TARRANT SS 347 (0081-01-053)

Items: 52

County: TARRANT
Length: 0.0830 MILES
Highway: SS 347
District: FORT WORTH
Control Number: 0081-01-053
DBE Goal: 5.0%
Project: BR 2025(243)
Guaranty: $33,000.00
Time: 214 WORKING DAYS
Engineer's Estimate: $1,658,355.81
Date: 12/03/2024 (1 year ago)
Contract Number: 12243017
Type: REHABILITATE BRIDGE
Project ID: A00193283
Project Description: PARTIAL TO FULL DECK REPLACEMENT AND, NEW RAILS.
Mail/Deliver Bids To: N/A
MARIBEL RANGEL
MARIBLE RANGEL
JUSTIN THOMEY
RAUL OROZCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,658,355.81
Over/Under Est: 55.86% $926,351.69
$2,674,732.00
Over/Under Est: 61.29% $1,016,376.19
Amt Left: 3.48% $90,024.50
Over/Under Est: 69.94% $1,159,792.29
Amt Left: 9.03% $233,440.60
Delta: -5.36% -$143,416.10
Over/Under Est: 92.65% $1,536,392.19
Amt Left: 23.6% $610,040.50
Delta: -13.36% -$376,599.90
$4,582,305.00
Over/Under Est: 176.32% $2,923,949.19
Amt Left: 77.29% $1,997,597.50
Delta: -43.43% -$1,387,557.00

