TARRANT IH 20 (0008-16-042)

Items: 181

County: TARRANT
Length: N/A
Highway: IH 20
District: FORT WORTH
Control Number: 0008-16-042
DBE Goal: N/A
Project: NH 1902(222)
Guaranty: N/A
Time: 361 WORKING DAYS
Engineer's Estimate: $19,845,312.43
Date: 10/02/2019 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT NEW ROADWAY LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$19,845,312.43
$21,436,036.74
Over/Under Est: 8.02% $1,590,724.31
$23,691,644.44
Over/Under Est: 19.38% $3,846,332.01
Amt Left: 10.52% $2,255,607.70
$23,828,507.51
Over/Under Est: 20.07% $3,983,195.08
Amt Left: 11.16% $2,392,470.77
Delta: -0.58% -$136,863.07
Over/Under Est: 20.75% $4,117,633.40
Amt Left: 11.79% $2,526,909.09
Delta: -0.56% -$134,438.32
Over/Under Est: 26.89% $5,335,774.31
Amt Left: 17.47% $3,745,050.00
Delta: -5.08% -$1,218,140.91
Over/Under Est: 29.09% $5,772,231.59
Amt Left: 19.51% $4,181,507.28
Delta: -1.73% -$436,457.28
Over/Under Est: 35.54% $7,053,176.43
Amt Left: 25.48% $5,462,452.12
Delta: -5.00% -$1,280,944.84
Over/Under Est: 68.59% $13,611,666.47
Amt Left: 56.08% $12,020,942.16
Delta: -24.38% -$6,558,490.04

Bid Items & Bid Tabulations

181 Total 0 of 181
TARRANT  |  IH 20  |  FORT WORTH  |  0008-16-042  |  10/02/2019  |  $19,845,312.43  |  NH 1902(222)  |  CONSTRUCT NEW ROADWAY LANES  |  361 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
BRIDGES AND ROADS, LLC
FLUOR HEAVY CIVIL, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
ZACHRY CONSTRUCTION CORPORATION
RAGLE CONSTRUCTION, INC.
STERLING DELAWARE HOLDING COMPANY, INC.
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 4.630 $10,000.000 $134,100.000 $6,361.900 $64,760.000 $37,703.370 $516,951.000 $500,000.000 $97,384.000 $133,333.000
REMOVING CONC (PAV)
SY 5,603.300 $18.000 $14.500 $7.300 $15.080 $10.450 $7.000 $10.000 $13.000 $15.000
REMOVING CONC (RIPRAP)
SY 295.300 $10.000 $12.500 $8.300 $5.820 $5.090 $13.000 $6.000 $7.650 $15.000
REMOVE CONC (RAIL)
LF 3,984.000 $15.000 $6.200 $9.000 $4.680 $6.720 $13.000 $18.000 $7.000 $30.000
REMOVING CONC (FLUME)
SY 613.300 $25.000 $8.200 $10.500 $11.200 $6.650 $8.000 $7.500 $21.000 $15.000
REMOVING STAB BASE & ASPH PAV (0-2")
SY 8,558.000 $2.500 $2.000 $2.400 $1.840 $2.690 $1.700 $1.500 $2.250 $5.000
EXCAVATION (ROADWAY)
CY 22,639.300 $10.000 $4.800 $7.700 $8.690 $10.000 $20.000 $2.750 $10.000 $20.000
EXCAVATION (CHANNEL)
CY 2,852.000 $15.000 $6.300 $8.800 $55.600 $14.000 $25.000 $9.000 $21.000 $40.000
EXCAVATION (SPECIAL)
CY 10,383.200 $16.000 $11.000 $11.800 $10.260 $10.000 $12.000 $10.000 $10.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 11,400.800 $8.750 $5.000 $6.200 $5.670 $5.000 $16.000 $21.000 $10.000 $20.000
COMPOST MANUF TOPSOIL (4")
SY 14,763.100 $1.400 $1.250 $2.100 $2.250 $5.000 $2.090 $0.890 $5.250 $5.000
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 14,763.100 $0.500 $0.320 $0.100 $0.110 $2.000 $0.110 $0.290 $0.400 $5.000
FERTILIZER
TON 0.900 $590.000 $2,900.000 $759.000 $672.000 $3,000.000 $672.000 $1,492.000 $850.000 $5,000.000
VEGETATIVE WATERING
