Show Job Controls
Bid Cobra

TARRANT US 287 (0172-06-099)

Items: 92

County: TARRANT
Length: N/A
Highway: US 287
District: FORT WORTH
Control Number: 0172-06-099
DBE Goal: 0.0%
Project: C 172-6-99
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $16,768,998.65
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
MARIBEL RANGEL
CYNTHIA DELAGARZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$16,768,998.65
$19,292,920.92
Over/Under Est: 15.05% $2,523,922.27
$19,303,449.10
Over/Under Est: 15.11% $2,534,450.45
Amt Left: 0.05% $10,528.18
Over/Under Est: 29.85% $5,005,961.19
Amt Left: 12.87% $2,482,038.92
Delta: -12.80% -$2,471,510.74
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 14.42% $2,908,327.78
IBCTX, LLC 5.98% $1,206,088.77
STRAIGHT LINE SAWING & SEALING, INC. 5.36% $1,081,042.78
FORTSON CONTRACTING, INC. 4.58% $923,726.85
ACT SAW CUTTING & REMOVAL 1.06% $213,788.31
LINEAR TRAFFIC MARKINGS LLC 0.86% $173,450.89
S & S BRIDGE PAINTING, INC. 0.76% $153,282.19
AWP SAFETY 0.54% $108,911.03
MICA CORPORATION 0.20% $40,337.42
WEST TEXAS ROCK RESOURCES, LLC 0.19% $38,320.55
KITCHING & CO., LLC 0.15% $30,253.06
GIBSON & ASSOCIATES, INC. 0.12% $24,202.45
MAR-ZAP CONSTRUCTION, LLC 0.09% $18,151.84
SUPERIOR TRAFFIC CONTROL, LLC 0.05% $10,084.35
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.04% $8,067.48
Total: 34.40% $6,938,035.75

