Show Job Controls
Bid Cobra

TARRANT SH 121 (0364-01-148)

Items: 175

County: TARRANT
Length: N/A
Highway: SH 121
District: FORT WORTH
Control Number: 0364-01-148
DBE Goal: N/A
Project: STP 1802(550)MM
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $22,086,313.82
Date: 09/07/2018 (7 years ago)
Contract Number: N/A
Type: GR,BS,DR,PAV,STR,ITS,PAV MK, SIGN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (10)
E
Engineer's Estimate
$22,086,313.82
$20,514,949.44
Over/Under Est: -7.11% -$1,571,364.38
$21,170,575.16
Over/Under Est: -4.15% -$915,738.66
Amt Left: 3.2% $655,625.72
Over/Under Est: -3.19% -$703,908.21
Amt Left: 4.23% $867,456.17
Delta: -1.00% -$211,830.45
Over/Under Est: -2.85% -$628,565.05
Amt Left: 4.6% $942,799.33
Delta: -0.35% -$75,343.16
$21,593,000.00
Over/Under Est: -2.23% -$493,313.82
Amt Left: 5.25% $1,078,050.56
Delta: -0.63% -$135,251.23
Over/Under Est: -0.17% -$37,517.50
Amt Left: 7.48% $1,533,846.88
Delta: -2.11% -$455,796.32
Over/Under Est: 6.17% $1,362,995.03
Amt Left: 14.3% $2,934,359.41
Delta: -6.35% -$1,400,512.53
Over/Under Est: 8.64% $1,908,090.65
Amt Left: 16.96% $3,479,455.03
Delta: -2.32% -$545,095.62
Over/Under Est: 9.88% $2,182,814.03
Amt Left: 18.3% $3,754,178.41
Delta: -1.14% -$274,723.38
$25,118,729.98
Over/Under Est: 13.73% $3,032,416.16
Amt Left: 22.44% $4,603,780.54
Delta: -3.50% -$849,602.13

Bid Items & Bid Tabulations

175 Total 0 of 175
TARRANT  |  SH 121  |  FORT WORTH  |  0364-01-148  |  09/07/2018  |  $22,086,313.82  |  STP 1802(550)MM  |  GR,BS,DR,PAV,STR,ITS,PAV MK, SIGN  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
FLUOR HEAVY CIVIL, LLC
FLATIRON CONSTRUCTORS, INC.
STERLING DELAWARE HOLDING COMPANY, INC.
WEBBER, LLC
MARIO SINACOLA & SONS EXCAVATING, INC.
ED BELL CONSTRUCTION COMPANY
RAGLE CONSTRUCTION, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
J.D. ABRAMS, L.P.
PREPARING ROW
STA 171.500 $5,000.000 $5,590.000 $9,203.470 $10,722.370 $2,695.000 $10,275.000 $4,000.000 $5,500.000 $11,000.000 $4,000.000 $11,250.000
REMOVING CONC (PAV)
SY 300.000 $10.000 $17.970 $37.230 $21.860 $16.500 $23.000 $10.000 $21.000 $8.100 $20.000 $14.700
REMOVING CONC (RIPRAP)
SY 3,495.000 $10.000 $2.970 $9.170 $4.240 $2.500 $7.000 $10.000 $7.350 $12.150 $8.000 $6.000
REMOVING CONCRETE(MOW STRIP)
LF 260.000 $10.000 $3.060 $11.730 $5.260 $2.000 $11.000 $10.000 $6.300 $1.200 $8.000 $7.000
REMOVING STAB BASE & ASPH PAV (12"-14")
SY 16,600.000 $11.000 $8.310 $7.300 $4.800 $3.500 $6.000 $2.000 $9.450 $7.500 $4.280 $1.000
EXCAVATION (ROADWAY)
CY 22,312.000 $6.000 $6.250 $8.410 $6.690 $3.000 $12.200 $10.000 $11.550 $20.000 $12.070 $11.300
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 3,161.000 $6.000 $3.610 $10.870 $19.320 $12.000 $5.650 $7.000 $5.250 $10.000 $8.720 $7.500
COMPOST MANUF TOPSOIL (4")
SY 71,278.000 $3.000 $2.410 $2.750 $1.370 $2.650 $3.250 $2.000 $1.500 $1.080 $1.290 $0.930
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 79,608.000 $0.350 $0.150 $0.150 $0.150 $0.150 $0.200 $0.150 $0.750 $0.150 $0.110 $0.160
DRILL SEEDING (TEMP) (WARM)
SY 39,810.000 $0.350 $0.140 $0.140 $0.140 $0.140 $0.300 $0.140 $0.160 $0.140 $0.070 $0.150
DRILL SEEDING (TEMP) (COOL)
SY 39,798.000 $0.350 $0.140 $0.140 $0.140 $0.140 $0.300 $0.140 $0.160 $0.140 $0.080 $0.150
VEGETATIVE WATERING
