TARRANT US 377 (0081-01-050)

Items: 55

County: TARRANT
Length: 0.1770 MILES
Highway: US 377
District: FORT WORTH
Control Number: 0081-01-050
DBE Goal: 7.0%
Project: BR 2025(152)
Guaranty: $67,000.00
Time: 192 WORKING DAYS
Engineer's Estimate: $3,341,800.00
Date: 10/02/2024 (1 year ago)
Contract Number: 10243214
Type: REHABILITATE BRIDGE
Project ID: A00061163
Project Description: BRIDGE REHABILITATION
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,341,800.00
$2,055,473.49
Over/Under Est: -38.49% -$1,286,326.51
Over/Under Est: -37.48% -$1,252,586.00
Amt Left: 1.64% $33,740.51
Over/Under Est: 7.51% $251,026.78
Amt Left: 74.79% $1,537,353.29
Delta: -71.97% -$1,503,612.78
Over/Under Est: 14.39% $480,960.38
Amt Left: 85.98% $1,767,286.89
Delta: -6.40% -$229,933.60
Subcontractor Percentage Amount
MACIAS SPECIALTY CONTRACTING LLC 13.35% $274,878.16
JR WEST TEXAS CONCRETE LLC 8.94% $184,075.71
S&S BRIDGE PAINTING 2.53% $52,093.01
PEACHTREE CONSTRUCTION, LTD. 2.51% $51,681.21
DUSTROL, INC. 1.53% $31,502.89
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.00% $20,590.12
BARRICADES UNLIMITED 0.71% $14,618.99
SOUTHEAST GRINDING AND GROOVING LLC 0.53% $10,912.77
FORTSON CONTRACTING, INC. 0.48% $9,883.26
TRP CONSTRUCTION GROUP, LLC 0.29% $5,971.14
NELSON INDUSTRIAL SERVICES, INC. 0.28% $5,765.23
Total: 32.15% $661,972.49

