Show Job Controls
Bid Cobra

TARRANT FM 156 (0718-02-076)

Items: 144

County: TARRANT
Length: N/A
Highway: FM 156
District: FORT WORTH
Control Number: 0718-02-076
DBE Goal: N/A
Project: F 2023(865)
Guaranty: N/A
Time: 152 WORKING DAYS
Engineer's Estimate: $3,836,527.99
Date: 02/07/2025 (1 year ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
Contract Type: Federal
Project Description: CONSTRUCT INTERSECTION IMPROVEMENTS, INCLUDING LEFT AND RIGHT TURN LANES, AND SIDEWALKS.
Mail/Deliver Bids To: N/A
MARIBEL RANGEL
ALFREDO LUERA
CYNTHIA DELAGARZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$3,836,527.99
$4,999,312.00
Over/Under Est: 30.31% $1,162,784.01
Over/Under Est: 72.75% $2,790,998.06
Amt Left: 32.57% $1,628,214.05
Over/Under Est: 76.44% $2,932,472.01
Amt Left: 35.4% $1,769,688.00
Delta: -2.13% -$141,473.95
Over/Under Est: 80.67% $3,094,976.01
Amt Left: 38.65% $1,932,192.00
Delta: -2.40% -$162,504.00
$7,193,670.02
Over/Under Est: 87.5% $3,357,142.03
Amt Left: 43.89% $2,194,358.02
Delta: -3.78% -$262,166.02

Bid Items & Bid Tabulations

144 Total 0 of 144
TARRANT  |  FM 156  |  FORT WORTH  |  0718-02-076  |  02/07/2025  |  $3,836,527.99  |  F 2023(865)  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT...  |  152 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LAKEY, INC.
RAGLE CONSTRUCTION, INC.
ED BELL CONSTRUCTION COMPANY
GREY SKY CONSTRUCTION LLC
JAGOE-PUBLIC COMPANY
PREPARING ROW
STA 2.000 $24,000.000 $6,166.650 $334,000.000 $50,000.000 $250,000.000 $5,000.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 26.000 $700.000 $1,000.000 $250.000 $262.500 $5,000.000 $340.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 2.000 $800.000 $1,000.000 $1,700.000 $2,100.000 $10,000.000 $2,300.000
REMOV CONC (PAV)
SY 2,580.000 $52.000 $12.850 $21.000 $31.500 $20.000 $30.000
REMOV CONC (PAVERS)
SY 12.000 $100.000 $12.200 $96.000 $73.500 $20.000 $70.000
REMOV CONC (DRIVEWAYS)
SY 1,340.000 $22.000 $24.500 $16.000 $31.500 $20.000 $30.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 81.000 $64.000 $50.000 $27.000 $84.000 $20.000 $30.000
REMOV CONC (CURB)
LF 2,428.000 $29.500 $14.500 $2.300 $8.400 $20.000 $30.000
REMOV CONC (SAWCUT)
LF 1,039.000 $25.000 $22.000 $3.200 $11.550 $20.000 $4.500
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 4,805.000 $18.500 $20.000 $8.300 $7.350 $20.000 $8.000
EXCAV (ROADWAY)
CY 6,329.000 $58.750 $30.000 $50.000 $42.000 $20.000 $50.000
EMBANK (FNL)(OC)(TY C)
CY 215.000 $44.500 $51.500 $410.000 $73.500 $50.000 $30.000
BLOCK SODDING
SY 7,538.000 $22.000 $5.820 $8.900 $5.250 $10.000 $9.000
DRILL SEED (TEMP_WARM)
SY 3,769.000 $0.150 $0.440 $0.370 $0.400 $1.000 $0.400
DRILL SEED (TEMP_COOL)
SY 3,769.000 $0.150 $0.450 $0.380 $0.410 $1.000 $0.400
VEGETATIVE WATERING
TGL 264.000 $50.000 $34.500 $55.000 $73.500 $50.000 $90.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 194.000 $425.000 $360.900 $307.000 $500.000 $450.000 $325.000
LIME TRT (EXIST MATL)(8")
SY 11,593.000 $6.800 $17.375 $7.800 $15.000 $15.000 $13.000
PRIME COAT (MC-30)
GAL 2,319.000 $8.290 $8.000 $11.000 $3.300 $10.000 $1.000