MG 6,368.000 $12.500 $0.010 $18.000 $22.240 $24.000 $24.000 $4.150 $24.550 $5.000 $15.000 $24.500
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
CY 4,036.000 $53.000 $47.810 $55.760 $40.710 $51.000 $50.000 $45.000 $60.000 $55.000 $60.000 $61.000
LIME (HYD, COM, OR QK(SLURRY))
TON 923.000 $150.000 $160.000 $173.350 $170.000 $197.000 $165.000 $162.000 $180.000 $160.000 $160.000 $176.000
LIME TRT (EXST MATL)(8")
SY 54,101.000 $3.000 $3.380 $3.150 $3.230 $3.000 $3.400 $5.000 $2.500 $3.250 $5.000 $2.900
LIME TRT (EXST MATL)(22")
SY 455.000 $5.000 $23.810 $3.920 $28.420 $30.000 $17.000 $20.000 $25.000 $20.000 $24.000 $45.500
PRIME COAT (MC-30 OR EC-30)
GAL 10,365.000 $7.500 $3.650 $4.000 $5.150 $5.150 $4.750 $4.800 $4.220 $3.100 $2.720 $4.600
AGGR(TY-PB GR-3 SAC-B)
CY 107.000 $70.000 $350.000 $325.000 $400.000 $400.000 $421.000 $400.000 $342.880 $400.000 $85.000 $460.000
AGGR(TY-PB GR-4 SAC-B)
CY 87.000 $89.000 $410.000 $400.000 $425.000 $425.000 $447.000 $425.000 $422.000 $425.000 $86.000 $490.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 7,974.000 $5.800 $5.700 $5.000 $7.000 $7.000 $7.350 $7.000 $5.540 $7.000 $3.940 $8.100
D-GR HMA(SQ) TY-B PG64-22
TON 929.000 $103.000 $73.800 $83.750 $71.850 $71.850 $66.500 $71.850 $88.360 $76.000 $70.000 $97.000
D-GR HMA(SQ) TY-C PG64-22
TON 5,541.000 $85.000 $73.640 $79.500 $78.700 $78.700 $73.000 $78.700 $83.870 $75.000 $75.000 $92.000
D-GR HMA(SQ) TY-D SAC-B PG70-28
TON 339.000 $200.000 $91.780 $128.500 $99.550 $99.550 $92.250 $99.550 $135.570 $121.000 $80.000 $148.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,875.000 $5.000 $5.370 $3.010 $3.600 $2.750 $5.000 $4.510 $9.450 $4.500 $1.520 $6.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 38,547.000 $50.000 $58.750 $62.870 $41.000 $73.000 $58.000 $64.150 $55.000 $68.000 $70.000 $71.000
CONC PVMT (CONT REINF - CRCP) (11")
SY 4,793.000 $60.000 $71.260 $68.060 $57.000 $77.000 $67.750 $80.000 $66.000 $75.000 $89.000 $84.000
HALF - DEPTH REPAIR CRCP (11")
SY 429.000 $500.000 $63.290 $318.000 $200.000 $196.500 $175.000 $50.000 $94.500 $50.000 $120.000 $67.000
CEM STABIL BKFL
CY 1,627.400 $150.000 $131.190 $136.300 $107.410 $153.000 $110.000 $110.000 $155.000 $81.000 $143.890 $155.000
TEMPORARY SPL SHORING
SF 2,453.000 $17.500 $32.500 $35.200 $32.500 $32.500 $55.000 $40.000 $42.000 $5.000 $22.910 $49.000
DRILL SHAFT (18 IN)
LF 812.000 $85.000 $44.080 $47.960 $44.910 $60.000 $80.000 $50.000 $75.000 $55.500 $65.450 $74.000
DRILL SHAFT (36 IN)
LF 5,959.000 $150.000 $180.000 $147.890 $149.410 $153.000 $175.000 $160.000 $175.000 $156.000 $173.530 $195.000
DRILL SHAFT (48 IN)
LF 21.000 $250.000 $313.000 $322.980 $316.890 $381.000 $313.000 $320.000 $364.290 $313.000 $300.000 $315.000
DRILL SHAFT (54 IN)
LF 42.000 $675.000 $399.000 $408.900 $403.790 $452.870 $399.000 $400.000 $492.860 $399.000 $500.000 $400.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 41.000 $312.000 $358.000 $239.790 $358.000 $330.670 $358.000 $358.000 $342.860 $358.000 $375.000 $360.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 44.000 $400.000 $384.000 $392.390 $384.000 $368.050 $384.000 $384.000 $407.140 $384.000 $400.000 $385.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 115.000 $338.000 $397.000 $408.140 $397.000 $427.570 $397.000 $397.000 $482.140 $397.000 $415.000 $398.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 431.000 $1,000.000 $1,120.000 $699.050 $917.950 $1,500.000 $864.000 $1,300.000 $1,155.000 $1,000.000 $1,522.410 $1,500.000
