TARRANT FM 156 (0718-02-072)

Items: 75

County: TARRANT
Length: N/A
Highway: FM 156
District: FORT WORTH
Control Number: 0718-02-072
DBE Goal: N/A
Project: F 2023(819)
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $5,908,901.15
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,908,901.15
$5,497,888.16
Over/Under Est: -6.96% -$411,012.99
Over/Under Est: -5.93% -$350,511.98
Amt Left: 1.1% $60,501.01
Over/Under Est: -4.82% -$284,691.79
Amt Left: 2.3% $126,321.20
Delta: -1.18% -$65,820.19
Over/Under Est: 11.08% $654,721.84
Amt Left: 19.38% $1,065,734.83
Delta: -16.70% -$939,413.63
Subcontractor Percentage Amount
BARRICADES UNLIMITED 19.13% $1,060,593.99
DUSTROL, INC. 6.67% $369,794.14
JR WEST TEXAS CONCRETE LLC 6.38% $353,716.14
IBCTX, LLC 5.48% $303,818.87
LINEAR TRAFFIC MARKINGS LLC 4.62% $256,139.27
FORTSON CONTRACTING, INC. 3.12% $172,977.17
SYNERGY SIGNS & SERVICES LLC 1.52% $84,270.93
SURFACE PREPARATION TECHNOLOGIES, LLC 0.20% $11,088.28
HDZ CONSTRUCTION 0.14% $7,761.80
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.11% $6,098.55
Total: 47.37% $2,626,259.14

