PREPARING ROW
|
STA
|
41.000
|
$5,454.250
|
$2,520.000
|
$750.000
|
$200.000
|
$5,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,256.000
|
$10.000
|
$14.000
|
$13.000
|
$27.500
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
941.000
|
$12.630
|
$10.500
|
$10.000
|
$7.700
|
$12.500
|
|
|
REMOVING CONC (FLUME)
|
SY
|
402.000
|
$12.230
|
$13.650
|
$12.000
|
$22.000
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
4,160.000
|
$10.000
|
$8.400
|
$5.000
|
$9.600
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,881.100
|
$10.000
|
$3.150
|
$12.000
|
$8.250
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
650.000
|
$12.000
|
$21.000
|
$25.000
|
$33.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
6,845.800
|
$11.300
|
$1.050
|
$7.000
|
$8.800
|
$30.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
3,142.000
|
$1.300
|
$3.150
|
$3.500
|
$1.650
|
$6.500
|
|
|
BLOCK SODDING
|
SY
|
1,715.000
|
$8.500
|
$6.300
|
$4.500
|
$4.290
|
$5.500
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
8,924.000
|
$0.750
|
$0.450
|
$0.440
|
$0.440
|
$0.500
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
5,586.000
|
$0.750
|
$0.450
|
$0.440
|
$0.440
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
677.900
|
$20.000
|
$26.000
|
$16.000
|
$48.400
|
$30.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
295.900
|
$55.920
|
$63.000
|
$54.000
|
$99.000
|
$60.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
101.600
|
$182.000
|
$180.000
|
$165.000
|
$176.000
|
$171.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
8,125.000
|
$5.000
|
$7.750
|
$2.500
|
$5.500
|
$3.500
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
2,145.800
|
$6.500
|
$7.350
|
$3.800
|
$7.150
|
$6.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
2,662.700
|
$75.000
|
$82.400
|
$85.000
|
$84.320
|
$78.000
|
|
|
D-GR HMA TY D PG 70-28(LATEX ADDITIVE)
|
TON
|
325.700
|
$100.000
|
$103.330
|
$108.000
|
$107.140
|
$120.000
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
1,825.000
|
$5.000
|
$8.400
|
$9.000
|
$9.600
|
$20.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
3,978.000
|
$100.000
|
$63.000
|
$58.000
|
$84.000
|
$50.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,000.000
|
$5.000
|
$0.250
|
$12.000
|
$2.200
|
$3.500
|
|
|
CL B CONC (FLUME)
|
CY
|
253.100
|
$445.950
|
$525.000
|
$550.000
|
$550.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
339.700
|
$408.930
|
$525.000
|
$550.000
|
$460.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
69.300
|
$550.000
|
$630.000
|
$550.000
|
$600.000
|
$500.000
|
|
|
RC PIPE (CL III)(21 IN)
|
LF
|
91.300
|
$61.430
|
$57.500
|
$51.000
|
$82.500
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
617.700
|
$65.440
|
$63.000
|
$59.000
|
$80.300
|
$85.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
290.500
|
$119.960
|
$144.000
|
$130.000
|
$170.500
|
$250.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$3,602.020
|
$4,200.000
|
$2,900.000
|
$9,900.000
|
$5,000.000
|
|
|
INLET (COMPL)(DROP)(TY 3)
|
EA
|
2.000
|
$3,145.270
|
$6,300.000
|
$4,000.000
|
$5,500.000
|
$5,000.000
|
|
|
SET (TY II) (21 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$1,260.000
|
$1,100.000
|
$2,200.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,039.020
|
$1,470.000
|
$1,100.000
|
$2,750.000
|
$2,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$5,000.000
|
$5,250.000
|
$2,900.000
|
$12,100.000
|
$5,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$1,181.330
|
$525.000
|
$1,200.000
|
$2,750.000
|
$2,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,440.250
|
$1,155.000
|
$1,600.000
|
$2,750.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
554.000
|
$23.250
|
$17.850
|
$15.000
|
$12.100
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$196,874.000
|
$179,000.000
|
$180,000.000
|
$191,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$7,483.140
|
$15,750.000
|
$15,000.000
|
$6,800.000
|
$8,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
160.000
|
$20.000
|
$21.000
|
$12.500
|
$31.900
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
160.000
|
$8.500
|
$10.500
|
$6.000
|
$15.400
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,032.000
|
$2.480
|
$2.000
|
$2.750
|
$3.270
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,032.000
|
$1.000
|
$0.550
|
$1.000
|
$1.100
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
120.000
|
$4.560
|
$7.350
|
$4.000
|
$7.700
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
120.000
