Show Job Controls
Bid Cobra

TARRANT BU 287P (0172-01-056)

Items: 90

County: TARRANT
Length: N/A
Highway: BU 287P
District: FORT WORTH
Control Number: 0172-01-056
DBE Goal: N/A
Project: C 172-1-56
Guaranty: N/A
Time: 260 WORKING DAYS
Engineer's Estimate: $5,865,065.95
Date: 11/04/2020 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$5,865,065.95
$5,671,661.16
Over/Under Est: -3.3% -$193,404.79
$5,857,230.85
Over/Under Est: -0.13% -$7,835.10
Amt Left: 3.27% $185,569.69
Over/Under Est: 7.59% $445,204.05
Amt Left: 11.26% $638,608.84
Delta: -7.73% -$453,039.15
$6,525,630.00
Over/Under Est: 11.26% $660,564.05
Amt Left: 15.06% $853,968.84
Delta: -3.41% -$215,360.00
Over/Under Est: 15.11% $886,504.55
Amt Left: 19.04% $1,079,909.34
Delta: -3.46% -$225,940.50
$6,987,974.65
Over/Under Est: 19.15% $1,122,908.70
Amt Left: 23.21% $1,316,313.49
Delta: -3.50% -$236,404.15
$7,234,940.34
Over/Under Est: 23.36% $1,369,874.39
Amt Left: 27.56% $1,563,279.18
Delta: -3.53% -$246,965.69
Over/Under Est: 36.06% $2,114,747.87
Amt Left: 40.7% $2,308,152.66
Delta: -10.30% -$744,873.48

Bid Items & Bid Tabulations

90 Total 0 of 90
TARRANT  |  BU 287P  |  FORT WORTH  |  0172-01-056  |  11/04/2020  |  $5,865,065.95  |  C 172-1-56  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  260 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
TI-ZACK CONCRETE, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
FNH CONSTRUCTION, LLC
HIGHWAY 19 CONSTRUCTION LLC
ENCINO LANDSCAPE, INC.
ALTUS CONSTRUCTION LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 1.000 $640.000 $1,000.000 $1,500.000 $500.000 $2,500.000 $1,000.000 $1,000.000 $1,132.460 $2,000.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 1.000 $650.000 $1,600.000 $3,000.000 $650.000 $5,000.000 $3,000.000 $2,500.000 $1,874.730 $5,000.000
PREP ROW (TREE) (2" TO 12" DIA)
EA 21.000 $600.000 $500.000 $800.000 $350.000 $2,500.000 $100.000 $500.000 $576.850 $1,000.000
REMOVING CONC (PAV)
SY 1,174.000 $10.000 $30.000 $25.000 $10.000 $20.000 $50.000 $20.000 $12.290 $0.010
REMOVING CONC (RIPRAP)
SY 54.000 $10.500 $22.000 $35.000 $10.000 $20.000 $25.000 $20.000 $12.290 $0.010
REMOVING CONC (DRIVEWAYS)
SY 13,768.000 $18.000 $14.000 $25.000 $10.000 $17.500 $20.000 $20.000 $17.820 $0.010
REMOVE CONC (GUTTER)
LF 146.000 $10.000 $10.000 $10.000 $5.000 $20.000 $10.000 $20.000 $12.290 $0.010
REMOVING CONC (CURB OR CURB & GUTTER)
LF 10,793.000 $10.000 $8.000 $7.000 $3.000 $12.500 $10.000 $20.000 $9.830 $0.010
REMOVING CONC (SIDEWALK OR RAMP)
SY 1,326.000 $29.000 $10.000 $9.000 $10.000 $20.000 $25.000 $20.000 $13.410 $0.010
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 10,191.000 $5.000 $10.000 $15.000 $10.000 $15.000 $10.000 $20.000 $8.590 $8.000
EXCAVATION (SPECIAL)
CY 3,545.000 $10.000 $20.000 $17.000 $15.000 $20.000 $10.000 $20.000 $21.440 $21.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 306.000 $30.000 $15.000 $30.000 $20.000 $35.000 $180.000 $30.000 $43.020 $31.500
BLOCK SODDING
SY 22,015.000 $5.000 $6.250 $5.000 $6.000 $5.000 $5.000 $5.000 $3.610 $3.150
VEGETATIVE WATERING
