TARRANT US 287 (0172-06-107)

Items: 49

County: TARRANT
Length: 0.0000 MILES
Highway: US 287
District: FORT WORTH
Control Number: 0172-06-107
DBE Goal: 3.0%
Project: STP 2025(941)HES
Guaranty: $33,000.00
Time: 117 WORKING DAYS
Engineer's Estimate: $1,635,483.90
Date: 08/08/2025 (10 months ago)
Contract Number: 8253216
Type: INSTALL INTELLIGENT VEHICLE HIGHWAY SYSTEM
Project ID: A00192267
Contract Type: Federal
Project Description: INSTALLATION OF WRONG WAY DRIVING DETECTION EQUIPMENT, LED FLASHING SIGNS, PAVEMENT MARKINGS, AND COMMUNICATION EQUIPMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
THERESA POER
CARLOS MOLINA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,635,483.90
$1,430,726.80
Over/Under Est: -12.52% -$204,757.10
Over/Under Est: -5.96% -$97,483.90
Amt Left: 7.5% $107,273.20
$1,626,005.10
Over/Under Est: -0.58% -$9,478.80
Amt Left: 13.65% $195,278.30
Delta: -5.72% -$88,005.10
Over/Under Est: -0.57% -$9,365.26
Amt Left: 13.66% $195,391.84
Delta: -0.01% -$113.54
$1,663,240.20
Over/Under Est: 1.7% $27,756.30
Amt Left: 16.25% $232,513.40
Delta: -2.28% -$37,121.56
Subcontractor Percentage Amount
FIBERTEL, LLC 4.43% $63,381.20
BUYERS BARRICADES, INC. 2.51% $35,911.24
TRP CONSTRUCTION GROUP, LLC 0.85% $12,161.18
BUYERS BARRICADES AUSTIN, LLC 0.00% $0.00
Total: 7.79% $111,453.62