D-GR HMA TY-B PG64-22
TON 3,999.000 $133.470 $115.550 $125.000 $161.000 $200.000 $140.000
TACK COAT
GAL 2,087.000 $21.420 $5.030 $16.000 $0.500 $10.000 $0.500
CONC PVMT (CRCP) (8")
SY 10,954.000 $147.000 $70.300 $84.500 $120.000 $150.000 $130.000
CONC PVMT (CRCP)(HES) (8")
SY 174.000 $85.000 $85.000 $100.000 $200.000 $200.000 $420.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.000 $730.000 $575.000 $500.000 $1,000.000 $450.000 $1,400.000
RC PIPE (CL III)(30 IN)
LF 55.000 $140.500 $138.800 $146.000 $325.000 $250.000 $220.000
RC PIPE (CL III)(36 IN)
LF 48.000 $222.000 $206.175 $191.000 $450.000 $300.000 $470.000
JCTBOX(COMPL)(PJB)(5FTX6FT)
EA 1.000 $14,700.000 $8,000.000 $8,400.000 $21,000.000 $15,000.000 $1,400.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 3.000 $7,625.000 $8,019.970 $5,900.000 $21,000.000 $15,000.000 $9,900.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $3,775.000 $3,946.350 $2,500.000 $3,000.000 $4,000.000 $6,500.000
REMOV STR (HEADWALL)
EA 1.000 $1,835.000 $2,139.705 $1,500.000 $5,152.910 $2,500.000 $2,000.000
MOBILIZATION
LS 1.000 $534,857.000 $135,000.000 $670,000.000 $700,000.000 $680,000.000 $798,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $9,500.000 $30,000.000 $34,000.000 $52,500.000 $12,500.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,000.000 $9,150.000 $20,000.000 $8,400.000 $16,500.000 $10,000.000
TMA (STATIONARY)
DAY 278.000 $250.000 $300.000 $275.000 $210.000 $250.000 $100.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $42.500 $42.000 $51.000 $54.830 $30.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $17.000 $18.500 $25.000 $26.880 $15.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 116.000 $33.000 $42.000 $35.000 $37.630 $40.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 116.000 $13.100 $14.500 $12.000 $12.900 $20.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 985.000 $4.000 $4.570 $3.500 $3.760 $4.000 $4.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 985.000 $1.250 $1.500 $1.200 $1.290 $2.000 $1.750
CONSTRUCTING DETOURS
SY 1,408.000 $130.000 $129.700 $300.000 $213.550 $45.000 $140.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 140.000 $70.000 $95.000 $60.000 $102.330 $100.000 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 140.000 $25.000 $30.000 $20.000 $56.460 $20.000 $30.000
CONC CURB (MONO) (TY II)
LF 5,127.000 $16.000 $20.000 $6.000 $11.340 $15.000 $4.000
DRIVEWAYS (CONC)
SY 1,188.000 $128.000 $120.000 $92.000 $173.550 $125.000 $180.000
CONC SIDEWALKS (4")
SY 202.000 $140.000 $88.000 $75.000 $101.200 $65.000 $130.000
CONC SIDEWALKS (6")
SY 560.000 $158.000 $90.000 $70.000 $142.600 $85.000 $140.000
CURB RAMPS (TY 1)
EA 3.000 $3,550.000 $3,051.000 $2,100.000 $3,284.000 $3,250.000 $5,200.000
CURB RAMPS (TY 5)
EA 1.000 $4,150.000 $3,500.000 $8,100.000 $6,688.000 $3,250.000 $5,800.000
CURB RAMPS (TY 21)
EA 2.000 $4,250.000 $4,050.000 $2,400.000 $3,069.000 $3,250.000 $6,300.000
CURB RAMPS (TY 22)
EA 3.000 $5,325.000 $3,500.000 $3,200.000 $5,838.000 $3,250.000 $6,200.000
CONDT (PVC) (SCH 40) (2")