MG 516.700 $12.500 $25.000 $22.300 $12.950 $45.000 $19.000 $20.000 $25.000 $50.000
PROOF ROLLING
HR 2.400 $200.000 $250.000 $96.000 $83.610 $125.000 $95.000 $125.000 $43.000 $300.000
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
CY 5,227.900 $40.000 $42.000 $53.800 $48.150 $20.000 $57.000 $50.000 $50.000 $50.000
LIME (HYDRATED LIME (SLURRY))
TON 392.100 $170.000 $160.000 $173.700 $165.000 $90.000 $167.000 $160.000 $200.000 $200.000
LIME TRT (SUBGRADE)(8")
SY 23,525.400 $4.500 $3.200 $4.500 $4.000 $2.000 $6.500 $4.000 $3.650 $1.000
PRIME COAT (MULTI OPTION)
GAL 4,229.940 $3.400 $6.600 $6.600 $6.500 $6.220 $6.500 $5.400 $6.500 $3.250
ASPH (AC-10)
GAL 6,567.600 $2.970 $6.000 $5.800 $5.750 $2.820 $5.750 $4.500 $5.750 $2.880
AGGR(TY-B GR-3 SAC-B)
CY 125.700 $73.500 $400.000 $378.600 $375.000 $220.840 $375.000 $140.000 $375.000 $188.000
AGGR(TY-PB GR-4 SAC-B)
CY 103.900 $69.200 $500.000 $494.800 $490.000 $271.800 $490.000 $100.000 $490.000 $246.000
D-GR HMA TY-B PG64-22
TON 6,818.800 $75.000 $87.000 $83.600 $82.750 $90.000 $82.750 $92.500 $82.750 $88.000
TOM (ASPHALT) PG 76-22
TON 41.100 $138.000 $195.000 $186.800 $185.000 $145.000 $185.000 $195.000 $185.000 $188.000
TOM-C (AGGREGATE) SAC-A
TON 645.400 $134.090 $195.000 $186.800 $185.000 $145.000 $185.000 $195.000 $185.000 $188.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,563.100 $1.500 $6.100 $3.600 $8.130 $2.240 $5.900 $7.000 $7.000 $8.000
CONC PVMT (CONT REINF - CRCP) (11")
SY 16,559.000 $51.000 $75.000 $54.200 $82.580 $80.000 $68.000 $70.000 $80.000 $80.000
CEM STABIL BKFL
CY 725.000 $108.000 $135.000 $84.300 $90.080 $110.000 $125.000 $85.000 $127.000 $210.000
CUT & RESTORE ASPH PAVING
SY 61.000 $70.610 $150.000 $97.600 $105.370 $150.000 $150.000 $80.000 $119.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 451.000 $7.500 $12.000 $4.000 $8.320 $40.000 $13.000 $1.000 $0.500 $25.000
TEMPORARY SPL SHORING
SF 17,194.000 $22.000 $25.000 $26.300 $18.460 $25.000 $17.480 $19.000 $29.000 $52.500
DRILL SHAFT (30 IN)
LF 620.000 $250.000 $125.000 $169.900 $137.030 $152.010 $113.830 $130.000 $132.000 $171.000
DRILL SHAFT (36 IN)
LF 34.000 $180.000 $400.000 $296.600 $348.360 $165.000 $350.000 $180.000 $416.000 $343.000
DRILL SHAFT (42 IN)
LF 650.000 $405.000 $250.000 $329.500 $279.490 $251.410 $239.850 $240.000 $307.000 $360.000
DRILL SHAFT (48 IN)
LF 22.000 $300.000 $560.000 $430.100 $489.750 $400.000 $450.000 $250.000 $547.000 $438.000
DRILL SHAFT (54 IN)
LF 399.000 $399.000 $380.000 $537.600 $460.250 $392.520 $386.120 $380.000 $425.000 $557.000
DRILL SHAFT (60 IN)
LF 160.000 $400.000 $580.000 $687.800 $557.270 $558.550 $540.340 $550.000 $710.000 $798.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 32.000 $682.000 $800.000 $659.500 $560.000 $560.000 $560.000 $560.000 $588.000 $607.430
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 10.000 $182.000 $300.000 $265.800 $200.000 $200.000 $200.000 $200.000 $185.000 $244.800
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 48.000 $181.760 $300.000 $231.300 $120.000 $120.000 $120.000 $120.000 $222.000 $213.000
