REMOVING CONC (RIPRAP)
|
SY
|
530.000
|
$35.000
|
$10.000
|
$100.000
|
$45.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
93.000
|
$65.000
|
$20.000
|
$50.000
|
$80.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,442.000
|
$15.000
|
$7.000
|
$20.000
|
$14.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,887.500
|
$13.000
|
$10.000
|
$50.000
|
$14.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
78.000
|
$18.000
|
$25.000
|
$20.000
|
$30.000
|
|
|
PLAN & TEXT CONC PAV(0" TO 1/2")
|
SY
|
23,134.000
|
$5.000
|
$1.000
|
$2.000
|
$3.650
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
29,834.000
|
$3.000
|
$1.500
|
$6.000
|
$3.750
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
350,311.000
|
$3.000
|
$2.000
|
$3.500
|
$3.900
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
1,500.000
|
$320.000
|
$500.000
|
$350.000
|
$470.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
830.000
|
$750.000
|
$600.000
|
$950.000
|
$855.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
25,940.000
|
$16.000
|
$6.000
|
$10.000
|
$7.250
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
97.000
|
$660.000
|
$700.000
|
$550.000
|
$700.000
|
|
|
RIPRAP (CONC)(CL C)
|
CY
|
853.000
|
$600.000
|
$750.000
|
$550.000
|
$700.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
594.000
|
$625.000
|
$1,000.000
|
$500.000
|
$750.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
2,657.000
|
$50.000
|
$62.000
|
$90.000
|
$67.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
1,424.000
|
$50.000
|
$64.000
|
$90.000
|
$62.000
|
|
|
RESIZING AND SEALING JOINTS
|
LF
|
1,791.000
|
$80.000
|
$68.000
|
$100.000
|
$84.000
|
|
|
RAIL (TY T551)
|
LF
|
5,270.000
|
$160.000
|
$175.000
|
$185.000
|
$145.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,616.000
|
$130.000
|
$150.000
|
$200.000
|
$145.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,500,000.000
|
$1,926,000.000
|
$1,900,000.000
|
$2,100,651.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$17,500.000
|
$100,000.000
|
$12,500.000
|
$127,165.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,584.000
|
$12.000
|
$1.000
|
$18.000
|
$5.650
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,584.000
|
$5.000
|
$1.000
|
$9.000
|
$1.150
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
8,400.000
|
$80.000
|
$90.000
|
$90.000
|
$105.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
7,830.000
|
$15.000
|
$20.000
|
$30.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
8,400.000
|
$10.000
|
$24.000
|
$30.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$16.000
|
$24.000
|
$30.000
|
$62.000
|
|
|
CONC CURB (TY II)
|
LF
|
1,442.000
|
$50.000
|
$30.000
|
$45.000
|
$50.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
353.000
|
$60.000
|
$53.000
|
$55.000
|
$74.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
125,295.000
|
$0.250
|
$0.250
|
$0.500
|
$0.390
|
|
|
CONC MEDIAN
|
SY
|
93.000
|
$225.000
|
$125.000
|
$150.000
|
$185.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
11,705.500
|
$25.000
|
$22.000
|
$28.000
|
$28.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
20.000
|
$500.000
|
$1,150.000
|
$1,850.000
|
$1,500.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$2,000.000
|
$2,240.000
|
$1,850.000
|
$2,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
21,100.000
|
$3.000
|
$2.000
|
$3.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
32.000
|
$270.000
|
$150.000
|
$500.000
|
$160.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
14.000
|
$300.000
|
$150.000
|
$1,000.000
|
$160.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$325.000
|
$200.000
|
$500.000
|
$320.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
22.000
|
$3,100.000
|
$2,750.000
|
$3,250.000
|
$3,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
24.000
|
$325.000
|
$300.000
|
$1,500.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
20.000
|
$1,500.000
|
$1,600.000
|
$6,500.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
13.000
|
$1,000.000
|
$700.000
|
$3,000.000
|
$1,900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
18.000
|
$25,000.000
|
$27,000.000
|
$21,000.000
|
$33,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$12,000.000
|
$49,000.000
|
$30,000.000
|
$44,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
12.000
|
$12,000.000
|
$7,500.000
|
$21,000.000
|
$11,500.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
5,915.000
|
$9.000
|
$8.500
|
$20.000
|
$12.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$800.000