Bid Items & Bid Tabulations

52 Total 0 of 52
TARRANT  |  SS 347  |  FORT WORTH  |  0081-01-053  |  12/03/2024  |  $1,658,355.81  |  BR 2025(243)  |  REHAB BRIDGE  |  214 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
IBCTX, LLC
RAGLE CONSTRUCTION, INC.
SOUTHERN ROAD & BRIDGE, LLC
ICOS MANAGEMENT, LLC
PREPARING ROW
STA 4.000 $14,870.160 $7,500.000 $10,000.000 $50,000.000 $22,000.000 $10,000.000
REMOV CONC (APPR SLAB)
SY 166.000 $77.000 $400.000 $90.000 $38.000 $35.000 $400.000
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 167.000 $56.000 $300.000 $25.000 $20.000 $85.000 $150.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 423.000 $11.000 $300.000 $25.000 $20.000 $45.000 $250.000
SP MIXES SP-C SAC-A PG70-28
TON 105.000 $205.470 $800.000 $550.000 $350.000 $450.000 $1,200.000
TACK COAT
GAL 122.000 $12.000 $10.000 $35.000 $6.000 $10.000 $60.000
CL C CONC (RAIL FOUNDATION)
CY 5.000 $932.000 $1,000.000 $2,000.000 $1,000.000 $3,500.000 $3,000.000
REINF CONC SLAB (HPC)
SF 9,373.000 $32.000 $55.000 $40.000 $46.000 $68.000 $80.000
APPROACH SLAB (HPC)
CY 60.000 $931.000 $900.000 $1,100.000 $700.000 $1,450.000 $3,000.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 609.000 $23.000 $40.000 $28.000 $25.000 $45.000 $15.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 25.000 $246.000 $350.000 $290.000 $70.000 $325.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 52.000 $779.000 $100.000 $850.000 $800.000 $125.000 $800.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 79.000 $25.000 $65.000 $28.000 $45.000 $42.000 $200.000
RESIZING AND SEALING JOINTS
LF 108.000 $60.000 $75.000 $66.000 $25.000 $85.000 $210.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 520.000 $14.000 $125.000 $45.000 $15.000 $65.000 $120.000
STR STEEL (SHEAR CONNECTOR)
LB 2,897.000 $8.000 $30.000 $18.000 $8.000 $34.000 $100.000
CLEAN & PAINT EXIST STR (SYSTEM III-B)
LS 1.000 $180,000.000 $420,000.000 $415,000.000 $400,000.000 $525,000.000 $600,000.000
RAIL (TY SSTR)(MOD)
LF 482.800 $294.000 $250.000 $190.000 $122.000 $425.000 $600.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 141.000 $228.000 $600.000 $275.000 $213.000 $787.000 $420.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $78,209.000 $60,000.000 $365,000.000 $547,000.000 $65,000.000 $200,000.000
REMOV STR (ABUTMENT)
EA 2.000 $5,350.000 $15,000.000 $10,000.000 $5,000.000 $44,000.000 $90,000.000
REMOVE STR (RAIL)
LF 400.000 $55.000 $60.000 $30.000 $120.000 $95.000 $300.000
ADJUST STL SHOES
EA 7.000 $8,648.000 $15,000.000 $3,500.000 $15,000.000 $3,250.000 $16,000.000
MOBILIZATION
LS 1.000 $150,000.000 $210,000.000 $267,000.000 $280,000.000 $250,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $11,686.730 $4,000.000 $30,000.000 $25,000.000 $8,500.000 $20,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,348.930 $4,000.000 $25,000.000 $20,000.000 $6,500.000 $20,000.000
TMA (STATIONARY)
DAY 214.000 $226.360 $350.000 $75.000 $345.000 $300.000 $600.000
TMA (MOBILE OPERATION)
HR 24.000 $351.650 $300.000 $100.000 $68.000 $450.000 $500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 230.000 $14.390 $8.000 $16.000 $10.000 $10.000 $40.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 230.000 $3.540 $3.000 $6.000 $1.000 $10.000 $20.000
MTL W-BEAM GD FEN (TIM POST)
LF 950.000 $32.490 $75.000 $30.000 $23.000 $33.000 $50.000
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $350.000 $1,500.000 $1,000.000 $800.000 $1,250.000 $6,500.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 3.000 $1,000.000 $3,000.000 $2,100.000 $1,800.000 $2,250.000 $5,000.000
REMOVE METAL BEAM GUARD FENCE
LF 975.000 $6.000 $6.000 $6.000 $2.500 $7.000 $20.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $314.000 $500.000 $350.000 $250.000 $400.000 $4,500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $384.000 $500.000 $350.000 $250.000 $350.000 $2,000.000
RM MTL BM GD FEN TRANS (T101)
EA 3.000 $250.000 $500.000 $350.000 $250.000 $450.000 $7,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,483.330 $4,500.000 $3,300.000 $2,900.000 $4,000.000 $8,500.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 9.000 $40.000 $55.000 $55.000 $60.000 $75.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 2.000 $22.030 $45.000 $40.000 $22.000 $75.000 $150.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2
EA 4.000 $40.000 $55.000 $55.000 $60.000 $75.000 $300.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 3.000 $21.420 $45.000 $40.000 $22.000 $65.000 $150.000
RE PM TY II (W) 6" (BRK)
LF 185.000 $1.380 $1.500 $4.000 $10.000 $45.000 $300.000
RE PM TY II (W) 6" (SLD)
LF 368.000 $1.140 $1.500 $4.000 $6.500 $9.000 $100.000
RE PM TY II (Y) 6" (SLD)
LF 372.000 $1.330 $1.500 $4.000 $6.500 $9.000 $100.000
PAVEMENT SLER 6"
LF 1,480.000 $0.420 $1.500 $4.000 $1.000 $2.000 $30.000
PAV SURF PREP FOR MRK (6")
LF 1,480.000 $0.030 $1.000 $2.000 $5.000 $8.000 $30.000
CONCRETE RAIL REPAIR (MISC)
LF 5.000 $365.000 $400.000 $1,200.000 $500.000 $850.000 $4,000.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 37.000 $115.000 $80.000 $80.000 $150.000 $95.000 $160.000
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 52.000 $68.000 $50.000 $46.000 $150.000 $48.000 $80.000
REP STL BRIDGE MBR (STRAIGHTEN MEMB)
EA 8.000 $16,430.000 $15,000.000 $25,000.000 $3,700.000 $61,500.000 $21,000.000
REP STL BRIDGE MBR (WELD REPAIR)
EA 2.000 $1,950.000 $10,000.000 $3,000.000 $1,000.000 $2,500.000 $6,500.000
Totals: $1,658,355.810 $2,584,707.500 $2,674,732.000 $2,818,148.100 $3,194,748.000 $4,582,305.000