Bid Items & Bid Tabulations

49 Total 0 of 49
TARRANT  |  US 287  |  FORT WORTH  |  0172-06-107  |  08/08/2025  |  $1,635,483.90  |  STP 2025(941)HES  |  INSTL INTELLIGENT VEHICLE HWY SYSTEM  |  117 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LIGHT IT UP ELECTRIC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
SICE, INC.
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC
MICA CORPORATION
REMOV CONC (RIPRAP)
CY 2.000 $370.000 $200.000 $3,636.000 $1,479.767 $1,125.950 $1,160.000
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 1,009.000 $2.000 $3.000 $10.150 $3.360 $5.330 $7.600
HYDRO MULCH SEED (TEMP_COOL)
SY 1,009.000 $2.000 $3.000 $8.850 $3.360 $5.330 $6.600
VEGETATIVE WATERING
TGL 36.000 $300.000 $35.000 $310.000 $31.901 $66.670 $338.000
DRILL SHAFT (48 IN)
LF 21.000 $560.000 $675.000 $1,100.000 $835.383 $609.340 $600.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 156.000 $435.000 $260.000 $772.000 $206.613 $250.010 $309.000
RIPRAP (CONC)(5 IN)
CY 2.000 $1,040.000 $1,200.000 $4,372.000 $1,636.067 $1,333.300 $3,295.000
RIPRAP (CONC)(CL A)
CY 1.250 $2,000.000 $1,000.000 $6,115.000 $1,251.280 $1,333.300 $2,350.000
MOBILIZATION
LS 1.000 $150,000.000 $150,000.000 $153,500.000 $125,734.533 $158,746.910 $156,900.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $12,000.000 $10,000.000 $4,416.000 $7,519.810 $34,892.750 $25,925.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 52.000 $160.000 $85.000 $205.000 $229.504 $105.410 $231.000
TMA (STATIONARY)
DAY 49.000 $330.000 $300.000 $205.000 $569.663 $365.720 $231.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 325.000 $11.400 $9.000 $31.650 $6.462 $14.670 $23.650
BIODEG EROSN CONT LOGS (REMOVE)
LF 325.000 $5.000 $1.500 $14.750 $1.293 $4.110 $11.000
CONDT (PVC) (SCH 40) (2")
LF 380.000 $25.000 $25.000 $16.350 $12.897 $31.250 $26.850
CONDT (PVC) (SCH 40) (3")
LF 8,811.000 $29.000 $27.000 $18.750 $14.913 $13.710 $15.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,436.000 $42.000 $33.000 $61.600 $21.530 $27.360 $43.650
CONDUIT (PREPARE)
LF 875.000 $5.600 $2.000 $5.050 $6.371 $2.670 $4.750
ELEC CONDR (NO.8) BARE
LF 11,100.000 $3.100 $1.600 $1.900 $1.275 $2.400 $2.050
ELEC CONDR (NO.8) INSULATED
LF 11,186.000 $3.100 $1.800 $2.500 $1.630 $2.550 $2.400
ELEC CONDR (NO.4) BARE
LF 2,010.000 $3.800 $2.600 $2.850 $2.862 $4.830 $2.850
ELEC CONDR (NO.4) INSULATED
LF 4,110.000 $4.100 $3.000 $3.850 $3.497 $4.720 $3.500
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 29.000 $5,760.000 $5,200.000 $5,805.000 $6,582.504 $6,439.680 $4,325.000
GROUND BOX TY D (162922)W/APRON
EA 10.000 $2,640.000 $1,800.000 $2,110.000 $1,962.636 $1,530.740 $2,225.000
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 7.000 $9,385.000 $10,000.000 $8,130.000 $12,989.987 $10,492.000 $11,820.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 3.000 $9,475.000 $8,500.000 $9,353.000 $5,095.774 $9,153.370 $8,685.000
ALUMINUM SIGNS (TY A)
SF 16.000 $100.000 $50.000 $35.100 $46.220 $124.200 $26.150
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 17.500 $250.000 $55.000 $64.300 $46.220 $115.370 $42.950
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $1,655.000 $850.000 $1,445.000 $1,899.973 $2,105.550 $1,110.000
REMOVE SM RD SN SUP&AM
EA 15.000 $240.000 $125.000 $244.000 $127.604 $411.280 $465.000
REFL PAV MRKR TY II-C-R
EA 910.000 $19.000 $6.000 $11.000 $9.693 $11.350 $47.500
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $100.000 $800.000 $220.650 $193.841 $200.000 $220.000
PAV SURF PREP FOR MRK (RPM)
EA 910.000 $11.000 $2.000 $1.500 $1.293 $2.680 $2.200
INSTALL CIRCUIT BREAKER
EA 2.000 $300.000 $800.000 $928.000 $876.031 $683.290 $245.000
ITS RVSD (DATA COLLECT & WWA) SYS
EA 1.000 $21,720.000 $30,000.000 $25,790.000 $13,690.645 $18,500.870 $19,400.000
ITS POLE (60 FT)(90 MPH)
EA 1.000 $23,600.000 $29,587.000 $33,000.000 $30,404.121 $31,773.340 $25,475.000
ITS POLE MNT CAB (TY 3)(CONF 2)
EA 1.000 $8,700.000 $7,300.000 $7,600.000 $8,176.262 $11,286.120 $8,105.000
GROUND BOX (PREPARE)
EA 10.000 $705.000 $600.000 $375.000 $328.250 $806.270 $865.000
ITS RADIO(SNGL)(5 GHZ)-I-U
EA 14.000 $8,090.000 $6,625.000 $5,728.000 $9,304.222 $7,884.600 $8,285.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $9,370.000 $9,775.000 $8,210.000 $10,036.382 $12,617.820 $10,500.000
CCTV MOUNT (POLE)
EA 1.000 $670.000 $600.000 $550.000 $1,000.620 $338.980 $1,160.000
FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER)
LF 7,996.000 $5.300 $5.000 $15.400 $5.661 $4.870 $8.170
FIBER OPTIC FUSION SPLICE
EA 168.000 $100.000 $125.000 $85.000 $64.614 $59.450 $73.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 12.000 $2,675.000 $1,700.000 $977.000 $3,191.909 $2,702.990 $2,160.000
FO CBL (12 SMF)(PIGTAIL)
LF 1,185.000 $4.500 $10.000 $4.350 $5.247 $5.200 $21.550
PRETERM FIBER PATCH PANEL (12 POSITION)
EA 14.000 $2,760.000 $1,800.000 $2,110.000 $3,230.677 $2,795.490 $1,890.000
INSTALL WRONG WAY DRIVER DETECTION SYS
EA 13.000 $9,800.000 $11,500.000 $5,335.000 $31,879.333 $15,496.680 $16,180.000
INSTALLATION OF ETHERNET SWITCH
EA 14.000 $2,800.000 $1,500.000 $1,300.000 $358.463 $1,077.890 $1,725.000
INSTALLATION OF SERIAL SERVER UNIT
EA 1.000 $1,760.000 $2,000.000 $162.000 $440.530 $1,077.890 $1,320.000
Totals: $1,635,483.900 $1,430,726.800 $1,538,000.000 $1,626,005.083 $1,626,118.630 $1,663,240.195
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $45,000.00
MATERIAL FURNISHED BY THE STATE (PART) $741,100.00
Total: $811,100.00