TARRANT VA (0902-00-135)

Items: 72

County: TARRANT
Length: N/A
Highway: VA
District: FORT WORTH
Control Number: 0902-00-135
DBE Goal: N/A
Project: STP 2016(591)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $1,600,996.70
Date: 01/05/2017 (9 years ago)
Contract Number: N/A
Type: CONSTRUCT CURB RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,600,996.70
$1,617,402.20
Over/Under Est: 1.02% $16,405.50
Over/Under Est: 9.73% $155,828.30
Amt Left: 8.62% $139,422.80
$1,898,619.40
Over/Under Est: 18.59% $297,622.70
Amt Left: 17.39% $281,217.20
Delta: -8.07% -$141,794.40
$2,204,711.10
Over/Under Est: 37.71% $603,714.40
Amt Left: 36.31% $587,308.90
Delta: -16.12% -$306,091.70
$2,216,838.53
Over/Under Est: 38.47% $615,841.83
Amt Left: 37.06% $599,436.33
Delta: -0.55% -$12,127.43
Over/Under Est: 80.53% $1,289,249.49
Amt Left: 78.7% $1,272,843.99
Delta: -30.38% -$673,407.66

Bid Items & Bid Tabulations

72 Total 0 of 72
TARRANT  |  VA  |  FORT WORTH  |  0902-00-135  |  01/05/2017  |  $1,600,996.70  |  STP 2016(591)  |  CONSTRUCT CURB RAMPS  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
HIGHWAY 19 CONSTRUCTION LLC
TI-ZACK CONCRETE, INC.
FNH CONSTRUCTION, LLC
ALTUS CONSTRUCTION LLC
ED BELL CONSTRUCTION COMPANY
REMOVING CONC (RIPRAP)
SY 507.000 $15.000 $15.000 $25.000 $12.000 $20.000 $19.070 $42.000
REMOVING CONC (MEDIANS)
SY 20.000 $25.000 $15.000 $25.000 $12.000 $20.000 $23.880 $42.000
REMOVING CONC (FOUNDATIONS)
CY 1.000 $100.000 $100.000 $800.000 $1,000.000 $1,100.000 $1,317.600 $630.000
REMOVING CONC (DRIVEWAYS)
SY 2,319.000 $20.000 $15.000 $20.000 $15.000 $20.000 $17.730 $42.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,688.000 $10.000 $5.000 $5.000 $8.000 $20.000 $11.020 $21.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 320.000 $15.000 $15.000 $25.000 $12.000 $20.000 $20.800 $42.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 545.000 $12.000 $15.000 $15.000 $12.000 $20.000 $10.420 $31.500
COMPOST MANUF TOPSOIL (4")
SY 655.000 $2.500 $2.000 $5.000 $3.000 $5.500 $1.750 $10.500
BLOCK SODDING
SY 7,379.000 $6.000 $5.000 $6.000 $4.000 $5.000 $6.250 $10.500
VEGETATIVE WATERING
MG 115.110 $30.000 $20.000 $100.000 $110.000 $60.000 $52.700 $63.000
D-GR HMA(SQ) TY-D PG70-22
TON 28.500 $200.000 $500.000 $250.000 $300.000 $200.000 $194.400 $420.000
CL C CONC (MISC)
CY 1.800 $600.000 $1,000.000 $1,000.000 $1,000.000 $1,100.000 $671.560 $5,250.000
RETAINING WALL (CAST - IN - PLACE)
SF 702.000 $100.000 $50.000 $45.000 $50.000 $45.000 $77.760 $105.000
RIPRAP (CONC)(6 IN)
CY 96.700 $450.000 $800.000 $500.000 $750.000 $650.000 $770.800 $630.000
RAIL (HANDRAIL)(TY B)
LF 15.000 $150.000 $200.000 $180.000 $150.000 $185.000 $171.020 $136.500
GRATE & FRAME
EA 6.000 $1,200.000 $1,500.000 $1,000.000 $500.000 $5,000.000 $3,588.260 $3,150.000
ADJUSTING MANHOLES