LF 25.000 $25.900 $18.000 $25.000 $38.000 $25.000 $50.000
CONDT (PVC) (SCH 40) (3")
LF 102.000 $27.000 $21.000 $25.000 $40.000 $30.000 $60.000
CONDT (PVC) (SCH 40) (4")
LF 12.000 $33.250 $39.000 $30.000 $43.000 $40.000 $60.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 571.000 $60.000 $60.000 $50.000 $90.000 $60.000 $130.000
ELEC CONDR (NO.6) BARE
LF 701.000 $3.250 $4.500 $3.000 $5.500 $3.000 $8.000
ELEC CONDR (NO.6) INSULATED
LF 32.000 $3.500 $4.750 $3.000 $5.500 $3.000 $8.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 821.000 $3.000 $3.850 $8.000 $5.500 $3.000 $8.000
GROUND BOX TY D (162922)
EA 3.000 $1,690.000 $2,000.000 $2,000.000 $2,550.000 $1,250.000 $3,700.000
GROUND BOX TY D (162922)W/APRON
EA 4.000 $2,500.000 $2,200.000 $3,500.000 $3,416.000 $1,500.000 $4,900.000
REMOVE GROUND BOX
EA 5.000 $520.000 $392.930 $250.000 $825.000 $500.000 $2,000.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $11,000.000 $11,250.000 $25,000.000 $13,200.000 $10,500.000 $19,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $800.000 $860.000 $625.000 $688.000 $1,500.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 15.000 $900.000 $900.000 $730.000 $743.000 $1,500.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 2.000 $1,400.000 $1,135.000 $1,269.000 $1,293.000 $1,500.000 $1,700.000
REMOVE SM RD SN SUP&AM
EA 21.000 $157.000 $153.000 $79.000 $165.000 $500.000 $110.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,210.000 $1.950 $1.170 $1.650 $1.820 $0.500 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,450.000 $1.350 $1.520 $1.500 $1.650 $0.500 $1.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 188.000 $6.600 $19.180 $10.000 $11.000 $20.000 $8.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 20.000 $220.000 $327.000 $200.000 $220.000 $250.000 $400.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 18.000 $146.000 $474.000 $350.000 $385.000 $500.000 $600.000
WK ZN PAV MRK REMOV (W)(TPL ARROW)
EA 2.000 $130.000 $330.000 $550.000 $605.000 $500.000 $600.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 130.000 $3.500 $4.620 $2.250 $2.480 $3.000 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 648.000 $2.000 $2.580 $1.750 $1.930 $3.000 $1.250
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,653.000 $5.000 $5.050 $3.000 $3.300 $6.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 234.000 $11.500 $13.460 $7.000 $7.700 $20.000 $10.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 5.000 $190.000 $273.600 $215.000 $236.500 $250.000 $190.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000 $215.000 $310.000 $250.000 $275.000 $250.000 $220.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 96.000 $4.000 $6.690 $4.000 $4.400 $6.000 $5.000
PAVEMENT SLER 6"
LF 10,964.000 $0.500 $0.880 $0.250 $0.280 $0.750 $0.250
PAVEMENT SLER 8"
LF 778.000 $10.000 $1.410 $0.350 $0.390 $2.000 $0.400
PAVEMENT SLER 12"
LF 1,749.000 $0.500 $1.430 $0.500 $0.550 $5.000 $1.000
PAVEMENT SLER 24"
LF 234.000 $55.000 $4.890 $1.000 $1.100 $20.000 $2.000
PAVEMENT SLER (ARROW)