CL C CONC (CAP)(HPC)
CY 355.300 $1,200.000 $1,100.000 $842.830 $830.870 $1,200.000 $1,250.000 $1,000.000 $1,155.000 $1,300.000 $1,887.310 $1,100.000
CL C CONC (COLUMN)(HPC)
CY 296.800 $900.000 $850.000 $689.600 $845.470 $825.000 $748.000 $1,100.000 $945.000 $900.000 $1,294.750 $1,000.000
REINF CONC SLAB (EXTEND SLAB)(HPC)
SF 85,542.000 $17.000 $19.500 $19.250 $15.480 $21.000 $18.000 $25.000 $25.200 $25.000 $25.000 $23.000
APPROACH SLAB (EXTEND) (HPC)
CY 625.400 $700.000 $520.000 $570.000 $459.540 $443.000 $413.000 $700.000 $630.000 $480.000 $668.080 $500.000
PRESTR CONC GIRDER (TX40)
LF 3,337.980 $120.000 $127.000 $154.620 $136.920 $200.000 $130.000 $180.000 $150.000 $150.000 $163.070 $175.000
PRESTR CONC GIRDER (TX54)
LF 4,926.780 $120.000 $130.000 $164.840 $178.340 $200.000 $130.000 $180.000 $165.000 $145.000 $154.760 $200.000
RIPRAP (CONC)(4 IN)
CY 450.000 $400.000 $354.190 $320.000 $322.500 $375.000 $390.000 $430.000 $525.000 $300.000 $588.720 $360.000
RIPRAP (CONC)(5 IN)
CY 468.000 $400.000 $354.050 $325.000 $329.150 $350.000 $382.000 $435.000 $420.000 $350.000 $619.860 $285.000
RIPRAP (CONC) (CL A )
CY 6.250 $495.000 $451.470 $565.000 $418.000 $730.000 $900.000 $850.000 $945.000 $700.000 $1,222.000 $415.000
RIPRAP (MOW STRIP)(4 IN)
CY 120.000 $470.000 $376.770 $340.000 $351.000 $452.000 $437.000 $430.000 $525.000 $500.000 $955.830 $545.000
RAIL (TY T551)(HPC)
LF 3,114.700 $100.000 $61.440 $55.200 $45.540 $48.000 $56.000 $60.000 $55.000 $40.000 $62.000 $62.000
RETROFIT RAIL (TY T551)(HPC)
LF 357.100 $100.000 $81.890 $48.000 $67.760 $92.000 $279.000 $132.000 $125.000 $70.000 $180.000 $145.000
ARMOR JOINT (SEALED)
LF 1,473.000 $100.000 $131.630 $92.920 $77.420 $72.000 $81.250 $82.000 $63.000 $83.000 $152.280 $82.000
RC PIPE (CL III)(24 IN)
LF 42.000 $55.000 $55.000 $128.370 $116.550 $106.000 $140.000 $275.000 $135.000 $100.000 $100.000 $200.000
RC PIPE (CL III)(30 IN)
LF 9.000 $82.000 $65.000 $254.830 $193.000 $152.000 $170.000 $620.000 $420.000 $200.000 $120.000 $490.000
RC PIPE (CL III)(42 IN)
LF 7.000 $132.000 $75.000 $378.430 $313.770 $270.000 $300.000 $890.000 $735.000 $300.000 $180.000 $632.000
INLET (COMPL)(PCU)(5FT)(NONE)
EA 1.000 $5,000.000 $5,000.000 $3,493.210 $3,302.470 $5,900.000 $5,938.900 $5,800.000 $4,200.000 $5,500.000 $5,000.000 $4,650.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
EA 2.000 $5,900.000 $5,000.000 $4,998.910 $3,984.570 $8,100.000 $8,500.000 $9,000.000 $5,250.000 $5,500.000 $5,000.000 $4,250.000
REMOV STR (INLET)
EA 3.000 $900.000 $500.000 $1,402.970 $1,557.670 $780.000 $2,500.000 $2,000.000 $525.000 $500.000 $1,500.000 $740.000
REMOV STR (PIPE)
LF 52.000 $13.000 $15.000 $18.360 $40.970 $16.000 $55.000 $50.000 $42.000 $20.000 $25.000 $16.200
MOBILIZATION
LS 1.000 $1,628,752.000 $1,720,000.000 $1,795,000.000 $1,838,886.920 $1,800,000.000 $1,900,000.000 $2,000,000.000 $1,887,000.000 $1,900,000.000 $1,909,044.060 $1,900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $12,000.000 $9,550.000 $10,400.790 $13,542.030 $2,350.000 $10,600.000 $10,000.000 $31,500.000 $18,000.000 $7,642.860 $23,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 38.000 $35.000 $21.000 $21.000 $16.250 $16.250 $28.000 $30.000 $22.050 $37.000 $40.000 $20.500