CL A CONC (MISC)
CY 284.200 $600.000 $200.000 $645.100 $200.130 $153.870 $265.000 $230.000 $376.000 $630.000
CL C CONC (ABUT)(HPC)
CY 109.250 $1,200.000 $720.000 $836.500 $1,074.290 $963.570 $865.000 $750.000 $1,294.000 $1,500.000
CL C CONC (CAP)(HPC)
CY 339.500 $1,100.000 $750.000 $1,082.200 $1,249.140 $1,300.000 $785.000 $950.000 $972.000 $1,000.000
CL C CONC (COLUMN)(HPC)
CY 299.600 $920.000 $620.000 $867.500 $922.760 $900.000 $1,000.000 $700.000 $878.000 $1,000.000
CL C CONC (MISC)
CY 1,786.000 $500.000 $380.000 $562.500 $370.360 $344.660 $375.000 $440.000 $358.000 $500.000
REINF CONC SLAB (HPC)
SF 36,344.000 $19.000 $23.000 $27.300 $22.770 $25.820 $21.000 $17.000 $25.000 $30.000
APPROACH SLAB (HPC)
CY 140.500 $515.000 $500.000 $592.100 $536.940 $425.080 $546.000 $480.000 $615.000 $600.000
RETAINING WALL (MSE)
SF 18,586.000 $45.000 $48.000 $41.600 $60.060 $65.000 $64.000 $55.000 $63.000 $80.000
PRESTR CONC GIRDER (TX54)
LF 2,167.100 $130.000 $155.000 $153.500 $165.610 $178.010 $173.000 $190.000 $225.000 $226.000
PRESTR CONC GIRDER (TX70)
LF 1,096.300 $145.000 $160.000 $203.200 $181.670 $188.710 $177.000 $180.000 $223.000 $278.000
RIPRAP (CONC)(4 IN)
CY 330.250 $650.000 $410.000 $404.400 $181.690 $414.600 $480.000 $420.000 $372.000 $600.000
RIPRAP (CONC)(5 IN)
CY 313.900 $420.000 $405.000 $388.400 $92.880 $410.340 $490.000 $430.000 $377.000 $600.000
RIPRAP (CONC) (CL A )
CY 9.000 $571.000 $585.000 $530.700 $172.630 $600.000 $865.000 $490.000 $668.000 $1,200.000
RIPRAP (CONC) (CL B) (4")
CY 30.000 $520.000 $525.000 $404.400 $214.090 $502.000 $540.000 $550.000 $518.000 $600.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 544.600 $250.000 $98.000 $100.800 $101.070 $128.210 $95.000 $160.000 $161.000 $210.000
RIPRAP (CONC)(FLUME)
CY 413.600 $320.000 $700.000 $528.200 $232.040 $693.160 $865.000 $390.000 $580.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 303.000 $460.000 $425.000 $428.100 $167.280 $409.000 $440.000 $430.000 $358.000 $600.000
ELASTOMERIC BEARING (E5)
EA 8.000 $1,600.000 $2,500.000 $2,430.000 $3,343.790 $2,260.240 $2,000.000 $1,650.000 $2,000.000 $2,000.000
ELASTOMERIC BEARING (F5)
EA 4.000 $1,600.000 $2,600.000 $2,420.900 $3,343.780 $2,260.240 $2,100.000 $2,000.000 $2,200.000 $2,000.000
SLIDING ELASTOMERIC BEARING (ES 3)
EA 4.000 $3,200.000 $2,600.000 $2,041.300 $3,183.530 $2,418.530 $3,600.000 $2,150.000 $1,800.000 $3,000.000
STR STEEL (PLATE GIRDER)
LB 1,112,667.000 $2.000 $1.800 $1.700 $1.630 $1.710 $1.700 $2.000 $2.000 $2.750
STR STEEL (MISCELLANEOUS BRIDGE)
LB 600.000 $13.000 $11.000 $11.600 $11.670 $5.000 $6.000 $13.000 $11.000 $15.000
RAIL (TY SSTR)
LF 1,556.000 $45.000 $48.000 $38.300 $49.760 $47.120 $45.000 $45.000 $37.500 $60.000
RAIL (TY SSTR)(HPC)
LF 902.400 $63.000 $60.000 $49.100 $60.440 $59.610 $55.000 $56.000 $48.000 $66.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 4,321.500 $47.000 $43.000 $40.400 $53.600 $49.170 $48.000 $45.000 $39.500 $66.000
RAIL (TY SSTR)(MOD)