MG 770.530 $15.000 $20.000 $1.000 $50.000 $50.000 $100.000 $5.000 $30.730 $10.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 278.000 $100.000 $100.000 $100.000 $75.000 $85.000 $250.000 $150.000 $86.030 $150.000
CONC PVMT (CONT REINF - CRCP) (9")
SY 483.000 $125.000 $110.000 $115.000 $77.000 $95.000 $300.000 $160.000 $92.180 $160.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 413.000 $175.000 $125.000 $150.000 $95.000 $125.000 $350.000 $200.000 $98.320 $205.000
FLOWABLE BACKFILL
CY 4.000 $200.000 $150.000 $1,000.000 $150.000 $350.000 $500.000 $600.000 $272.630 $630.000
CL A CONC (FLUME)
CY 2.000 $1,000.000 $780.000 $1,000.000 $450.000 $2,000.000 $1,000.000 $500.000 $493.340 $2,100.000
CL C CONC (MISC)
CY 4.000 $1,100.000 $450.000 $1,000.000 $1,500.000 $2,500.000 $3,000.000 $500.000 $935.180 $2,750.000
RETAINING WALL (CAST - IN - PLACE)
SF 376.000 $95.000 $70.000 $52.000 $60.000 $85.000 $55.000 $80.000 $184.360 $52.500
RIPRAP (CONC)(4 IN)
CY 34.000 $475.000 $700.000 $750.000 $450.000 $550.000 $500.000 $400.000 $491.620 $735.000
RIPRAP (CONC)(6 IN)
CY 7.000 $550.000 $650.000 $750.000 $500.000 $650.000 $500.000 $600.000 $579.830 $735.000
RAIL (HANDRAIL)(TY E)
LF 396.000 $160.000 $90.000 $100.000 $300.000 $150.000 $150.000 $120.000 $86.030 $75.000
RAIL (TY PR11)
LF 90.000 $100.000 $110.000 $115.000 $280.000 $150.000 $120.000 $120.000 $104.470 $90.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 4.000 $1,050.000 $1,100.000 $1,000.000 $1,700.000 $2,000.000 $800.000 $1,000.000 $1,843.560 $2,100.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $24,400.000 $26,000.000 $20,000.000 $35,000.000 $30,000.000 $1,600.000 $39,899.000 $30,726.050 $31,500.000
GRATE & FRAME
EA 53.000 $1,400.000 $500.000 $1,000.000 $2,500.000 $3,500.000 $3,000.000 $2,000.000 $1,229.040 $1,365.000
ADJUSTING MANHOLES
EA 3.000 $1,180.000 $1,350.000 $1,000.000 $1,200.000 $2,500.000 $300.000 $1,200.000 $1,514.670 $2,100.000
ADJUSTING INLETS
EA 4.000 $1,500.000 $1,000.000 $750.000 $1,100.000 $2,500.000 $300.000 $1,400.000 $2,184.600 $1,575.000
ADJUSTING MANHOLES (SANITARY)
EA 39.000 $1,180.000 $1,100.000 $750.000 $850.000 $2,500.000 $300.000 $1,000.000 $1,546.550 $2,100.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 30.000 $910.000 $600.000 $200.000 $300.000 $750.000 $200.000 $800.000 $874.220 $525.000
ADJUSTING MANHOLES (WATER METER)
EA 80.000 $360.000 $500.000 $100.000 $300.000 $850.000 $200.000 $500.000 $697.090 $735.000
ADJUSTING MANHOLES (TELEPHONE BOX)
EA 4.000 $810.000 $1,350.000 $1,000.000 $500.000 $250.000 $1,000.000 $1,000.000 $1,813.230 $735.000
REMOVE STR (BOLLARD)
EA 12.000 $200.000 $200.000 $250.000 $2,000.000 $150.000 $100.000 $500.000 $558.670 $120.000
MOBILIZATION
LS 1.000 $425,000.000 $560,000.000 $400,000.000 $580,000.000 $550,000.000 $600,000.000 $400,000.000 $712,844.360 $770,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $20,000.000 $1,000.000 $10,000.000 $8,500.000 $5,000.000 $8,999.000 $29,240.960 $52,500.000
SANDBAGS FOR EROSION CONTROL