ROCK FILTER DAMS (REMOVE)
LF 38.000 $12.000 $8.000 $9.480 $11.250 $11.250 $9.400 $10.000 $8.400 $14.000 $10.000 $14.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,344.000 $25.000 $20.000 $20.000 $12.750 $12.750 $21.200 $30.000 $21.000 $17.000 $30.000 $18.500
CONSTRUCTION EXITS (REMOVE)
SY 1,344.000 $10.000 $8.000 $11.280 $7.990 $7.990 $6.900 $2.000 $8.400 $9.250 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,688.000 $3.500 $1.650 $1.650 $1.200 $1.200 $2.000 $1.350 $1.730 $1.450 $2.000 $1.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,688.000 $0.750 $0.500 $0.500 $0.500 $0.500 $0.400 $0.100 $0.530 $0.420 $0.750 $0.650
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,215.000 $4.000 $3.500 $3.500 $2.450 $2.450 $4.600 $2.900 $3.680 $3.250 $4.000 $3.100
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,215.000 $1.100 $0.750 $0.750 $0.500 $0.500 $0.900 $0.100 $0.790 $0.500 $0.600 $0.650
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 18,391.000 $28.000 $41.890 $3.880 $70.000 $46.000 $58.000 $40.000 $63.000 $52.000 $16.570 $41.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 29,325.000 $5.000 $4.000 $8.040 $5.410 $4.000 $4.000 $7.000 $4.000 $2.500 $8.840 $4.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 14,900.000 $12.000 $3.960 $4.680 $5.360 $5.000 $4.400 $7.000 $4.000 $6.500 $7.020 $3.900
MTL W-BEAM GD FEN (TIM POST)
LF 1,800.000 $21.000 $16.000 $23.500 $16.000 $18.000 $21.500 $18.000 $17.140 $18.000 $19.000 $17.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,575.000 $1,427.000 $1,560.000 $1,427.000 $1,475.000 $1,680.000 $1,475.000 $1,601.420 $1,475.000 $2,500.000 $1,570.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,200.000 $883.000 $1,325.000 $883.000 $1,025.000 $1,140.000 $1,025.000 $1,200.000 $1,025.000 $2,800.000 $975.000
REMOVE METAL BEAM GUARD FENCE
LF 1,010.000 $4.000 $2.000 $4.000 $2.000 $4.000 $3.000 $4.000 $3.210 $4.000 $3.000 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $200.000 $200.000 $125.000 $200.000 $130.000 $225.000 $130.000 $267.860 $130.000 $200.000 $220.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $250.000 $500.000 $250.000 $500.000 $175.000 $250.000 $175.000 $321.430 $175.000 $250.000 $550.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $2,500.000 $2,261.000 $2,500.000 $2,261.000 $2,550.000 $2,500.000 $2,550.000 $2,416.070 $2,550.000 $2,500.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $500.000 $500.000 $250.000 $500.000 $325.000 $250.000 $325.000 $375.000 $325.000 $300.000 $550.000
CRASH CUSH ATTEN (INSTL)
EA 20.000 $11,750.000 $9,538.580 $12,368.500 $11,700.000 $13,250.000 $12,350.000 $10,000.000 $15,000.000 $13,250.000 $8,000.000 $15,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,000.000 $914.040 $1,800.000 $1,500.000 $1,450.000 $1,880.000 $7,500.000 $3,150.000 $1,450.000 $2,000.000 $3,800.000
CRASH CUSH ATTEN (REMOVE)
EA 21.000 $700.000 $519.290 $600.000 $800.000 $775.000 $885.000 $1,500.000 $1,155.000 $775.000 $2,000.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $22,000.000 $18,776.080 $30,000.000 $18,300.000 $23,475.000 $19,850.000 $20,000.000 $21,000.000 $23,475.000 $15,000.000 $23,000.000