LF 4,022.000 $42.000 $68.000 $63.400 $99.160 $69.410 $70.000 $65.000 $62.000 $86.000
ARMOR JOINT (SEALED)
LF 138.000 $128.000 $65.000 $93.500 $105.810 $250.000 $180.000 $70.000 $85.000 $150.000
CONC BOX CULV (6 FT X 3 FT)
LF 192.000 $325.000 $400.000 $365.300 $361.050 $421.860 $370.000 $340.000 $480.000 $630.000
RC PIPE (CL III)(18 IN)
LF 89.000 $60.000 $80.000 $62.700 $88.880 $117.230 $110.000 $65.000 $75.000 $200.000
RC PIPE (CL III)(60 IN)
LF 211.000 $205.000 $375.000 $334.200 $315.690 $393.620 $375.000 $275.000 $262.000 $600.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $3,550.000 $5,200.000 $3,042.400 $4,839.280 $1,982.750 $5,700.000 $2,600.000 $3,200.000 $10,000.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 3.000 $12,000.000 $23,000.000 $10,475.900 $25,342.550 $17,909.400 $19,300.000 $18,500.000 $21,650.000 $20,000.000
HEADWALL (CH - FW - 0) (DIA= 18 IN)
EA 1.000 $3,450.000 $4,500.000 $2,905.600 $3,062.300 $2,195.030 $2,750.000 $3,500.000 $3,100.000 $3,600.000
HEADWALL (CH - FW - 30) (DIA= 60 IN)
EA 1.000 $11,000.000 $14,000.000 $17,475.600 $11,234.920 $6,500.000 $6,500.000 $18,000.000 $13,000.000 $18,000.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $10,000.000 $13,000.000 $6,872.400 $10,069.100 $10,000.000 $6,000.000 $11,000.000 $9,000.000 $25,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $800.000 $1,000.000 $847.500 $1,000.890 $1,452.160 $4,200.000 $1,250.000 $1,257.000 $2,000.000
JACK BOR OR TUN PIPE(18 IN)(RC) (CL IV)
LF 95.000 $704.000 $700.000 $589.700 $655.570 $603.540 $398.300 $425.000 $431.000 $1,000.000
REMOV STR (INLET)
EA 9.000 $710.000 $750.000 $660.600 $909.390 $382.240 $650.000 $450.000 $705.000 $1,000.000
REMOV STR (WINGWALL)
EA 7.000 $1,120.000 $900.000 $1,016.000 $1,907.540 $214.850 $1,000.000 $1,300.000 $1,200.000 $3,000.000
REMOV STR (PIPE)
LF 118.000 $30.000 $30.000 $20.000 $21.190 $100.000 $15.000 $50.000 $26.000 $25.000
MOBILIZATION
LS 1.000 $1,650,000.000 $1,721,000.000 $2,354,890.230 $2,370,000.000 $2,364,500.000 $2,100,000.000 $2,500,000.000 $2,600,000.000 $3,333,333.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $9,200.000 $8,000.000 $918.900 $8,580.000 $30,000.000 $7,500.000 $34,000.000 $10,250.000 $31,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 90.000 $25.000 $23.000 $19.900 $25.500 $25.500 $19.740 $19.740 $30.500 $33.130
ROCK FILTER DAMS (REMOVE)
LF 90.000 $7.000 $13.000 $11.400 $10.500 $10.500 $11.250 $11.250 $17.000 $10.700
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,449.000 $2.000 $1.500 $1.300 $1.500 $1.500 $1.300 $1.300 $1.750 $1.870
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,449.000 $0.750 $0.900 $0.800 $0.650 $0.650 $0.750 $0.750 $0.750 $0.440
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 808.000 $2.000 $2.600 $2.300 $3.000 $3.000 $2.250 $2.250 $3.500 $3.780
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 96.000 $4.000 $4.400 $3.800 $5.000 $5.000 $3.750 $3.750 $5.500 $13.820
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,059.000 $1.440 $0.650 $0.500 $0.900 $0.900 $0.500 $0.500 $1.650 $1.310