EA 5.000 $45.000 $65.000 $25.000 $27.500 $250.000 $40.000
PAVEMENT SLER (WORD)
EA 6.000 $45.000 $65.000 $25.000 $27.500 $250.000 $40.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,768.000 $1.750 $1.530 $1.500 $1.650 $0.750 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 5,889.000 $2.500 $1.710 $1.200 $1.320 $0.750 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 3,307.000 $3.500 $1.650 $1.200 $1.320 $0.750 $1.000
REFL PAV MRKR TY II-C-R
EA 111.000 $7.000 $8.920 $5.000 $5.500 $6.000 $7.000
PAV SURF PREP FOR MRK (6")
LF 10,964.000 $0.700 $0.520 $0.100 $0.110 $0.750 $0.030
PAV SURF PREP FOR MRK (8")
LF 778.000 $0.750 $0.690 $0.150 $0.170 $2.000 $0.100
PAV SURF PREP FOR MRK (12")
LF 1,749.000 $1.750 $0.690 $0.200 $0.220 $6.000 $0.400
PAV SURF PREP FOR MRK (24")
LF 234.000 $1.750 $1.980 $0.400 $0.440 $20.000 $0.700
PAV SURF PREP FOR MRK (ARROW)
EA 5.000 $40.000 $36.900 $5.000 $5.500 $250.000 $16.000
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $40.000 $37.100 $5.000 $5.500 $250.000 $19.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $55,000.000 $62,112.000 $65,000.000 $61,600.000 $65,000.000 $70,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $14,000.000 $10,128.000 $150,000.000 $4,200.000 $10,000.000 $5,000.000
TEMP TRAF SIGNALS
EA 1.000 $82,000.000 $109,500.000 $200,000.000 $115,500.000 $42,000.000 $125,000.000
VEH SIG SEC (12")LED(GRN)
EA 10.000 $575.000 $543.000 $400.000 $897.000 $325.000 $1,300.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $605.000 $551.000 $400.000 $897.000 $325.000 $1,300.000
VEH SIG SEC (12")LED(YEL)
EA 10.000 $595.000 $543.000 $400.000 $897.000 $325.000 $1,300.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $590.000 $551.000 $400.000 $897.000 $325.000 $1,300.000
VEH SIG SEC (12")LED(RED)
EA 10.000 $1,000.000 $543.000 $400.000 $897.000 $325.000 $1,300.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $590.000 $551.000 $400.000 $897.000 $325.000 $1,300.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $1,500.000 $1,025.000 $1,000.000 $1,568.000 $2,500.000 $2,300.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 10.000 $255.000 $207.000 $200.000 $154.000 $150.000 $220.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $310.000 $258.000 $200.000 $171.000 $160.000 $240.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 1,256.000 $4.650 $5.770 $3.500 $5.500 $3.000 $8.000
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 741.000 $7.900 $6.900 $5.000 $9.900 $3.000 $15.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,538.000 $3.000 $4.400 $3.500 $4.400 $3.000 $7.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 4.000 $15,500.000 $25,656.000 $25,000.000 $42,000.000 $25,000.000 $45,000.000
PED POLE ASSEMBLY
EA 3.000 $4,750.000 $4,656.000 $2,000.000 $9,000.000 $4,500.000 $11,000.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,500.000 $1,092.560 $1,500.000 $2,585.000 $1,850.000 $3,500.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $5,000.000 $10,200.000 $6,000.000 $10,670.000 $6,500.000 $14,000.000