EA 8.000 $600.000 $500.000 $500.000 $300.000 $1,500.000 $1,719.610 $1,680.000
REMOVE STR (BOLLARD)
EA 2.000 $300.000 $200.000 $1,000.000 $300.000 $500.000 $437.440 $257.500
REMOV STR (DRAINAGE FLUME)
EA 1.000 $300.000 $1,000.000 $500.000 $300.000 $1,500.000 $6,588.000 $2,100.000
MOBILIZATION
LS 1.000 $105,000.000 $250,000.000 $160,000.000 $400,000.000 $210,000.000 $217,404.000 $272,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $2,200.000 $5,000.000 $5,000.000 $2,000.000 $8,500.000 $9,882.000 $31,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,000.000 $5.000 $10.000 $5.000 $0.100 $15.000 $9.440 $10.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.000 $1.000 $1.000 $0.100 $8.000 $1.680 $2.100
REMOVE AND RELAY PAVERS
SY 6.000 $70.000 $200.000 $150.000 $150.000 $2,000.000 $103.120 $94.500
CONC CURB (TY I)
LF 111.000 $20.000 $10.000 $20.000 $30.000 $30.000 $10.250 $11.550
CONC CURB (TY II)
LF 1,445.000 $25.000 $15.000 $20.000 $30.000 $35.000 $33.620 $13.650
CONC CURB & GUTTER (TY II)
LF 1,994.000 $35.000 $30.000 $25.000 $35.000 $42.000 $35.650 $31.500
DRIVEWAYS (CONC)
SY 2,678.000 $75.000 $70.000 $65.000 $75.000 $85.000 $89.770 $73.500
DRIVEWAYS (ACP)
SY 280.000 $65.000 $50.000 $60.000 $50.000 $42.000 $54.130 $210.000
CONC SIDEWALKS (4")
SY 6,016.000 $55.000 $45.000 $55.000 $70.000 $62.000 $67.490 $63.000
CURB RAMPS (TY 1)
EA 43.000 $1,400.000 $1,500.000 $1,100.000 $1,400.000 $1,850.000 $1,895.700 $2,550.000
CURB RAMPS (TY 3)
EA 33.000 $1,600.000 $1,500.000 $1,800.000 $1,400.000 $1,850.000 $1,525.420 $2,450.000
CURB RAMPS (TY 6)
EA 19.000 $1,500.000 $1,500.000 $1,800.000 $1,400.000 $1,850.000 $2,293.360 $2,700.000
CURB RAMPS (TY 7)
EA 99.000 $1,400.000 $1,500.000 $1,100.000 $1,400.000 $1,850.000 $1,700.200 $2,050.000
CURB RAMPS (TY 10)
EA 9.000 $1,300.000 $1,500.000 $1,100.000 $1,400.000 $1,850.000 $2,182.060 $2,350.000
CURB RAMPS (TY 20)
EA 1.000 $2,000.000 $1,500.000 $2,500.000 $2,500.000 $1,850.000 $3,060.820 $1,650.000
CURB RAMPS (TY 21)
EA 7.000 $2,200.000 $1,500.000 $2,000.000 $2,500.000 $1,850.000 $2,416.390 $3,100.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 238.000 $100.000 $100.000 $100.000 $100.000 $65.000 $72.200 $420.000
CONDT (PVC) (SCH 80) (3")
LF 210.000 $10.000 $15.000 $30.000 $12.000 $15.000 $23.920 $35.580
GROUND BOX TY D (162922)
EA 70.000 $600.000 $200.000 $1,100.000 $450.000 $650.000 $911.610 $1,500.990
REMOVE GROUND BOX
EA 57.000 $200.000 $100.000 $500.000 $50.000 $150.000 $212.600 $459.130
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $1,200.000 $500.000 $1,000.000 $150.000 $650.000 $998.300 $993.290
RELOCATE SM RD SN SUP&AM TY S80
EA 55.000 $300.000 $200.000 $700.000 $350.000 $500.000 $410.120 $548.480
REMOVE SM RD SN SUP&AM
EA 6.000 $100.000 $100.000 $500.000 $150.000 $50.000 $116.230 $167.560
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 1.000 $200.000 $1,000.000 $100.000 $150.000 $100.000 $128.120 $92.300
