Show Job Controls
Bid Cobra

TARRANT US 377 (0081-01-051)

Items: 51

County: TARRANT
Length: N/A
Highway: US 377
District: FORT WORTH
Control Number: 0081-01-051
DBE Goal: N/A
Project: NH 1902(356)
Guaranty: N/A
Time: 278 WORKING DAYS
Engineer's Estimate: $5,214,403.50
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,214,403.50
$6,436,651.58
Over/Under Est: 23.44% $1,222,248.08
$7,084,305.86
Over/Under Est: 35.86% $1,869,902.36
Amt Left: 10.06% $647,654.28
$7,733,066.00
Over/Under Est: 48.3% $2,518,662.50
Amt Left: 20.14% $1,296,414.42
Delta: -9.16% -$648,760.14
Over/Under Est: 51.95% $2,708,833.83
Amt Left: 23.1% $1,486,585.75
Delta: -2.46% -$190,171.33
Over/Under Est: 56.72% $2,957,482.53
Amt Left: 26.96% $1,735,234.45
Delta: -3.14% -$248,648.70

Bid Items & Bid Tabulations

51 Total 0 of 51
TARRANT  |  US 377  |  FORT WORTH  |  0081-01-051  |  08/06/2019  |  $5,214,403.50  |  NH 1902(356)  |  PREVENT MAINT  |  278 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
ALTUS CONSTRUCTION LLC
FNH CONSTRUCTION, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (MISC)
SY 67.000 $50.000 $500.000 $29.620 $50.000 $581.000 $60.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 8,084.000 $15.000 $12.500 $6.780 $20.000 $12.500 $24.000
REMOV STAB BASE & ASPH PAV (8"-20")
SY 67.000 $25.000 $620.000 $45.100 $20.000 $500.000 $18.000
EXCAVATION (ROADWAY)
CY 26.000 $8.000 $342.450 $30.990 $20.000 $1,200.000 $1,400.000
BROADCAST SEED (TEMP) (WARM)
SY 7,650.000 $0.200 $0.310 $0.120 $1.000 $0.870 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 7,650.000 $0.200 $0.310 $0.120 $1.000 $0.870 $1.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 26.000 $40.000 $430.000 $109.980 $80.000 $1,200.000 $1,400.000
PRIME COAT (EC-30)
GAL 48,236.000 $4.500 $3.400 $2.610 $6.000 $0.050 $4.100
SUPERPAVE MIXTURES SP-C SAC-B PG70-28
TON 27,737.000 $85.000 $103.000 $125.480 $110.000 $123.000 $116.000
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
SY 3,874.000 $80.000 $55.000 $58.820 $50.000 $75.000 $81.000
FLEX PAVEMENT STRUCTURE REPAIR (8"-12")
SY 2,070.000 $90.000 $88.000 $88.230 $100.000 $90.000 $88.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 239,255.000 $2.000 $3.000 $2.190 $5.000 $3.500 $3.500
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 2,060.000 $3.000 $7.000 $3.620 $10.000 $17.500 $7.500
FULL - DEPTH REPAIR CRCP (7"-8") HES
SY 743.000 $250.000 $250.000 $468.930 $300.000 $367.000 $425.000
CL C CONC (MISC)
CY 88.000 $700.000 $1,300.000 $1,205.110 $1,500.000 $1,695.000 $1,400.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 187.000 $100.000 $250.000 $162.110 $600.000 $195.000 $380.000
CONC STR REPAIR (STANDARD)
SF 101.000 $200.000 $255.000 $258.240 $600.000 $225.000 $320.000
RIPRAP (CONC)(4 IN)
CY 13.000 $500.000 $735.000 $629.500 $550.000 $1,150.000 $1,000.000
ADJUSTING MANHOLES (SANITARY)
EA 10.000 $2,000.000 $2,100.000 $2,785.870 $2,500.000 $1,375.000 $3,200.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 10.000 $1,000.000 $1,000.000 $902.740 $750.000 $850.000 $2,000.000
MOBILIZATION
LS 1.000 $400,000.000 $640,000.000 $653,564.530 $700,000.000 $790,000.000 $813,758.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $8,500.000 $15,000.000 $19,223.830 $8,500.000 $42,500.000 $60,000.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 727.000 $1.000 $3.680 $2.260 $18.000 $6.320 $7.500
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 727.000 $2.500 $1.740 $8.230 $9.000 $2.100 $2.500
COLORED TEXTURED CONC (5")
SY 34.000 $100.000 $325.000 $134.280 $125.000 $139.000 $210.000
CONC CURB (TY I)
LF 606.000 $20.000 $31.000 $16.970 $35.000 $52.000 $43.000
CONC CURB (TY II)
LF 7,396.000 $20.000 $25.000 $16.270 $35.000 $49.500 $46.000
CONC CURB & GUTTER (TY II)
LF 91.000 $30.000 $38.000 $47.030 $45.000 $61.000 $54.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 222.000 $600.000 $405.290 $856.300 $850.000 $385.000 $490.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 17.000 $650.000 $447.400 $1,147.480 $650.000 $425.000 $535.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $700.000 $703.210 $1,769.420 $650.000 $668.000 $830.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 24.000 $150.000 $157.910 $463.930 $650.000 $150.000 $190.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 30.000 $400.000 $105.270 $558.180 $650.000 $100.000 $125.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,921.000 $1.000 $0.790 $1.630 $6.000 $1.050 $1.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,136.000 $1.000 $0.790 $1.390 $6.000 $1.050 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,729.000 $1.000 $1.010 $1.460 $6.000 $0.960 $1.150
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,566.000 $3.500 $3.470 $4.770 $10.000 $3.300 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,519.000 $8.000 $5.790 $9.200 $20.000 $5.500 $7.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 204.000 $5.000 $5.790 $9.470 $20.000 $5.500 $7.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 16,392.000 $0.500 $0.740 $0.560 $1.000 $0.700 $0.850
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 60,226.000 $0.500 $0.630 $0.470 $1.000 $0.600 $0.740
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,625.000 $0.500 $0.740 $0.480 $1.000 $0.700 $0.830
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 63,117.000 $0.500 $0.630 $0.470 $1.000 $0.600 $0.720
PREFAB PAV MRK TY C (W) (ARROW)
EA 86.000 $250.000 $189.490 $331.260 $250.000 $180.000 $215.000
PREFAB PAV MRK TY C (W) (WORD)
EA 56.000 $275.000 $252.650 $422.250 $250.000 $240.000 $285.000
REFL PAV MRKR TY II-A-A
EA 462.000 $4.000 $4.210 $4.820 $15.000 $4.000 $4.750
REFL PAV MRKR TY II-C-R
EA 1,183.000 $4.000 $4.210 $5.590 $15.000 $4.000 $4.750
REPLACE VEHICLE LOOP DETECTOR
LF 4,678.000 $10.000 $25.220 $35.950 $15.000 $20.000 $26.000
BRIDGE JOINT REPLACEMENT (HEADER)
LF 302.000 $350.000 $126.320 $189.530 $150.000 $132.000 $160.000
TMA (STATIONARY)
EA 5.000 $3,000.000 $19,500.000 $30,636.300 $10,000.000 $37,500.000 $1.000
TMA (MOBILE OPERATION)
DAY 34.000 $200.000 $1,900.000 $407.290 $850.000 $750.000 $245.000
Totals: $5,214,403.500 $6,436,651.580 $7,084,305.860 $7,733,066.000 $7,923,237.330 $8,171,886.030