TARRANT FM 730 (0312-05-031)

Items: 66

County: TARRANT
Length: N/A
Highway: FM 730
District: FORT WORTH
Control Number: 0312-05-031
DBE Goal: N/A
Project: F 2B23(137)
Guaranty: N/A
Time: 149 WORKING DAYS
Engineer's Estimate: $7,093,553.75
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$7,093,553.75
$5,888,715.63
Over/Under Est: -16.98% -$1,204,838.12
Over/Under Est: -10.89% -$772,482.40
Amt Left: 7.34% $432,355.72
Over/Under Est: -8.8% -$623,940.68
Amt Left: 9.86% $580,897.44
Delta: -2.35% -$148,541.72
Over/Under Est: -7.15% -$507,404.55
Amt Left: 11.84% $697,433.57
Delta: -1.80% -$116,536.13
Over/Under Est: 0.33% $23,635.36
Amt Left: 20.86% $1,228,473.48
Delta: -8.06% -$531,039.91
$7,502,596.00
Over/Under Est: 5.77% $409,042.25
Amt Left: 27.41% $1,613,880.37
Delta: -5.42% -$385,406.89
Subcontractor Percentage Amount
TEX OP CONSTRUCTION, LP 7.07% $416,332.20
KING GEORGE TRAFFIC SOLUTIONS LLC 4.08% $240,259.60
BRENDA PRICE TRUCKING 3.36% $197,860.85
DIIBS SPECIALISTS, LLC 2.11% $124,251.90
FC TRAFFIC CONTROL, INC. 2.01% $118,363.18
JR WEST TEXAS CONCRETE LLC 1.68% $98,930.42
MOBILE ENTERPRISES, INC. 0.31% $18,255.02
MARCOMS CONSTRUCTION LLC 0.19% $11,188.56
PROFESSIONAL TRAFFIC CONTROL LLC 0.14% $8,244.20
Total: 20.95% $1,233,685.93