CONDT (PVC) (SCH 40) (2")
LF 364.000 $7.900 $8.500 $8.500 $8.500 $7.630 $8.500 $8.500 $5.360 $8.500 $6.000 $8.750
CONDT (PVC) (SCH 40) (2") (BORE)
LF 235.000 $20.000 $19.850 $19.850 $19.850 $21.520 $19.900 $19.850 $11.790 $19.850 $20.000 $20.000
CONDT (PVC) (SCH 40) (3")
LF 6,823.000 $11.650 $11.000 $11.000 $11.000 $9.470 $11.000 $11.000 $9.640 $11.000 $11.000 $11.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 4,073.000 $28.000 $17.300 $17.300 $17.300 $16.450 $17.300 $17.300 $17.140 $17.300 $19.000 $18.000
CONDT (RM) (3")
LF 28.000 $37.000 $54.000 $54.000 $54.000 $63.050 $54.000 $54.000 $48.210 $54.000 $50.000 $55.000
ELEC CONDR (NO.8) BARE
LF 30,708.000 $1.060 $1.100 $1.100 $1.100 $0.840 $1.100 $1.100 $0.860 $1.100 $1.000 $1.150
ELEC CONDR (NO.8) INSULATED
LF 656.000 $1.170 $1.200 $1.200 $1.200 $0.930 $1.200 $1.200 $0.860 $1.200 $1.000 $1.250
ELEC CONDR (NO.6) BARE
LF 323.000 $1.440 $1.250 $1.250 $1.250 $1.110 $1.250 $1.250 $0.860 $1.250 $1.200 $1.300
ELEC CONDR (NO.6) INSULATED
LF 1,212.000 $1.710 $1.350 $1.350 $1.350 $1.240 $1.350 $1.350 $1.070 $1.350 $1.200 $1.400
ELEC CONDR (NO.4) BARE
LF 1,393.000 $1.710 $1.500 $1.500 $1.500 $1.510 $1.500 $1.500 $1.390 $1.500 $1.530 $1.550
ELEC CONDR (NO.4) INSULATED
LF 6,632.000 $2.050 $1.560 $1.560 $1.560 $1.550 $1.550 $1.560 $1.390 $1.560 $1.530 $1.600
ELEC CONDR (NO.2) BARE
LF 838.000 $3.150 $2.300 $2.300 $2.300 $1.790 $2.300 $2.300 $2.140 $2.300 $2.360 $2.350
ELEC CONDR (NO.2) INSULATED
LF 2,514.000 $3.800 $2.400 $2.400 $2.400 $1.960 $2.400 $2.400 $2.140 $2.400 $2.360 $2.450
ELEC CONDR (NO.1/0) BARE
LF 3,039.000 $4.000 $3.110 $3.110 $3.110 $2.510 $3.100 $3.110 $2.790 $3.110 $3.080 $3.150
ELEC CONDR (NO.1/0) INSULATED
LF 15,465.000 $4.000 $3.150 $3.150 $3.150 $2.870 $3.150 $3.150 $3.210 $3.150 $3.550 $3.200
REMOVE ELECTRICAL SERVICES
EA 2.000 $500.000 $255.000 $255.000 $255.000 $250.210 $255.000 $255.000 $1,071.430 $255.000 $1,179.000 $256.000
ELC SRV TY D 120/240 060(NS)GS(N)SP(U)
EA 2.000 $2,500.000 $5,755.000 $5,755.000 $5,755.000 $4,767.470 $5,760.000 $5,755.000 $3,428.570 $5,755.000 $3,773.000 $5,800.000
ELC SRV TY D 120/240 100(NS)GS(N)SP(U)
EA 5.000 $2,500.000 $5,835.000 $5,835.000 $5,835.000 $4,779.130 $5,840.000 $5,835.000 $3,750.000 $5,835.000 $4,127.000 $5,850.000
ELC SRV TY D 120/240 200(NS)GS(N)SP(U)
EA 1.000 $3,500.000 $5,925.000 $5,925.000 $5,925.000 $5,221.600 $5,930.000 $5,925.000 $3,857.140 $5,925.000 $4,245.000 $5,950.000
ALUMINUM SIGNS (TY O)
SF 2,053.000 $21.000 $20.000 $20.000 $20.000 $21.070 $20.000 $20.000 $19.290 $20.000 $22.000 $20.100
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 480.000 $31.000 $30.150 $30.150 $30.150 $28.860 $30.250 $30.150 $21.430 $30.150 $24.000 $30.200
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $440.000 $881.000 $881.000 $881.000 $800.000 $881.000 $881.000 $701.790 $881.000 $717.000 $885.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,100.000 $2,310.000 $2,310.000 $2,310.000 $2,545.000 $2,310.000 $2,310.000 $2,142.860 $3,800.000 $2,189.000 $2,320.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,600.000 $2,310.000 $2,310.000 $2,310.000 $2,545.000 $2,310.000 $2,310.000 $2,142.860 $3,800.000 $2,189.000 $2,320.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $400.000 $794.000 $794.000 $794.000 $256.000 $794.000 $794.000 $716.230 $794.000 $438.000 $800.000