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 1.000 $8,700.000 $13,074.000 $15,000.000 $11,275.000 $8,500.000 $14,000.000
RVDS (PRESENCE DET)(INSTALL ONLY)
EA 4.000 $2,000.000 $3,192.000 $1,500.000 $2,500.000 $5,000.000 $3,000.000
RVDS (ADVANCE DET)(INSTALL ONLY)
EA 2.000 $2,000.000 $3,780.000 $1,500.000 $2,500.000 $5,000.000 $3,000.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $9,725.000 $13,076.000 $15,000.000 $9,700.000 $8,500.000 $12,000.000
CCTV MOUNT (POLE)
EA 1.000 $865.000 $1,800.000 $1,000.000 $1,325.000 $6,500.000 $1,500.000
24" CONC. AWWA C303 WTRPIPE,CSS BKFILL
LF 176.000 $700.000 $1,150.000 $982.000 $900.000 $400.000 $1,200.000
24" CONCRETE AWWA C303 WATER PIPE
LF 136.000 $650.000 $1,000.000 $568.000 $600.000 $400.000 $700.000
42" CASING BY OTHER THAN OPEN CUT*
LF 136.000 $2,000.000 $900.000 $1,305.000 $2,000.000 $3,000.000 $1,800.000
6" WATER PIPE, CSS BACKFILL
LF 20.000 $90.000 $104.000 $191.000 $250.000 $250.000 $260.000
24" GATE VALVE W/ VAULT*
EA 1.000 $50,000.000 $84,000.000 $95,000.000 $100,000.000 $35,000.000 $123,600.000
6" GATE VALVE*
EA 1.000 $3,500.000 $2,600.000 $2,900.000 $3,000.000 $3,250.000 $3,900.000
WATER LINE GROUTING
CY 13.400 $300.000 $325.000 $1,180.000 $1,000.000 $850.000 $1,600.000
24" WATER ABANDONMENT PLUG
EA 2.000 $3,500.000 $12,000.000 $9,100.000 $7,000.000 $6,500.000 $12,400.000
24" PRESSURE PLUG
EA 2.000 $5,000.000 $22,000.000 $9,000.000 $12,000.000 $6,500.000 $12,200.000
SALVAGE FIRE HYDRANT
EA 1.000 $1,500.000 $1,500.000 $700.000 $1,000.000 $2,500.000 $1,000.000
REMOVE CONCRETE WATER VAULT (EX 24”BFV)
EA 1.000 $10,000.000 $1,500.000 $15,000.000 $1,800.000 $20,000.000 $20,400.000
CONCRETE WATER VAULT (EX 24” BFV)
EA 1.000 $50,000.000 $135,000.000 $108,500.000 $30,000.000 $100,000.000 $143,900.000
FIRE HYDRANT*
EA 1.000 $8,500.000 $7,400.000 $8,800.000 $6,000.000 $7,500.000 $13,200.000
CONNECTION TO EXISTING 24" WATER MAIN
EA 2.000 $30,000.000 $50,000.000 $118,000.000 $100,000.000 $5,000.000 $154,800.000
DUCTILE IRON WATER FITTINGS W/RESTRAINT
TON 1.000 $8,500.000 $3,000.000 $2,100.000 $7,000.000 $11,500.000 $2,900.000
MANHOLE ADJUSTMENT, MAJOR W/ COVER*
EA 1.000 $4,000.000 $1,700.000 $8,600.000 $2,500.000 $8,500.000 $11,700.000
VALVE BOX ADJUSTMENT
EA 3.000 $1,500.000 $1,000.000 $1,700.000 $1,000.000 $1,500.000 $2,300.000
EXPLORATORY EXCAV. OF EXISTING UTILITY
EA 2.000 $2,000.000 $5,000.000 $6,700.000 $3,000.000 $5,000.000 $7,500.000
UTILITY MARKERS
EA 3.000 $500.000 $100.000 $100.000 $350.000 $1,500.000 $140.000
TRENCH SAFETY
LF 196.000 $10.000 $0.250 $2.000 $4.000 $20.000 $1.000
SEEDING, HYDROMULCH
SY 300.000 $10.000 $10.000 $3.750 $5.000 $5.000 $3.000
SWPPP = 1 ACRE
EA 1.000 $5,000.000 $4,500.000 $4,000.000 $5,500.000 $35,000.000 $500.000
CONSTRUCTION STAKING
EA 1.000 $10,000.000 $125,000.000 $2,500.000 $10,000.000 $100,000.000 $5,000.000
AS-BUILT SURVEY
EA 1.000 $5,000.000 $125,000.000 $2,500.000 $5,500.000 $35,000.000 $4,500.000
2” TEMPORARY WATER SERVICES (MISC ONLY)
LF 400.000 $15.000 $50.000 $120.000 $60.000 $60.000 $150.000
Totals: $6,093,239.680 $4,999,311.990 $6,627,526.050 $6,769,000.000 $6,931,504.000 $7,193,670.020