Bid Items & Bid Tabulations

92 Total 0 of 92
TARRANT  |  US 287  |  FORT WORTH  |  0172-06-099  |  03/05/2024  |  $16,768,998.65  |  C 172-6-99  |  RESURF ROADWAY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
FNH CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (RIPRAP)
SY 530.000 $35.000 $10.000 $100.000 $45.000
REMOVING CONC (MEDIANS)
SY 93.000 $65.000 $20.000 $50.000 $80.000
REMOVING CONC (CURB)
LF 1,442.000 $15.000 $7.000 $20.000 $14.000
REMOVING CONCRETE(MOW STRIP)
LF 2,887.500 $13.000 $10.000 $50.000 $14.000
REMOVING STAB BASE & ASPH PAV (9")
SY 78.000 $18.000 $25.000 $20.000 $30.000
PLAN & TEXT CONC PAV(0" TO 1/2")
SY 23,134.000 $5.000 $1.000 $2.000 $3.650
PLANE ASPH CONC PAV(0" TO 2")
SY 29,834.000 $3.000 $1.500 $6.000 $3.750
PLANE ASPH CONC PAV (2")
SY 350,311.000 $3.000 $2.000 $3.500 $3.900
FULL - DEPTH REPAIR CRCP (8")
SY 1,500.000 $320.000 $500.000 $350.000 $470.000
CL C CONC (RAIL FOUNDATION)
CY 830.000 $750.000 $600.000 $950.000 $855.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 25,940.000 $16.000 $6.000 $10.000 $7.250
RIPRAP (CONC)(5 IN)
CY 97.000 $660.000 $700.000 $550.000 $700.000
RIPRAP (CONC)(CL C)
CY 853.000 $600.000 $750.000 $550.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 594.000 $625.000 $1,000.000 $500.000 $750.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 2,657.000 $50.000 $62.000 $90.000 $67.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,424.000 $50.000 $64.000 $90.000 $62.000
RESIZING AND SEALING JOINTS
LF 1,791.000 $80.000 $68.000 $100.000 $84.000
RAIL (TY T551)
LF 5,270.000 $160.000 $175.000 $185.000 $145.000
RAIL (TY SSTR)
LF 2,616.000 $130.000 $150.000 $200.000 $145.000
MOBILIZATION
LS 1.000 $1,500,000.000 $1,926,000.000 $1,900,000.000 $2,100,651.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $17,500.000 $100,000.000 $12,500.000 $127,165.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,584.000 $12.000 $1.000 $18.000 $5.650
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,584.000 $5.000 $1.000 $9.000 $1.150
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 8,400.000 $80.000 $90.000 $90.000 $105.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 7,830.000 $15.000 $20.000 $30.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 8,400.000 $10.000 $24.000 $30.000 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 240.000 $16.000 $24.000 $30.000 $62.000
CONC CURB (TY II)
LF 1,442.000 $50.000 $30.000 $45.000 $50.000
CONC CURB & GUTTER (TY II)
LF 353.000 $60.000 $53.000 $55.000 $74.000
RUMBLE STRIPS (SHOULDER)
LF 125,295.000 $0.250 $0.250 $0.500 $0.390
CONC MEDIAN
SY 93.000 $225.000 $125.000 $150.000 $185.000
MTL W-BEAM GD FEN (TIM POST)
LF 11,705.500 $25.000 $22.000 $28.000 $28.000
TERMINAL ANCHOR SECTION
EA 20.000 $500.000 $1,150.000 $1,850.000 $1,500.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $2,000.000 $2,240.000 $1,850.000 $2,850.000
REMOVE METAL BEAM GUARD FENCE
LF 21,100.000 $3.000 $2.000 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 32.000 $270.000 $150.000 $500.000 $160.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 14.000 $300.000 $150.000 $1,000.000 $160.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $325.000 $200.000 $500.000 $320.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $3,100.000 $2,750.000 $3,250.000 $3,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $325.000 $300.000 $1,500.000 $350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 20.000 $1,500.000 $1,600.000 $6,500.000 $3,200.000
CRASH CUSH ATTEN (REMOVE)
EA 13.000 $1,000.000 $700.000 $3,000.000 $1,900.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 18.000 $25,000.000 $27,000.000 $21,000.000 $33,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $12,000.000 $49,000.000 $30,000.000 $44,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 12.000 $12,000.000 $7,500.000 $21,000.000 $11,500.000
CHAIN LINK FENCE (REMOVE)
LF 5,915.000 $9.000 $8.500 $20.000 $12.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $800.000 $625.000 $1,500.000 $810.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 47.000 $800.000 $725.000 $1,500.000 $1,032.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 25.000 $1,000.000 $1,000.000 $1,500.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $1,000.000 $690.000 $1,500.000 $711.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $1,000.000 $790.000 $1,500.000 $1,091.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 3.000 $1,000.000 $1,100.000 $1,500.000 $1,081.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 17.000 $1,100.000 $800.000 $1,500.000 $1,276.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,100.000 $1,100.000 $1,500.000 $1,432.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 2.000 $1,100.000 $900.000 $1,500.000 $1,340.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 6.000 $3,500.000 $500.000 $5,000.000 $7,150.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $4,000.000 $500.000 $5,000.000 $8,000.000
REMOVE SM RD SN SUP&AM
EA 120.000 $150.000 $105.000 $100.000 $127.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 65.000 $26.000 $20.000 $100.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 48.000 $26.000 $20.000 $100.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 9.000 $26.000 $20.500 $100.000 $26.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 38.000 $26.000 $25.000 $100.000 $32.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 105.000 $26.000 $25.000 $100.000 $32.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 20.000 $80.000 $45.000 $100.000 $58.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 26,053.000 $0.500 $0.300 $1.000 $4.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 62,563.000 $0.600 $0.300 $1.000 $4.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 11,446.000 $0.750 $0.500 $1.000 $5.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 5,017.000 $2.500 $1.000 $1.000 $9.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 62,732.000 $0.600 $0.300 $1.000 $4.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,666.000 $1.250 $0.700 $1.500 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 11,446.000 $0.700 $0.840 $2.000 $5.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 5,017.000 $2.000 $2.550 $2.000 $9.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 56.000 $4.000 $13.000 $20.000 $15.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 11.000 $100.000 $130.000 $250.000 $255.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 9.000 $110.000 $149.000 $250.000 $300.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 26,053.000 $0.400 $0.560 $1.500 $4.150
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 62,563.000 $0.600 $0.560 $1.500 $4.150
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 62,732.000 $0.600 $0.560 $1.500 $4.150
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 428.000 $2.000 $2.750 $2.000 $15.000
REFL PAV MRKR TY II-C-R
EA 2,369.000 $5.000 $3.600 $6.000 $9.000
FULL - WIDTH MOWING
CYC 2.000 $5,000.000 $10,000.000 $5,000.000 $3,100.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 4.934 $500.000 $2,500.000 $6,500.000 $3,595.000
LITTER REMOVAL
CYC 2.000 $10,000.000 $4,000.000 $5,000.000 $2,600.000
CLEANING / SWEEPING (SPOT)
MI 4.934 $1,000.000 $5,000.000 $650.000 $365.000
TREE TRIMMING / BRUSH REMOVAL
MI 4.934 $3,000.000 $7,000.000 $10,000.000 $5,200.000
DRAIN INLET CLEANING
EA 212.000 $130.000 $1,000.000 $500.000 $1,100.000
BRIDGE JOINT REPAIR (SEJ)
LF 665.000 $400.000 $1,000.000 $500.000 $253.000
SP MIXES SP-C SAC-A PG70-28
TON 40,288.000 $160.000 $189.500 $160.000 $180.000
TACK COAT
GAL 70,063.000 $5.000 $0.100 $6.000 $4.150
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $60,000.000 $20,000.000 $17,000.000
TMA (STATIONARY)
DAY 98.000 $300.000 $500.000 $250.000 $1,130.000
CURB INLET SEDIMENT PROTECTION
LF 1,445.000 $4.500 $10.000 $25.000 $22.000
Totals: $16,768,998.650 $19,292,920.920 $19,303,449.100 $21,774,959.840