EA 224.000 $7.000 $7.500 $0.010 $30.000 $5.000 $5.000 $5.000 $6.010 $7.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,976.000 $3.000 $1.700 $0.010 $6.000 $4.000 $1.000 $5.000 $2.090 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,976.000 $1.000 $0.500 $0.010 $1.000 $2.000 $1.000 $1.000 $0.610 $0.150
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,688.000 $4.000 $2.800 $0.010 $7.000 $18.000 $5.000 $5.000 $3.440 $2.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,688.000 $1.000 $0.600 $0.010 $1.000 $9.000 $1.000 $1.000 $0.740 $1.000
CONC CURB (TY II)
LF 40.000 $18.000 $10.000 $36.000 $12.000 $50.000 $3.000 $20.000 $11.110 $31.500
CONC CURB & GUTTER (TY II)
LF 9,685.000 $30.000 $20.000 $34.000 $7.500 $35.000 $30.000 $30.000 $29.820 $31.500
CONC CURB (TY IV)
LF 36.000 $13.000 $10.000 $45.000 $20.000 $50.000 $50.000 $100.000 $61.450 $31.500
DRIVEWAYS (CONC)
SY 22,872.000 $80.000 $75.000 $76.000 $80.000 $70.000 $75.000 $80.000 $104.370 $125.000
DRIVEWAYS (ACP)
SY 1,399.000 $40.000 $50.000 $55.000 $30.000 $45.000 $55.000 $80.000 $61.450 $63.000
CONC SIDEWALKS (4")
SY 23,963.000 $50.000 $50.000 $60.000 $60.000 $50.000 $61.000 $77.000 $52.630 $75.000
CURB RAMPS (TY 1)
SY 298.000 $200.000 $110.000 $85.000 $120.000 $200.000 $180.000 $150.000 $215.790 $110.000
CURB RAMPS (TY 2)
SY 562.000 $180.000 $110.000 $85.000 $125.000 $200.000 $180.000 $150.000 $180.210 $110.000
CURB RAMPS (TY 3)
SY 202.000 $200.000 $110.000 $85.000 $120.000 $200.000 $180.000 $150.000 $155.210 $112.000
CURB RAMPS (TY 5)
SY 39.000 $200.000 $125.000 $85.000 $130.000 $200.000 $180.000 $150.000 $205.650 $205.000
CURB RAMPS (TY 6)
SY 247.000 $130.000 $110.000 $85.000 $120.000 $200.000 $180.000 $150.000 $226.050 $110.000
CURB RAMPS (TY 7)
SY 933.000 $150.000 $125.000 $85.000 $120.000 $200.000 $180.000 $150.000 $194.970 $110.000
CURB RAMPS (TY 10)
SY 244.000 $240.000 $100.000 $85.000 $120.000 $200.000 $180.000 $150.000 $291.780 $111.000
CURB RAMPS (TY 21)
SY 87.000 $190.000 $150.000 $85.000 $130.000 $200.000 $180.000 $150.000 $212.830 $140.000
CURB RAMPS (TY 22)
SY 26.000 $260.000 $110.000 $85.000 $130.000 $200.000 $180.000 $150.000 $248.830 $180.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 52.000 $170.000 $80.000 $200.000 $95.000 $85.000 $350.000 $200.000 $151.320 $400.000
CONCRETE SIDEWALK (STEPS)
SY 1.000 $500.000 $1,000.000 $200.000 $500.000 $2,000.000 $2,000.000 $1,000.000 $441.030 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $3.000 $2.500 $10.000 $10.000 $3.000 $10.000 $5.000 $3.170 $5.320
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $204.000 $225.000 $150.000 $500.000 $500.000 $500.000 $1,000.000 $267.630 $318.990
MAILBOX INSTALL-S (WC-POST) TY 3
EA 28.000 $181.000 $200.000 $500.000 $150.000 $850.000 $500.000 $400.000 $241.860 $239.240
CONDT (PVC) (SCH 80) (3")
LF 40.000 $18.000 $18.750 $35.000 $40.000 $20.000 $35.000 $20.000 $23.040 $34.490
ELEC CONDR (NO.6) BARE
LF 30.000 $2.000 $2.000 $5.000 $10.000 $3.000 $4.000 $5.000 $2.460 $3.420
GROUND BOX TY D (162922)
EA 48.000 $1,050.000 $985.490 $3,200.000 $4,000.000 $1,000.000 $1,000.000 $500.000 $1,211.210 $1,060.800
REMOVE GROUND BOX
EA 48.000 $310.000 $355.000 $350.000 $500.000 $250.000 $355.000 $200.000 $436.310 $349.290
