Show Job Controls
Bid Cobra

TARRANT SH 121 (0364-01-158)

Items: 22

County: TARRANT
Length: N/A
Highway: SH 121
District: FORT WORTH
Control Number: 0364-01-158
DBE Goal: N/A
Project: STP 2023(868)HES
Guaranty: N/A
Time: 43 WORKING DAYS
Engineer's Estimate: $143,906.00
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: INSTALL INTELLIGENT VEHICLE HIGHWAY SYSTEM
Mail/Deliver Bids To: N/A
THERESA POER
CARLOS MOLINA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$143,906.00
Over/Under Est: 16.84% $24,239.55
$204,285.00
Over/Under Est: 41.96% $60,379.00
Amt Left: 21.49% $36,139.45

Bid Items & Bid Tabulations

22 Total 0 of 22
TARRANT  |  SH 121  |  FORT WORTH  |  0364-01-158  |  06/02/2023  |  $143,906.00  |  STP 2023(868)HES  |  INSTL INTELLIGENT VEHICLE HWY SYSTEM  |  43 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
MICA CORPORATION
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 12.000 $320.000 $314.230 $340.000
MOBILIZATION
LS 1.000 $13,083.000 $21,159.910 $19,750.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $15,000.000 $21,374.000 $10,025.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 30.000 $30.000 $0.090 $33.100
BIODEG EROSN CONT LOGS (REMOVE)
LF 30.000 $15.000 $0.090 $21.600
CONDT (PVC) (SCH 40) (2")
LF 55.000 $29.000 $25.890 $35.000
CONDT (PVC) (SCH 40) (3")
LF 45.000 $40.000 $31.260 $70.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 455.000 $50.000 $38.380 $34.000
ELEC CONDR (NO.4) BARE
LF 465.000 $10.000 $2.750 $3.200
ELEC CONDR (NO.4) INSULATED
LF 880.000 $12.000 $3.140 $3.600
GROUND BOX TY D (162922)W/APRON
EA 1.000 $2,000.000 $2,325.500 $2,200.000
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 1.000 $10,000.000 $7,429.200 $11,800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $850.000 $683.240 $1,150.000
REMOVE SM RD SN SUP&AM
EA 3.000 $250.000 $352.000 $300.000
REFL PAV MRKR TY I-R
EA 42.000 $11.500 $33.380 $22.000
PAV SURF PREP FOR MRK (RPM)
EA 42.000 $5.000 $33.380 $22.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 7.000 $150.000 $241.000 $390.000
ITS RADIO (SNGL)(5 GHZ)-I-U
EA 2.000 $6,600.000 $13,985.000 $7,105.000
TMA (STATIONARY)
DAY 15.000 $290.000 $208.900 $390.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 2.000 $4,700.000 $7,104.200 $5,500.000
INSTALL OF HARD ETHERNET SWITCH
EA 1.000 $650.000 $2,965.000 $2,300.000
INST WRONG WAY DRIVER SYSTEM EQUIPMENT
EA 1.000 $8,785.000 $9,814.500 $76,125.000
Totals: $143,906.000 $168,145.550 $204,285.000