REMOVE SM RD SN SUP&AM
EA 2.000 $140.000 $252.000 $252.000 $252.000 $120.000 $252.000 $252.000 $319.800 $252.000 $40.000 $255.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 1.000 $600.000 $630.000 $630.000 $630.000 $715.000 $630.000 $630.000 $1,646.750 $630.000 $1,094.000 $635.000
REMOVE LRSA
EA 7.000 $583.000 $505.000 $505.000 $505.000 $1,463.820 $505.000 $505.000 $1,539.610 $505.000 $985.000 $510.000
INS OH SN SUP(25 FT CANT)
EA 1.000 $15,225.000 $10,375.000 $10,375.000 $10,375.000 $12,325.980 $10,380.000 $10,375.000 $12,857.150 $10,375.000 $14,200.000 $10,400.000
INS OH SN SUP(30 FT CANT)
EA 4.000 $15,750.000 $13,185.000 $13,185.000 $13,185.000 $14,257.710 $13,190.000 $13,185.000 $15,000.000 $13,185.000 $16,600.000 $13,200.000
INS OH SN SUP(35 FT BAL TEE)
EA 2.000 $31,000.000 $24,620.000 $24,620.000 $24,620.000 $24,610.210 $24,620.000 $24,620.000 $23,571.430 $24,620.000 $26,000.000 $24,700.000
INS OH SN SUP(35 FT CANT)
EA 4.000 $18,800.000 $15,820.000 $15,820.000 $15,820.000 $16,155.160 $15,820.000 $15,820.000 $17,142.860 $15,820.000 $18,900.000 $15,850.000
INS OH SN SUP(40 FT CANT)
EA 4.000 $21,300.000 $16,775.000 $16,775.000 $16,775.000 $17,517.860 $16,780.000 $16,775.000 $17,142.860 $16,775.000 $18,900.000 $16,800.000
REMOVE OVERHD SIGN SUP
EA 1.000 $5,142.000 $3,275.000 $3,275.000 $3,275.000 $3,023.090 $3,280.000 $3,275.000 $4,861.030 $3,275.000 $4,720.000 $3,300.000
SIGN WALKWAY (48 IN) WITH HNDRL
LF 20.000 $246.000 $162.000 $162.000 $162.000 $304.510 $162.000 $162.000 $321.430 $162.000 $328.000 $163.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 125.000 $25.000 $20.000 $28.000 $20.000 $22.000 $20.000 $15.000 $43.320 $25.000 $10.000 $24.100
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 11,500.000 $1.300 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.050 $1.000 $1.010 $1.250
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 51,999.000 $0.750 $0.850 $0.750 $0.750 $0.850 $0.850 $0.850 $0.890 $0.850 $0.860 $1.100
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 37,853.000 $0.750 $0.850 $0.750 $0.750 $0.850 $0.850 $0.850 $0.890 $0.850 $0.860 $1.100
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 258.000 $1.000 $1.000 $1.100 $1.100 $1.000 $1.000 $1.000 $1.050 $1.000 $1.010 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 28,669.000 $0.900 $0.750 $0.870 $0.870 $0.750 $0.750 $0.750 $0.790 $0.750 $0.760 $0.800
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 695.000 $1.500 $3.200 $3.400 $3.400 $3.200 $3.200 $3.200 $3.360 $3.200 $3.220 $3.300
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,771.000 $2.200 $2.850 $5.880 $5.880 $2.850 $2.850 $2.850 $2.990 $2.850 $2.870 $2.900
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $130.000 $150.000 $115.000 $115.000 $150.000 $150.000 $150.000 $157.500 $150.000 $151.070 $152.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $153.000 $150.000 $130.000 $130.000 $150.000 $150.000 $150.000 $157.500 $150.000 $151.070 $152.000
REFL PAV MRK TY I (Y)6"(DOT)(100MIL)
LF 258.000 $1.000 $1.000 $2.150 $2.150 $1.000 $1.000 $1.000 $1.050 $1.000 $1.010 $1.100
REFL PAV MRK TY II (W) 4" (SLD)
LF 26,277.000 $0.210 $0.150 $0.150 $0.150 $0.150 $0.150 $0.150 $0.160 $0.150 $0.150 $0.200