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 155.000 $3.800 $2.600 $2.300 $5.000 $5.000 $2.250 $2.250 $3.200 $6.770
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 11,086.000 $62.000 $12.000 $43.000 $84.410 $72.500 $70.000 $60.000 $82.000 $80.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 11,086.000 $4.000 $6.800 $5.500 $5.650 $9.500 $4.500 $8.000 $7.000 $8.000
REMOVE METAL BEAM GUARD FENCE
LF 1,333.000 $3.500 $3.500 $2.600 $3.000 $4.000 $6.000 $2.500 $6.000 $5.250
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $235.000 $320.000 $235.400 $300.000 $400.000 $250.000 $250.000 $250.000 $262.500
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $212.000 $320.000 $244.100 $300.000 $400.000 $250.000 $250.000 $250.000 $367.500
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $800.000 $504.900 $745.000 $700.000 $486.870 $1,250.000 $500.000 $755.910
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $14,000.000 $20,000.000 $16,165.900 $19,495.000 $18,500.000 $23,500.000 $18,000.000 $14,000.000 $26,826.180
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,500.000 $6,800.000 $7,022.500 $7,985.000 $7,500.000 $7,500.000 $8,500.000 $6,955.000 $13,649.780
PIPE UNDERDRAINS (TY 8) (6")
LF 1,554.000 $35.000 $25.000 $12.000 $30.120 $0.010 $22.000 $0.010 $41.000 $1.000
RELOCATE RD IL ASM (SHOE-BASE)
EA 1.000 $1,400.000 $1,300.000 $1,418.400 $1,300.000 $1,300.000 $1,300.000 $1,300.000 $1,213.000 $1,306.460
HI MST IL POLE (150 FT)( 80 MPH)
EA 1.000 $31,810.000 $30,500.000 $28,792.900 $27,700.000 $27,700.000 $27,700.000 $27,700.000 $27,185.000 $26,520.950
CONDT (PVC) (SCH 40) (2")
LF 56.000 $9.000 $12.500 $26.500 $5.000 $5.000 $5.000 $5.000 $14.050 $24.440
CONDT (PVC) (SCH 40) (3")
LF 8,341.000 $11.000 $12.600 $12.600 $10.000 $10.000 $10.000 $10.000 $18.250 $11.580
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,337.000 $30.000 $32.000 $29.000 $20.000 $20.000 $20.000 $20.000 $35.300 $26.740
CONDT (RM) (2")
LF 4.000 $37.000 $50.000 $29.700 $35.000 $35.000 $35.000 $35.000 $40.110 $27.360
CONDT (RM) (3")
LF 1,612.000 $53.000 $65.000 $38.300 $45.000 $45.000 $45.000 $45.000 $77.100 $35.240
ELEC CONDR (NO.8) BARE
LF 18,096.000 $1.100 $1.100 $1.300 $0.900 $0.900 $0.900 $0.900 $1.330 $1.190
ELEC CONDR (NO.8) INSULATED
LF 3,256.000 $1.390 $1.200 $1.400 $1.000 $1.000 $1.000 $1.000 $1.420 $1.300
ELEC CONDR (NO.6) BARE
LF 688.000 $1.600 $1.350 $1.500 $1.100 $1.100 $1.100 $1.100 $1.480 $1.350
ELEC CONDR (NO.6) INSULATED
LF 1,376.000 $1.750 $1.450 $1.600 $1.200 $1.200 $1.200 $1.200 $1.600 $1.480
ELEC CONDR (NO.4) BARE
LF 2,325.000 $1.730 $1.600 $1.900 $1.600 $1.600 $1.600 $1.600 $1.750 $1.720
ELEC CONDR (NO.4) INSULATED
LF 6,096.000 $2.000 $1.800 $1.900 $1.700 $1.700 $1.700 $1.700 $1.760 $1.760
ELEC CONDR (NO.1/0) BARE
LF 2,061.000 $3.110 $2.800 $3.700 $2.400 $2.400 $2.400 $2.400 $3.670 $3.410
ELEC CONDR (NO.1/0) INSULATED
LF 4,122.000 $3.150 $3.400 $4.000 $2.800 $2.800 $2.800 $2.800 $3.960 $3.650