|
$625.000
|
$1,500.000
|
$810.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
47.000
|
$800.000
|
$725.000
|
$1,500.000
|
$1,032.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
25.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$1,000.000
|
$690.000
|
$1,500.000
|
$711.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
4.000
|
$1,000.000
|
$790.000
|
$1,500.000
|
$1,091.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
3.000
|
$1,000.000
|
$1,100.000
|
$1,500.000
|
$1,081.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
17.000
|
$1,100.000
|
$800.000
|
$1,500.000
|
$1,276.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,100.000
|
$1,100.000
|
$1,500.000
|
$1,432.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
2.000
|
$1,100.000
|
$900.000
|
$1,500.000
|
$1,340.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
6.000
|
$3,500.000
|
$500.000
|
$5,000.000
|
$7,150.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$4,000.000
|
$500.000
|
$5,000.000
|
$8,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
120.000
|
$150.000
|
$105.000
|
$100.000
|
$127.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
65.000
|
$26.000
|
$20.000
|
$100.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
48.000
|
$26.000
|
$20.000
|
$100.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
9.000
|
$26.000
|
$20.500
|
$100.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
38.000
|
$26.000
|
$25.000
|
$100.000
|
$32.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
105.000
|
$26.000
|
$25.000
|
$100.000
|
$32.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
20.000
|
$80.000
|
$45.000
|
$100.000
|
$58.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
26,053.000
|
$0.500
|
$0.300
|
$1.000
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
62,563.000
|
$0.600
|
$0.300
|
$1.000
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
11,446.000
|
$0.750
|
$0.500
|
$1.000
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
5,017.000
|
$2.500
|
$1.000
|
$1.000
|
$9.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
62,732.000
|
$0.600
|
$0.300
|
$1.000
|
$4.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,666.000
|
$1.250
|
$0.700
|
$1.500
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
11,446.000
|
$0.700
|
$0.840
|
$2.000
|
$5.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
5,017.000
|
$2.000
|
$2.550
|
$2.000
|
$9.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
56.000
|
$4.000
|
$13.000
|
$20.000
|
$15.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
11.000
|
$100.000
|
$130.000
|
$250.000
|
$255.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
9.000
|
$110.000
|
$149.000
|
$250.000
|
$300.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
26,053.000
|
$0.400
|
$0.560
|
$1.500
|
$4.150
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
62,563.000
|
$0.600
|
$0.560
|
$1.500
|
$4.150
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
62,732.000
|
$0.600
|
$0.560
|
$1.500
|
$4.150
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
428.000
|
$2.000
|
$2.750
|
$2.000
|
$15.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,369.000
|
$5.000
|
$3.600
|
$6.000
|
$9.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$5,000.000
|
$10,000.000
|
$5,000.000
|
$3,100.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
4.934
|
$500.000
|
$2,500.000
|
$6,500.000
|
$3,595.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$10,000.000
|
$4,000.000
|
$5,000.000
|
$2,600.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
4.934
|
$1,000.000
|
$5,000.000
|
$650.000
|
$365.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
4.934
|
$3,000.000
|
$7,000.000
|
$10,000.000
|
$5,200.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
212.000
|
$130.000
|
$1,000.000
|
$500.000
|
$1,100.000
|
|
|
BRIDGE JOINT REPAIR (SEJ)
|
LF
|
665.000
|
$400.000
|
$1,000.000
|
$500.000
|
$253.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
40,288.000
|
$160.000
|
$189.500
|
$160.000
|
$180.000
|
|
|
TACK COAT
|
GAL
|
70,063.000
|
$5.000
|
$0.100
|
$6.000
|
$4.150
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$60,000.000
|
$20,000.000
|
$17,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
98.000
|
$300.000
|
$500.000
|
$250.000
|
$1,130.000
|
|
|
CURB INLET SEDIMENT PROTECTION
|
LF
|
1,445.000
|
$4.500
|
$10.000
|
$25.000
|
$22.000
|
|
Totals: |
$16,768,998.650
|
$19,292,920.920
|
$19,303,449.100
|
$21,774,959.840
|