REFL PAV MRK TY II (W) 6" (BRK)
LF 8,497.000 $0.280 $0.200 $0.240 $0.240 $0.200 $0.200 $0.200 $0.210 $0.200 $0.200 $0.250
REFL PAV MRK TY II (W) 8" (LNDP)
LF 258.000 $0.410 $0.500 $0.350 $0.350 $0.500 $0.500 $0.500 $0.530 $0.500 $0.500 $0.550
REFL PAV MRK TY II (W) 8" (SLD)
LF 28,319.000 $0.390 $0.250 $0.240 $0.240 $0.250 $0.250 $0.250 $0.260 $0.250 $0.250 $0.300
REFL PAV MRK TY II (W) 12" (LNDP)
LF 695.000 $1.800 $1.500 $1.350 $1.350 $1.500 $1.500 $1.500 $1.580 $1.500 $1.510 $1.600
REFL PAV MRK TY II (W) 12" (SLD)
LF 1,771.000 $1.810 $1.500 $1.450 $1.450 $1.500 $1.500 $1.500 $1.580 $1.500 $1.510 $1.600
REFL PAV MRK TY II (W) (ARROW)
EA 4.000 $41.000 $30.000 $57.000 $57.000 $30.000 $30.000 $30.000 $31.500 $30.000 $30.220 $31.000
REFL PAV MRK TY II (W) (WORD)
EA 2.000 $50.000 $50.000 $61.000 $61.000 $50.000 $50.000 $50.000 $52.500 $50.000 $50.360 $51.000
REFL PAV MRK TY II (Y) 6" (DOT)
LF 258.000 $1.250 $0.200 $0.440 $0.440 $0.200 $0.200 $0.200 $0.210 $0.200 $0.200 $0.250
REFL PAV MRK TY II (Y) 6" (SLD)
LF 26,883.000 $0.220 $0.200 $0.220 $0.220 $0.200 $0.200 $0.200 $0.210 $0.200 $0.200 $0.250
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 26,277.000 $0.280 $0.420 $0.450 $0.450 $0.420 $0.400 $0.420 $0.440 $0.420 $0.420 $0.450
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 8,497.000 $0.650 $0.620 $0.740 $0.740 $0.620 $0.600 $0.620 $0.650 $0.620 $0.620 $0.650
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 26,883.000 $0.540 $0.620 $0.670 $0.670 $0.620 $0.600 $0.620 $0.650 $0.620 $0.620 $0.650
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 449.000 $2.650 $3.200 $5.000 $5.000 $3.200 $3.200 $3.200 $3.360 $3.200 $3.220 $3.250
REFL PAV MRK TY II (W)12"(DOT)
LF 449.000 $3.000 $1.500 $3.000 $3.000 $1.500 $1.500 $1.500 $1.580 $1.500 $1.510 $1.550
REFL PAV MRKR TY II-C-R
EA 953.000 $5.000 $3.600 $5.000 $5.000 $3.600 $3.600 $3.600 $3.780 $3.600 $3.630 $3.650
ELIM EXT PAV MRK & MRKS (4")
LF 75,362.000 $0.300 $0.250 $0.350 $0.350 $0.250 $0.250 $0.250 $0.260 $0.250 $0.250 $0.300
ELIM EXT PAV MRK & MRKS (8")
LF 4,794.000 $0.330 $0.350 $0.560 $0.560 $0.350 $0.350 $0.350 $0.370 $0.350 $0.350 $0.400
PAV SURF PREP FOR MRK (4")
LF 26,277.000 $0.160 $0.060 $0.220 $0.220 $0.060 $0.050 $0.060 $0.060 $0.060 $0.060 $0.070
PAV SURF PREP FOR MRK (6")
LF 35,625.000 $0.100 $0.100 $0.330 $0.330 $0.100 $0.100 $0.100 $0.110 $0.100 $0.100 $0.070
PAV SURF PREP FOR MRK (8")
LF 28,927.000 $0.220 $0.150 $0.450 $0.450 $0.150 $0.150 $0.150 $0.160 $0.150 $0.150 $0.160
PAV SURF PREP FOR MRK (12")
LF 2,220.000 $0.530 $0.500 $1.000 $1.000 $0.500 $0.500 $0.500 $0.530 $0.500 $0.500 $0.550
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $20.000 $50.000 $30.000 $30.000 $50.000 $50.000 $50.000 $52.500 $50.000 $50.360 $55.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $32.000 $50.000 $37.000 $37.000 $50.000 $50.000 $50.000 $52.500 $50.000 $50.360 $55.000
NO. OF WORKING DAYS
$/D 9,000.000 $448.000 $343.000 $300.000 $305.000 $315.000 $270.000 $320.000 $369.000 $448.000 $448.000 $423.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $10,000.000 $1.080 $20,355.060 $17,320.000 $11,000.000 $7,525.000 $9,250.000 $15,000.000 $2,500.000 $15,000.000 $7,200.000
FO CBL (36 SMF)
LF 13,223.000 $4.000 $1.450 $1.450 $1.450 $3.150 $1.450 $1.450 $2.360 $1.450 $2.590 $1.500