Bid Items & Bid Tabulations

66 Total 0 of 66
TARRANT  |  FM 730  |  FORT WORTH  |  0312-05-031  |  08/02/2023  |  $7,093,553.75  |  F 2B23(137)  |  RESURF ROADWAY  |  149 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
FOUTSCO PAVING COMPANY, LLC
PEACHTREE CONSTRUCTION, LTD.
AUSTIN BRIDGE & ROAD SERVICES, LP
EUROVIA ATLANTIC COAST LLC
FNH CONSTRUCTION, LLC
BACKFILL (TY A)
STA 42.000 $150.000 $220.000 $100.000 $350.000 $636.930 $715.000 $450.000
FLEX PAVE STRUCTURE REPAIR (8"-10")
SY 4,973.000 $125.000 $79.000 $100.000 $103.000 $118.990 $104.500 $130.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 217,158.000 $2.200 $3.100 $1.000 $2.800 $2.000 $3.500 $5.000
PLAN & TEXT CONC PAV(0" TO 1/2")
SY 447.000 $5.000 $8.200 $7.000 $26.500 $8.920 $13.000 $20.000
RIPRAP (MOW STRIP)(4 IN)
CY 93.000 $706.000 $1,200.000 $1,000.000 $825.000 $787.810 $950.000 $650.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 89.000 $55.000 $61.000 $90.000 $85.000 $50.000 $50.000 $100.000
RESIZING AND SEALING JOINTS
LF 76.000 $75.000 $59.000 $90.000 $92.000 $48.000 $48.000 $300.000
RETROFIT RAIL (TY T131RC)
LF 224.000 $230.000 $290.000 $200.000 $215.000 $200.000 $200.000 $185.000
HEADER TYPE EXPANSION JOINT
CF 22.000 $200.000 $590.000 $800.000 $810.000 $480.000 $480.000 $850.000
CLEAN EXIST CULVERTS
EA 12.000 $2,700.000 $1,000.000 $1,500.000 $2,500.000 $3,000.000 $3,000.000 $500.000
MOBILIZATION
LS 1.000 $645,000.000 $400,000.000 $640,000.000 $550,000.000 $658,614.920 $430,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $15,000.000 $25,000.000 $7,500.000 $37,171.430 $65,000.000 $8,500.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,140.000 $1.500 $2.000 $1.000 $2.500 $2.250 $5.000 $9.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 1,140.000 $6.700 $4.000 $1.000 $5.500 $4.950 $11.000 $18.000
RUMBLE STRIPS (SHOULDER)
LF 36,392.000 $0.250 $0.170 $0.150 $0.500 $0.060 $0.350 $0.500
RUMBLE STRIPS (CENTERLINE)
LF 18,198.000 $0.600 $0.170 $0.150 $0.500 $0.060 $0.350 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 975.000 $30.000 $25.750 $20.000 $22.500 $21.000 $21.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,836.000 $2,200.000 $2,000.000 $1,950.000 $3,201.340 $1,775.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,200.000 $1,200.000 $1,000.000 $1,100.000 $1,000.000 $1,000.000 $1,850.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $60.000 $100.000 $85.000 $95.000 $85.000 $85.000 $50.000
REMOVE METAL BEAM GUARD FENCE
LF 700.000 $3.200 $4.600 $4.000 $4.250 $3.750 $3.750 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $200.000 $410.000 $250.000 $400.000 $180.000 $250.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,200.000 $3,400.000 $2,500.000 $3,050.000 $2,775.000 $2,775.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $315.000 $370.000 $300.000 $325.000 $300.000 $300.000 $1,500.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 309.000 $50.000 $33.500 $30.000 $30.000 $27.500 $27.500 $35.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,230.000 $790.000 $650.000 $710.000 $650.000 $650.000 $1,150.000
REMOVE SM RD SN SUP&AM
EA 1.000 $120.000 $98.000 $80.000 $87.000 $80.000 $80.000 $150.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 21.000 $80.000 $61.000 $50.000 $53.000 $50.000 $50.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 32.000 $23.000 $24.500 $18.000 $21.000 $20.000 $20.000 $100.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 32.000 $22.000 $24.500 $18.000 $21.000 $20.000 $20.000 $100.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 14.000 $60.000 $92.000 $75.000 $82.000 $75.000 $25.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 14.000 $42.000 $30.500 $28.000 $27.000 $20.000 $25.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $41.000 $30.500 $28.000 $27.000 $20.000 $75.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 5,720.000 $0.500 $0.700 $0.500 $0.600 $1.000 $0.600 $6.000
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 133.000 $2.000 $0.700 $1.000 $0.600 $2.000 $1.700 $6.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,597.000 $1.050 $0.850 $0.100 $0.750 $1.000 $0.850 $6.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 2,078.000 $3.000 $3.400 $2.440 $2.900 $6.000 $5.000 $6.000
WK ZN PAV MRK NON-REMOV (W)18"(SLD)
LF 173.000 $4.000 $3.700 $4.000 $3.100 $8.000 $9.000 $12.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 875.000 $6.300 $4.600 $4.500 $3.900 $10.000 $10.000 $20.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 54.000 $90.000 $92.000 $55.000 $78.000 $150.000 $175.000 $250.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 36.000 $100.000 $98.000 $60.000 $84.000 $200.000 $225.000 $250.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 3,312.000 $0.500 $0.700 $0.750 $0.600 $1.000 $0.600 $6.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 74,008.000 $0.600 $0.700 $0.390 $0.600 $0.750 $0.600 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,093.000 $0.800 $2.700 $1.000 $2.000 $2.500 $1.250 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 4,694.000 $0.800 $2.700 $1.000 $2.000 $1.500 $1.250 $6.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 133.000 $1.500 $1.400 $1.150 $1.200 $2.000 $2.100 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,597.000 $1.300 $1.400 $0.840 $1.200 $1.200 $1.200 $6.000
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 173.000 $5.250 $7.300 $5.500 $6.500 $7.000 $9.000 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,257.000 $9.250 $9.200 $6.500 $8.000 $9.000 $10.000 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 54.000 $247.000 $180.000 $120.000 $155.000 $160.000 $175.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 36.000 $290.000 $200.000 $130.000 $170.000 $200.000 $225.000 $250.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 843.000 $9.000 $8.300 $6.500 $7.200 $9.000 $9.000 $20.000
PAVEMENT SEALER 6"
LF 5,916.000 $0.500 $0.400 $0.290 $0.320 $0.280 $1.000 $1.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 5,720.000 $0.600 $0.900 $0.890 $0.750 $0.770 $0.880 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 66,442.000 $0.700 $0.900 $0.600 $0.750 $0.710 $0.880 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 3,312.000 $0.600 $0.900 $0.610 $0.750 $0.770 $0.880 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 74,008.000 $0.700 $0.900 $0.600 $0.750 $1.500 $0.880 $1.000
REFL PAV MRKR TY I-C
EA 522.000 $5.500 $5.500 $3.550 $5.000 $5.000 $5.500 $6.000
REFL PAV MRKR TY II-A-A
EA 3,052.000 $4.000 $5.500 $3.490 $5.000 $5.000 $5.500 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 5,916.000 $0.250 $0.800 $0.990 $0.700 $0.550 $0.500 $1.000
PAV SURF PREP FOR MRK (6")
LF 5,916.000 $0.050 $0.230 $0.500 $0.200 $0.200 $0.200 $1.000
SP MIXES SP-C SAC-A PG70-28
TON 24,974.000 $180.000 $140.000 $170.000 $161.000 $158.000 $162.000 $150.000
TACK COAT
GAL 43,431.000 $3.500 $1.250 $0.100 $1.000 $0.150 $2.750 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $20,000.000 $20,000.000 $16,500.000 $5,683.130 $17,500.000 $16,500.000
TMA (STATIONARY)
DAY 180.000 $100.000 $300.000 $1.000 $150.000 $14.700 $335.000 $250.000
TMA (MOBILE OPERATION)
DAY 30.000 $200.000 $240.000 $1.000 $250.000 $18.300 $835.000 $550.000
Totals: $7,093,553.750 $5,888,715.630 $6,321,071.350 $6,469,613.070 $6,586,149.200 $7,117,189.110 $7,502,596.000