Bid Items & Bid Tabulations

75 Total 0 of 75
TARRANT  |  FM 156  |  FORT WORTH  |  0718-02-072  |  05/05/2023  |  $5,908,901.15  |  F 2023(819)  |  RESURF ROADWAY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
PEACHTREE CONSTRUCTION, LTD.
AUSTIN BRIDGE & ROAD SERVICES, LP
EUROVIA ATLANTIC COAST LLC
PREPARING ROW
STA 280.000 $250.000 $245.000 $275.000 $500.000 $450.000
REMOVING CONC (RIPRAP)
SY 129.000 $50.000 $30.000 $33.000 $75.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,108.000 $40.000 $90.000 $73.700 $100.000 $90.000
BACKFILL (TY A OR B)
STA 280.000 $280.000 $180.000 $375.000 $91.090 $425.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,276.000 $2.000 $0.500 $0.570 $0.500 $0.500
VEGETATIVE WATERING
MG 80.000 $80.000 $140.000 $75.000 $152.000 $165.000
SALV, HAUL & STKPL RCL APH PV (0 TO 2")
SY 128,132.000 $2.000 $2.190 $2.810 $2.250 $3.850
FLEX PAVE STRUCTURE REPAIR (8"-10")
SY 8,726.000 $100.000 $87.000 $85.200 $80.850 $84.250
RIPRAP (MOW STRIP)(4 IN)
CY 293.000 $710.000 $625.000 $625.000 $1,066.850 $720.000
CLEANING AND SEALING EXISTING JOINTS
LF 264.000 $55.000 $140.000 $148.000 $148.000 $250.050
RC PIPE (CL III)(18 IN)
LF 16.000 $110.000 $155.000 $167.000 $100.000 $155.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $1,250.000 $2,650.000 $2,950.000 $1,500.000 $2,650.000
REMOV STR (HEADWALL)
EA 2.000 $1,975.000 $1,000.000 $1,050.000 $2,500.000 $1,000.000
MOBILIZATION
LS 1.000 $537,173.000 $550,000.000 $500,000.000 $542,000.000 $580,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $12,400.000 $17,500.000 $11,920.000 $50,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 467.000 $33.500 $28.000 $30.000 $28.000 $28.000
CONSTRUCTION EXITS (REMOVE)
SY 467.000 $12.000 $11.000 $12.000 $11.000 $11.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 900.000 $7.500 $4.500 $5.000 $4.500 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 900.000 $3.350 $1.000 $1.000 $1.000 $1.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 80.000 $275.000 $120.000 $75.000 $275.000 $225.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 80.000 $135.000 $350.000 $240.000 $275.000 $155.000
RUMBLE STRIPS (SHOULDER)
LF 42,111.000 $0.750 $0.150 $0.400 $0.060 $0.370
MTL W-BEAM GD FEN (TIM POST)
LF 5,152.000 $35.000 $19.750 $22.500 $20.260 $29.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,300.000 $1,800.000 $1,950.000 $3,215.250 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 5,385.000 $5.500 $2.500 $2.650 $2.560 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,400.000 $2,775.000 $2,850.000 $2,846.150 $2,765.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $365.000 $250.000 $275.000 $256.410 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 84.000 $800.000 $590.000 $940.000 $590.000 $590.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 19.000 $925.000 $770.000 $1,125.000 $770.000 $770.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,275.000 $1,040.000 $1,610.000 $1,040.000 $1,040.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 2.000 $500.000 $225.000 $320.000 $225.000 $225.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 9.000 $725.000 $600.000 $975.000 $600.000 $600.000
REMOVE SM RD SN SUP&AM
EA 103.000 $145.000 $85.000 $162.000 $85.000 $85.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 33.000 $37.500 $18.000 $33.600 $18.000 $18.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $90.000 $50.000 $202.000 $50.000 $50.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 96.000 $33.500 $25.000 $34.200 $25.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 61.000 $31.000 $27.000 $46.000 $27.000 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 449.000 $0.550 $0.650 $0.700 $0.650 $0.650
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 53,495.000 $0.350 $0.300 $0.320 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,593.000 $0.750 $0.770 $0.850 $0.770 $0.770
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 784.000 $1.750 $3.000 $3.200 $3.000 $3.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 495.000 $7.500 $4.500 $4.800 $4.500 $4.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 40.000 $82.000 $90.000 $97.500 $90.000 $90.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 7.000 $90.000 $170.000 $185.000 $170.000 $170.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 40.000 $75.000 $115.000 $131.500 $115.000 $115.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 61,078.000 $0.500 $0.300 $0.320 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 1,567.000 $3.500 $4.500 $4.900 $4.500 $4.500
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 40.000 $2.000 $4.500 $4.900 $4.500 $4.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,593.000 $1.500 $1.060 $1.150 $1.060 $1.060
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 993.000 $10.000 $6.130 $6.900 $6.130 $6.130
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 1,567.000 $7.500 $6.130 $6.900 $6.130 $6.130
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 449.000 $0.750 $1.150 $1.250 $1.150 $1.150
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 50,741.000 $1.000 $0.590 $0.650 $0.590 $0.590
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 61,078.000 $0.750 $0.590 $0.650 $0.590 $0.590
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 3,536.000 $1.250 $2.250 $2.450 $2.250 $2.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 40.000 $250.000 $213.000 $240.000 $213.000 $213.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 7.000 $360.000 $365.000 $405.000 $365.000 $365.000
PREFAB PAV MRK TY C (W) (WORD)
EA 40.000 $300.000 $271.000 $290.000 $271.000 $271.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 16.000 $43.000 $63.000 $69.000 $63.000 $63.000
REFL PAV MRKR TY I-C
EA 247.000 $6.250 $5.500 $6.000 $5.500 $5.500
REFL PAV MRKR TY II-A-A
EA 2,027.000 $6.750 $5.000 $5.500 $5.000 $5.000
REFL PAV MRKR TY II-C-R
EA 30.000 $6.000 $10.000 $11.000 $10.000 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 114,573.000 $0.850 $0.300 $0.300 $0.300 $0.300
ELIM EXT PAV MRK & MRKS (8")
LF 4,633.000 $1.250 $0.900 $0.900 $0.900 $0.900
ELIM EXT PAV MRK & MRKS (12")
LF 784.000 $2.200 $1.370 $1.380 $1.370 $1.370
ELIM EXT PAV MRK & MRKS (24")
LF 1,702.000 $4.500 $3.770 $3.800 $3.770 $3.770
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 2,346.000 $1.850 $0.840 $2.400 $0.440 $5.000
BRIDGE JOINT REPAIR (ARMOR)
LF 90.000 $70.000 $400.000 $378.000 $491.000 $800.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 419.000 $700.000 $550.000 $525.000 $586.000 $730.000
SP MIXES SP-C SAC-A PG70-28
TON 14,736.000 $155.000 $165.000 $155.400 $161.750 $169.000
TACK COAT
GAL 25,627.000 $8.000 $0.010 $1.500 $0.250 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $170.000 $50.000 $58.000 $97.430 $115.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,000.000 $13,500.000 $11,366.250 $18,000.000
TMA (STATIONARY)
DAY 100.000 $200.000 $500.000 $200.000 $396.700 $350.000
TMA (MOBILE OPERATION)
DAY 100.000 $300.000 $100.000 $270.000 $30.000 $950.000
Totals: $5,908,901.150 $5,497,888.160 $5,558,389.170 $5,624,209.360 $6,563,622.990