RELOCATE SM RD SN SUP&AM TY S80
EA 108.000 $490.000 $551.890 $275.000 $450.000 $650.000 $385.000 $300.000 $678.300 $409.600
REMOVE SM RD SN SUP&AM
EA 4.000 $100.000 $155.000 $55.000 $350.000 $650.000 $274.000 $300.000 $190.500 $291.080
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 6.000 $100.000 $75.000 $125.000 $20.000 $100.000 $75.000 $65.000 $73.440 $132.910
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $100.000 $100.000 $275.000 $600.000 $100.000 $75.000 $100.000 $97.620 $212.660
INSTL OM ASSM (OM-3L)(TWT)GND
EA 1.000 $250.000 $300.000 $385.000 $600.000 $100.000 $75.000 $300.000 $290.520 $212.660
INSTL OM ASSM (OM-3R)(TWT)GND
EA 1.000 $250.000 $250.000 $500.000 $650.000 $100.000 $75.000 $300.000 $261.050 $212.660
REMOVE DELIN & OBJECT MARKER ASSMS
EA 6.000 $25.000 $20.000 $60.000 $50.000 $50.000 $50.000 $40.000 $31.280 $79.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,476.000 $7.000 $4.940 $5.500 $15.000 $13.000 $11.000 $8.000 $6.070 $5.250
REFL PAV MRK TY II (W) 24" (SLD)
LF 4,476.000 $3.000 $0.460 $0.500 $10.000 $7.000 $11.000 $5.000 $0.570 $0.490
ELIM EXT PAV MRK & MRKS (12")
LF 1,745.000 $2.000 $1.000 $1.000 $10.000 $7.000 $6.000 $3.000 $1.230 $1.060
ELIM EXT PAV MRK & MRKS (24")
LF 1,626.000 $3.000 $1.750 $2.000 $15.000 $12.000 $11.000 $5.000 $2.150 $1.860
PAV SURF PREP FOR MRK (24")
LF 4,476.000 $1.000 $0.250 $0.300 $10.000 $7.000 $6.000 $2.000 $0.310 $0.270
PED SIG SEC (LED)(COUNTDOWN)
EA 5.000 $600.000 $735.330 $2,000.000 $2,500.000 $1,000.000 $500.000 $600.000 $903.750 $506.270
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 910.000 $2.000 $1.280 $4.500 $6.000 $3.000 $1.250 $3.000 $1.570 $1.310
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 920.000 $2.000 $3.000 $4.500 $6.000 $3.000 $2.000 $3.000 $3.690 $1.550
PED POLE ASSEMBLY
EA 3.000 $2,270.000 $2,280.000 $6,500.000 $8,000.000 $200.000 $1,601.000 $3,000.000 $2,802.410 $1,702.340
PED DETECT PUSH BUTTON (APS)
EA 30.000 $820.000 $643.890 $1,500.000 $1,600.000 $1,200.000 $1,600.000 $800.000 $791.370 $1,247.620
PED DETECTOR CONTROLLER UNIT
EA 8.000 $3,500.000 $3,745.320 $6,000.000 $6,750.000 $4,000.000 $4,038.000 $3,500.000 $4,603.160 $4,293.710
REMOVAL OF SIGNAL HEAD ASSM
EA 1.000 $220.000 $145.150 $200.000 $250.000 $250.000 $220.000 $100.000 $178.400 $232.860
INSTALL OF SIGNAL HEAD ASSM
EA 1.000 $340.000 $358.290 $2,000.000 $2,500.000 $350.000 $600.000 $600.000 $440.350 $582.160
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 25.000 $90.000 $197.440 $60.000 $120.000 $250.000 $110.000 $200.000 $242.660 $116.430
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 274.000 $75.000 $55.780 $60.000 $150.000 $100.000 $100.000 $300.000 $61.450 $157.500
TMA (STATIONARY)
DAY 195.000 $125.000 $100.000 $60.000 $300.000 $250.000 $300.000 $300.000 $245.810 $157.500
GAS VALVE BOX ADJUSTMENT
EA 13.000 $1,000.000 $1,000.000 $115.000 $1,000.000 $1,000.000 $1,000.000 $2,000.000 $1,843.560 $475.000
Totals: $5,865,065.950 $5,671,661.160 $5,857,230.850 $6,310,270.000 $6,525,630.000 $6,751,570.500 $6,987,974.650 $7,234,940.347 $7,979,813.820