TARRANT US 81 (0014-15-080)

Items: 37

County: TARRANT
Length: N/A
Highway: US 81
District: FORT WORTH
Control Number: 0014-15-080
DBE Goal: N/A
Project: C 14-15-80
Guaranty: N/A
Time: 107 WORKING DAYS
Engineer's Estimate: $599,441.59
Date: 03/03/2022 (4 years ago)
Contract Number: N/A
Type: EMBANKMENT STABILIZATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$599,441.59
$739,218.40
Over/Under Est: 23.32% $139,776.81
Over/Under Est: 28.86% $172,984.26
Amt Left: 4.49% $33,207.45

Bid Items & Bid Tabulations

37 Total 0 of 37
TARRANT  |  US 81  |  FORT WORTH  |  0014-15-080  |  03/03/2022  |  $599,441.59  |  C 14-15-80  |  EMBANKMENT STABILIZATION  |  107 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
RAGLE CONSTRUCTION, INC.
PREPARING ROW
AC 0.640 $6,000.000 $100,000.000 $12,000.000
REMOVING CONC (RIPRAP)
SY 1,250.000 $30.000 $40.000 $40.000
EXCAVATION (SPECIAL)
CY 2,541.000 $15.000 $40.000 $50.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,541.000 $35.000 $40.000 $39.000
BLOCK SODDING
SY 2,200.000 $3.000 $2.000 $6.000
VEGETATIVE WATERING
MG 72.680 $30.000 $5.000 $20.000
FLOWABLE BACKFILL
CY 82.000 $300.000 $200.000 $250.000
TEMPORARY SPL SHORING
SF 2,115.000 $22.000 $20.000 $12.000
CL A CONC (FLUME)
CY 9.000 $550.000 $1,000.000 $600.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 393.000 $28.000 $10.000 $16.500
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 100.000 $100.000 $300.000 $150.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 28.000 $300.000 $300.000 $200.000
CONC STR REPAIR (STANDARD)
SF 34.000 $200.000 $1,000.000 $200.000
RIPRAP (CONC) (CL B) (4")
CY 161.000 $375.000 $500.000 $480.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 333.000 $70.000 $40.000 $35.000
HEADER TYPE EXPANSION JOINT
CF 24.000 $500.000 $400.000 $750.000
JOINT SEALANT
LF 96.000 $50.000 $20.000 $20.000
MOBILIZATION
LS 1.000 $54,494.690 $50,000.000 $77,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $9,000.000 $8,000.000 $13,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $32.000 $50.000 $31.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 100.000 $60.000 $60.000 $48.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $9.500 $10.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 225.000 $50.000 $30.000 $19.000
CONSTRUCTION EXITS (REMOVE)
SY 225.000 $20.000 $10.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,600.000 $3.000 $5.000 $1.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,600.000 $2.000 $1.000 $0.650
CONC CURB (TY IV)
LF 160.000 $18.000 $50.000 $24.520
PAVEMENT SEALER 4"
LF 450.000 $0.250 $1.000 $2.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 150.000 $1.000 $1.000 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 150.000 $1.000 $1.000 $5.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 150.000 $1.000 $1.000 $5.000
REFL PAV MRKR TY I-C
EA 8.000 $5.000 $10.000 $10.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 345.000 $5.000 $5.000 $14.190
DRAIN INLET CLEANING
EA 4.000 $500.000 $250.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $10,000.000 $300.000 $15,000.000
TMA (STATIONARY)
DAY 100.000 $160.000 $300.000 $250.000
TMA (MOBILE OPERATION)
HR 30.000 $65.000 $100.000 $100.000
Totals: $599,441.590 $739,218.400 $772,425.850