Bid Items & Bid Tabulations

55 Total 0 of 55
TARRANT  |  US 377  |  FORT WORTH  |  0081-01-050  |  10/02/2024  |  $3,341,800.00  |  BR 2025(152)  |  REHAB BRIDGE  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
RAGLE CONSTRUCTION, INC.
MB WESTERN INDUSTRIAL CONTRACTING CO.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
REMOV CONC (RIPRAP)
SY 13.000 $40.000 $250.000 $50.000 $105.000 $500.000
REMOV CONC (CURB RAMP)
SY 8.000 $50.000 $250.000 $100.000 $125.000 $500.000
REMOV CONC (CURB & GUTTER)
LF 8.000 $17.000 $125.000 $50.000 $125.000 $500.000
RMV (2") TRT/UNTRT BASE & ASPH PAV
SY 105.000 $7.000 $60.500 $20.000 $81.000 $200.000
EMBANK (FNL)(OC)(TY A)
CY 13.000 $60.000 $400.000 $150.000 $145.000 $100.000
COMPOST MANUF TOPSOIL (4")
SY 131.000 $10.000 $16.500 $25.000 $22.200 $25.000
BLOCK SODDING
SY 131.000 $4.000 $8.800 $25.000 $11.840 $25.000
VEGETATIVE WATERING
TGL 5.000 $50.000 $825.000 $250.000 $1,110.000 $850.000
D-GR HMA TY-C SAC-A PG70-22 (EXEMPT)
TON 115.000 $250.000 $458.700 $310.000 $400.000 $500.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 13.000 $200.000 $599.500 $725.000 $450.000 $500.000
TACK COAT
GAL 229.000 $5.000 $5.060 $1.000 $10.000 $10.000
PLANE ASPH CONC PAV(0" TO 6")
SY 4,313.000 $12.000 $6.580 $9.000 $8.850 $30.000
CL C CONC (RAIL FOUNDATION)
CY 21.200 $960.000 $1,072.500 $250.000 $950.000 $2,500.000
CL C CONC (MISC)
CY 2.200 $1,500.000 $1,980.000 $1,150.000 $1,750.000 $2,500.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 7,507.000 $20.000 $7.650 $6.500 $10.290 $25.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 4,300.000 $175.000 $20.000 $35.000 $250.000 $200.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 66.000 $920.000 $750.000 $320.000 $350.000 $650.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 845.000 $900.000 $203.500 $150.000 $313.760 $250.000
RIPRAP (CONC) (CL B) (4 IN)
CY 3.000 $1,500.000 $1,650.000 $1,750.000 $1,000.000 $1,200.000
CLEANING AND SEALING EXISTING JOINTS
LF 533.000 $100.000 $41.800 $38.000 $56.240 $60.000
POLYESTER POLYMER CONC OVERLAY (2")
SY 2,834.000 $200.000 $226.000 $234.000 $325.000 $300.000
POLYESTER POLYMER CONC OVERLAY (3")
SY 353.000 $220.000 $315.000 $465.000 $470.000 $400.000
STR STEEL (MISC NON-BRIDGE)
LB 712.000 $50.000 $35.000 $10.000 $11.230 $200.000
RAIL (TY C411)
LF 50.000 $165.000 $423.500 $350.000 $450.000 $250.000
MOBILIZATION
LS 1.000 $295,620.000 $250,000.000 $220,000.000 $325,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $10,000.000 $16,000.000 $25,000.000 $5,000.000 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,250.000 $50,000.000 $10,000.000 $20,000.000
TMA (STATIONARY)
DAY 30.000 $165.000 $360.000 $100.000 $250.000 $300.000
TMA (MOBILE OPERATION)
HR 8.000 $75.000 $100.000 $100.000 $250.000 $300.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $21.000 $37.400 $34.000 $50.320 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $7.250 $15.400 $14.000 $20.720 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 963.000 $5.000 $5.780 $5.250 $7.770 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 963.000 $1.000 $1.380 $1.250 $1.850 $3.000
CONC CURB & GUTTER (TY II)
LF 132.000 $90.000 $124.000 $50.000 $75.000 $150.000
CONC SIDEWALKS (4")
SY 20.000 $250.000 $300.000 $85.000 $105.000 $250.000
CURB RAMPS (TY 2)
EA 1.000 $3,000.000 $4,000.000 $1,750.000 $3,500.000 $10,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $32.000 $24.750 $22.500 $33.300 $35.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,450.000 $1,320.000 $1,200.000 $1,776.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 88.000 $12.000 $15.000 $3.000 $29.600 $15.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,165.250 $2,877.500 $4,258.700 $4,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 18.000 $15.000 $22.000 $20.000 $29.600 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 2.000 $26.000 $27.500 $25.000 $37.000 $40.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $80.000 $66.000 $60.000 $88.800 $40.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 144.000 $10.000 $2.000 $1.000 $5.000 $0.010
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 94.000 $10.000 $2.000 $1.000 $5.000 $0.010
PAVEMENT SLER 6"
LF 3,228.000 $0.500 $0.280 $0.750 $0.250 $1.000
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 460.000 $1.000 $1.210 $2.000 $3.090 $2.000
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 1,911.000 $1.000 $1.210 $1.750 $2.960 $2.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 1,873.000 $1.000 $1.210 $1.750 $2.960 $2.000
REFL PAV MRKR TY I-C
EA 28.000 $6.000 $11.000 $10.000 $11.840 $20.000
REFL PAV MRKR TY II-A-A
EA 28.000 $6.000 $11.000 $10.000 $11.840 $20.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 183.000 $400.000 $440.000 $150.000 $250.000 $500.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 51.000 $410.000 $550.000 $540.000 $500.000 $500.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 1,965.000 $75.000 $55.000 $50.000 $149.480 $165.000
BRIDGE JOINT REPAIR (ARMOR)
LF 82.000 $670.000 $240.000 $150.000 $355.200 $1,000.000
Totals: $3,341,800.000 $2,055,473.490 $2,089,214.000 $3,592,826.780 $3,822,760.380