|
$1.000
|
$1.100
|
$1.000
|
$1.870
|
$8.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
3,300.000
|
$12.580
|
$5.250
|
$9.500
|
$12.000
|
$20.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
2,190.000
|
$7.230
|
$5.250
|
$12.500
|
$17.500
|
$30.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$10.160
|
$21.000
|
$12.000
|
$17.500
|
$30.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,380.000
|
$6.390
|
$5.250
|
$8.000
|
$11.500
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,740.000
|
$4.460
|
$5.250
|
$8.000
|
$17.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$7.620
|
$21.000
|
$15.000
|
$17.000
|
$20.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
3,300.000
|
$10.520
|
$5.250
|
$8.000
|
$12.000
|
$20.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
2,190.000
|
$6.000
|
$5.250
|
$8.000
|
$17.500
|
$20.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$8.740
|
$21.000
|
$15.000
|
$17.500
|
$20.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
176.500
|
$10.000
|
$21.000
|
$9.000
|
$7.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,186.000
|
$30.000
|
$21.180
|
$24.000
|
$20.630
|
$25.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,500.000
|
$892.500
|
$1,200.000
|
$990.000
|
$1,850.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,500.000
|
$2,231.250
|
$3,000.000
|
$2,183.500
|
$2,850.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$20,140.000
|
$16,800.000
|
$23,000.000
|
$15,345.000
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,650.000
|
$1,500.000
|
$3,000.000
|
$1,980.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$729.600
|
$750.000
|
$2,500.000
|
$880.000
|
$2,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$480.570
|
$572.250
|
$610.000
|
$600.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
7.000
|
$476.470
|
$341.250
|
$370.000
|
$358.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$76.910
|
$105.000
|
$150.000
|
$125.000
|
$50.000
|
|
|
RELOCATE LRSA
|
EA
|
3.000
|
$6,360.380
|
$3,675.000
|
$4,000.000
|
$3,850.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BR)
|
EA
|
19.000
|
$76.300
|
$47.250
|
$50.000
|
$50.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND(BR)
|
EA
|
36.000
|
$87.000
|
$50.400
|
$54.000
|
$50.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
20.000
|
$75.000
|
$52.500
|
$56.000
|
$50.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,016.000
|
$0.600
|
$0.680
|
$0.720
|
$1.100
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,863.000
|
$0.620
|
$0.680
|
$0.720
|
$1.100
|
$0.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$150.000
|
$122.850
|
$129.000
|
$170.500
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$200.000
|
$137.550
|
$145.000
|
$192.500
|
$250.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
1.000
|
$500.000
|
$577.500
|
$620.000
|
$1,100.000
|
$250.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
17,665.000
|
$0.100
|
$0.040
|
$0.040
|
$0.170
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
501.000
|
$0.430
|
$0.070
|
$0.080
|
$0.550
|
$0.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
8.000
|
$33.600
|
$26.250
|
$27.500
|
$27.780
|
$250.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$43.850
|
$31.500
|
$33.000
|
$49.780
|
$250.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
92.000
|
$7.500
|
$3.150
|
$3.300
|
$5.500
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,196.000
|
$1.000
|
$1.050
|
$1.100
|
$1.100
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
17,665.000
|
$0.250
|
$0.260
|
$0.280
|
$0.070
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
501.000
|
$0.700
|
$0.530
|
$0.550
|
$0.280
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
8.000
|
$19.190
|
$15.750
|
$16.500
|
$27.500
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$26.500
|
$21.000
|
$22.000
|
$38.500
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
110.000
|
$120.000
|
$189.000
|
$94.000
|
$100.000
|
$100.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
3,075.000
|
$1.000
|
$1.050
|
$1.100
|
$1.100
|
$0.500
|
|
MULTIPOLYMER PAV MRK (W)(4")(BRK)
|
LF
|
7,148.000
|
$1.060
|
$1.050
|
$1.100
|
$1.100
|
$0.500
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
501.000
|
$2.500
|
$2.100
|
$2.200
|
$2.200
|
$0.500
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
7,442.000
|
$1.000
|
$1.050
|
$1.100
|
$1.100
|
$0.500
|
|
Totals: |
$2,162,474.411
|
$1,869,823.096
|
$1,872,864.650
|
$2,096,384.317
|
$2,543,116.500
|