FO CBL (72 SMF)
LF 54,580.000 $3.000 $1.550 $1.550 $1.550 $1.900 $1.550 $1.550 $2.460 $1.550 $2.710 $1.600
FO SPLICE ENCLOSURE (TYPE 1)
EA 25.000 $2,000.000 $1,745.000 $1,745.000 $1,745.000 $446.340 $1,750.000 $1,745.000 $857.140 $1,745.000 $943.250 $1,750.000
FIBER OPTIC FUSION SPLICE
EA 612.000 $48.500 $27.200 $27.200 $27.200 $41.780 $27.200 $27.200 $53.570 $27.200 $58.950 $27.300
ITS GRND MNT CAB (TY 4) (CONF 2)
EA 4.000 $8,800.000 $12,590.000 $12,590.000 $12,590.000 $7,941.910 $12,590.000 $12,590.000 $8,250.000 $12,590.000 $9,078.780 $12,600.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $8,385.000 $10,915.000 $10,915.000 $10,915.000 $7,375.490 $10,920.000 $10,915.000 $9,107.140 $10,915.000 $10,022.030 $11,000.000
CCTV MOUNT (POLE)
EA 1.000 $400.000 $227.000 $227.000 $227.000 $945.430 $227.000 $227.000 $321.430 $227.000 $353.720 $230.000
ITS MULTI-DUCT CND (PVC-40)
LF 38,888.000 $20.000 $16.210 $16.210 $16.210 $17.970 $16.200 $16.210 $16.070 $16.210 $17.690 $16.500
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 10,702.000 $30.000 $19.750 $19.750 $19.750 $26.790 $19.800 $19.750 $38.570 $19.750 $42.450 $20.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 6.000 $25,000.000 $17,120.000 $17,120.000 $17,120.000 $7,499.520 $17,120.000 $17,120.000 $3,214.290 $17,120.000 $3,537.190 $17,200.000
RADAR VEHICLE SENSING DEVICE
EA 5.000 $11,000.000 $10,880.000 $10,880.000 $10,880.000 $8,918.470 $10,880.000 $10,880.000 $7,714.280 $10,880.000 $8,489.250 $10,900.000
REMOVE ITS RADIO
EA 11.000 $700.000 $945.000 $945.000 $945.000 $385.290 $945.000 $945.000 $428.570 $945.000 $471.620 $950.000
ITS POLE (30 FT)(90 MPH)
EA 4.000 $7,700.000 $5,625.000 $5,625.000 $5,625.000 $5,575.810 $5,630.000 $5,625.000 $5,357.140 $5,625.000 $5,895.310 $5,650.000
ITS POLE (60 FT)(90 MPH)
EA 1.000 $17,500.000 $12,945.000 $12,945.000 $12,945.000 $14,224.620 $12,950.000 $12,945.000 $12,857.150 $12,945.000 $14,148.750 $12,950.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 4.000 $6,600.000 $6,000.000 $6,000.000 $6,000.000 $5,183.110 $6,000.000 $6,000.000 $5,892.860 $6,000.000 $6,484.840 $6,050.000
ITS POLE MNT CAB (TY 3)(CONF 2)
EA 1.000 $7,300.000 $6,130.000 $6,130.000 $6,130.000 $4,919.990 $6,130.000 $6,130.000 $6,000.000 $6,130.000 $6,602.750 $6,150.000
TMA (STATIONARY)
EA 10.000 $7,500.000 $1.080 $35,396.490 $56,000.000 $9,000.000 $9,250.000 $5,000.000 $10,000.000 $5,000.000 $27,296.930 $16,000.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 24.000 $3,373.000 $2,485.000 $2,485.000 $2,485.000 $2,588.690 $2,490.000 $2,485.000 $3,482.140 $2,485.000 $3,831.950 $2,500.000
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 20.000 $4,837.000 $3,335.000 $3,335.000 $3,335.000 $3,523.860 $3,340.000 $3,335.000 $4,178.570 $3,335.000 $4,598.340 $3,350.000
LCS SYSTEM
EA 4.000 $40,000.000 $21,800.000 $21,800.000 $21,800.000 $5,062.820 $21,800.000 $21,800.000 $4,285.720 $21,800.000 $4,716.250 $21,900.000
LCS SIGNAL UNIT
EA 4.000 $11,200.000 $9,000.000 $9,000.000 $9,000.000 $5,376.820 $9,000.000 $9,000.000 $4,285.720 $9,000.000 $4,716.250 $9,050.000
Totals: $22,086,313.820 $20,514,949.470 $21,170,575.187 $21,382,405.653 $21,457,748.770 $21,593,000.000 $22,048,796.320 $23,449,308.850 $23,994,404.470 $24,269,127.872 $25,118,729.980