100 $12.000
TRF SIG CBL (TY A)(16 AWG)(5 CONDR)
LF 950.000 $2.800 $6.000 $10.000
PED POLE ASSEMBLY
EA 8.000 $2,335.000 $4,410.000 $6,500.000
PED DETECT PUSH BUTTON (STANDARD)
EA 14.000 $328.000 $919.000 $1,850.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 14.000 $90.000 $183.000 $500.000
RETROFIT DET WARN SURF(CAST IN PLACE)
EA 1.000 $415.000 $1,500.000 $2,500.000
TMA (STATIONARY)
EA 10.000 $15,000.000 $1.000 $10,000.000
TMA (MOBILE OPERATION)
HR 400.000 $61.450 $11.000 $55.000
Totals: $1,629,565.020 $1,766,886.320 $2,115,588.000