Show Job Controls
Bid Cobra

TARRANT SH 199 (0171-05-098)

Items: 44

County: TARRANT
Length: N/A
Highway: SH 199
District: FORT WORTH
Control Number: 0171-05-098
DBE Goal: N/A
Project: NH 1902(259)
Guaranty: N/A
Time: 107 WORKING DAYS
Engineer's Estimate: $1,018,339.00
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,018,339.00
$1,243,381.45
Over/Under Est: 22.1% $225,042.45
Over/Under Est: 22.86% $232,833.50
Amt Left: 0.63% $7,791.05
Over/Under Est: 53.6% $545,822.25
Amt Left: 25.8% $320,779.80
Delta: -25.02% -$312,988.75

Bid Items & Bid Tabulations

44 Total 0 of 44
TARRANT  |  SH 199  |  FORT WORTH  |  0171-05-098  |  08/07/2019  |  $1,018,339.00  |  NH 1902(259)  |  RESURF ROADWAY  |  107 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PEACHTREE CONSTRUCTION, LTD.
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (MISC)
SY 12.000 $50.000 $275.000 $150.000 $250.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 958.000 $15.000 $29.000 $90.000 $28.000
REMOV STAB BASE & ASPH PAV (8"-20")
SY 12.000 $25.000 $110.000 $250.000 $500.000
BROADCAST SEED (TEMP) (WARM)
SY 1,027.000 $1.000 $2.500 $0.500 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 1,027.000 $1.000 $2.500 $0.500 $1.000
PRIME COAT (EC-30)
GAL 6,527.000 $4.500 $3.250 $2.000 $5.200
SUPERPAVE MIXTURES SP-C SAC-B PG70-28
TON 3,753.000 $85.000 $112.500 $124.500 $127.750
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
SY 956.000 $80.000 $83.000 $68.000 $104.500
FLEX PAVEMENT STRUCTURE REPAIR (8"-12")
SY 2,182.000 $90.000 $93.000 $82.000 $88.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 32,635.000 $2.000 $3.250 $2.000 $3.000
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 117.000 $3.000 $40.000 $30.000 $105.000
CL C CONC (MISC)
CY 13.000 $700.000 $1,750.000 $1,250.000 $1,800.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 10.000 $100.000 $1,150.000 $600.000 $1,200.000
CONC STR REPAIR (STANDARD)
SF 49.000 $200.000 $400.000 $475.000 $1,200.000
ADJUSTING MANHOLES (SANITARY)
EA 5.000 $2,000.000 $2,400.000 $2,500.000 $2,250.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $1,000.000 $2,400.000 $2,000.000 $2,250.000
MOBILIZATION
LS 1.000 $91,000.000 $110,000.000 $100,000.000 $163,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $15,000.000 $7,500.000 $5,000.000 $39,370.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 231.000 $1.000 $5.500 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 231.000 $2.500 $2.750 $5.000 $5.000
CONC CURB (TY II)
LF 362.000 $20.000 $34.000 $100.000 $33.000
CONC CURB & GUTTER (TY II)
LF 596.000 $30.000 $75.000 $100.000 $70.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 54.000 $600.000 $425.000 $350.000 $450.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 25.000 $150.000 $165.000 $150.000 $175.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 2.000 $400.000 $82.000 $75.000 $87.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 241.000 $1.000 $2.200 $0.750 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,485.000 $1.000 $2.200 $0.750 $1.250
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 24.000 $1.500 $5.200 $5.000 $5.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,534.000 $1.000 $2.200 $2.000 $2.050
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,204.000 $3.500 $4.000 $4.000 $3.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,430.000 $8.000 $7.250 $7.000 $6.900
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 5.000 $75.000 $66.000 $65.000 $62.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 438.000 $5.000 $7.500 $7.000 $8.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,850.000 $0.500 $0.800 $0.750 $0.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 555.000 $0.500 $0.550 $0.550 $0.550
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 990.000 $0.500 $0.750 $0.750 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 13,855.000 $0.500 $0.550 $0.550 $0.550
PREFAB PAV MRK TY C (W) (ARROW)
EA 15.000 $250.000 $260.000 $260.000 $245.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 1.000 $350.000 $425.000 $425.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 13.000 $275.000 $360.000 $325.000 $325.000
REFL PAV MRKR TY II-A-A
EA 292.000 $4.000 $4.400 $4.000 $4.050
REFL PAV MRKR TY II-C-R
EA 174.000 $4.000 $4.400 $4.000 $4.050
TMA (STATIONARY)
DAY 2.000 $3,000.000 $750.000 $600.000 $305.000
TMA (MOBILE OPERATION)
DAY 6.000 $200.000 $850.000 $750.000 $305.000
Totals: $1,018,339.000 $1,243,381.450 $1,251,172.500 $1,564,161.250