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 2.000 $200.000 $1,000.000 $100.000 $150.000 $100.000 $143.290 $107.360
REMOVE DELIN & OBJECT MARKER ASSMS
EA 3.000 $25.000 $10.000 $700.000 $150.000 $100.000 $50.830 $32.910
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 45.000 $3.000 $5.000 $2.000 $2.000 $5.000 $1.550 $3.530
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,536.000 $5.000 $10.000 $4.000 $3.300 $5.000 $3.510 $5.830
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,059.000 $7.000 $15.000 $6.000 $5.500 $12.000 $7.270 $9.710
PAVEMENT SEALER 4"
LF 107.000 $0.750 $2.000 $1.000 $1.000 $1.000 $0.630 $1.770
PAVEMENT SEALER 8"
LF 45.000 $0.850 $2.000 $2.000 $2.000 $1.000 $1.100 $3.530
PAVEMENT SEALER 12"
LF 3,536.000 $1.000 $1.000 $3.000 $2.250 $1.000 $3.290 $3.970
PAVEMENT SEALER 24"
LF 1,059.000 $1.250 $1.000 $3.000 $3.000 $1.000 $5.090 $5.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 27.000 $2.000 $10.000 $2.000 $2.000 $2.000 $0.360 $3.530
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 80.000 $2.000 $10.000 $2.000 $2.000 $2.000 $0.380 $3.530
ELIM EXT PAV MRK & MRKS (4")
LF 232.000 $1.250 $1.000 $1.000 $1.000 $2.000 $0.790 $1.770
ELIM EXT PAV MRK & MRKS (8")
LF 210.000 $1.500 $1.000 $1.000 $1.000 $2.000 $1.900 $1.770
ELIM EXT PAV MRK & MRKS (12")
LF 3,997.000 $2.500 $1.000 $1.000 $1.000 $2.000 $3.130 $1.770
ELIM EXT PAV MRK & MRKS (24")
LF 1,090.000 $3.000 $1.000 $1.000 $1.500 $12.000 $5.820 $2.650
PAV SURF PREP FOR MRK (4")
LF 107.000 $0.250 $1.000 $1.000 $1.000 $1.000 $0.820 $1.770
PAV SURF PREP FOR MRK (8")
LF 45.000 $0.300 $1.000 $1.000 $1.000 $1.000 $4.940 $1.770
PAV SURF PREP FOR MRK (12")
LF 3,536.000 $0.400 $1.000 $1.000 $1.000 $5.000 $3.370 $1.770
PAV SURF PREP FOR MRK (24")
LF 1,059.000 $0.500 $1.000 $1.000 $1.000 $12.000 $3.760 $1.770
INSTALL OF VEHICLE DETECTORS
LF 10,000.000 $2.000 $0.500 $12.000 $0.100 $1.000 $13.180 $16.780
REMOVAL OF SIGNAL HEAD ASSM
EA 4.000 $200.000 $500.000 $500.000 $550.000 $500.000 $201.700 $697.520
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 84.000 $75.000 $100.000 $100.000 $50.000 $500.000 $101.180 $176.590
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 77.000 $400.000 $200.000 $300.000 $400.000 $1,500.000 $527.040 $512.100
REMOVE PED POLE ASSM
EA 1.000 $200.000 $1,000.000 $1,800.000 $1,500.000 $500.000 $733.300 $874.110
TREE REMOVAL (4" - 12" DIA)
EA 20.000 $200.000 $500.000 $1,000.000 $450.000 $1,000.000 $133.480 $1,575.000
RETROFIT DET WARN SURF(SURF APP OR CIP)
EA 3.000 $350.000 $500.000 $350.000 $450.000 $5,000.000 $1,035.260 $315.000
CURB INLET SEDIMENT PROTECTION
LF 2,000.000 $4.000 $5.000 $5.000 $0.100 $5.000 $8.830 $15.750
Totals: $1,600,996.700 $1,617,402.200 $1,756,825.000 $1,898,619.400 $2,204,711.100 $2,216,838.545 $2,890,246.190