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,250.000 $975.000 $1,102.900 $1,200.000 $1,200.000 $1,200.000 $1,200.000 $1,622.000 $1,015.880
REMOVE GROUND BOX
EA 2.000 $500.000 $210.000 $377.600 $400.000 $400.000 $400.000 $400.000 $820.000 $347.820
REMOVE ELECTRICAL SERVICES
EA 1.000 $503.200 $460.000 $1,504.200 $500.000 $500.000 $500.000 $500.000 $488.000 $1,385.480
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 2.000 $4,400.000 $5,100.000 $7,044.300 $4,200.000 $4,200.000 $4,200.000 $4,200.000 $7,545.000 $6,488.430
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 6.000 $4,600.000 $4,400.000 $5,953.600 $3,500.000 $3,500.000 $3,500.000 $3,500.000 $6,840.000 $5,483.780
ALUMINUM SIGNS (TY G)
SF 51.400 $20.000 $33.000 $50.900 $22.000 $22.000 $31.880 $22.000 $38.900 $46.860
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 20.000 $35.000 $28.000 $46.900 $19.000 $19.000 $26.990 $19.000 $56.950 $43.240
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 751.600 $42.000 $33.000 $33.000 $21.000 $21.000 $31.560 $21.000 $52.400 $30.380
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $585.000 $690.000 $747.000 $565.000 $565.000 $655.000 $565.000 $1,143.000 $688.080
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $610.000 $780.000 $857.800 $650.000 $650.000 $724.060 $650.000 $1,180.000 $790.090
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $950.000 $900.000 $990.000 $750.000 $750.000 $959.300 $750.000 $1,326.000 $911.930
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 5.000 $2,300.000 $2,400.000 $2,493.600 $1,900.000 $1,900.000 $2,055.300 $1,900.000 $2,854.000 $2,296.880
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $65.000 $390.000 $410.400 $300.000 $300.000 $240.020 $300.000 $705.000 $378.000
REMOVE SM RD SN SUP&AM
EA 20.000 $182.000 $115.000 $124.800 $40.000 $40.000 $96.710 $40.000 $216.000 $114.980
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 1.000 $70.000 $115.000 $124.800 $100.000 $100.000 $75.610 $100.000 $216.000 $114.980
INSTALL LRSS (STRUCT STEEL)
LB 179.800 $5.000 $17.000 $13.500 $8.000 $8.000 $16.480 $8.000 $6.550 $12.430
INS OH SN SUP(35 FT BAL TEE)
EA 1.000 $24,620.000 $30,500.000 $30,592.600 $24,500.000 $24,500.000 $29,237.930 $24,500.000 $50,555.000 $28,178.590
SIGN WALKWAY (48 IN) WITH HNDRL
LF 12.170 $162.000 $1,275.000 $1,233.700 $240.000 $240.000 $1,227.890 $240.000 $235.000 $1,136.380
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,000.000 $1.000 $0.400 $0.400 $0.350 $0.350 $0.350 $1.000 $0.350 $0.370
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 9,432.000 $1.000 $0.350 $0.300 $0.300 $0.300 $0.300 $1.000 $0.300 $0.320
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,209.000 $1.500 $2.200 $2.000 $2.000 $2.000 $2.000 $1.350 $2.000 $2.100
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,000.000 $1.000 $1.100 $1.000 $1.000 $1.000 $1.000 $0.850 $1.000 $1.050
REFL PAV MRK TY II (W) 4" (BRK)
LF 6,009.000 $0.380 $0.300 $0.300 $0.250 $0.250 $0.250 $0.150 $0.250 $0.260
REFL PAV MRK TY II (W) 4" (SLD)
LF 11,347.000 $0.320 $0.250 $0.200 $0.200 $0.200 $0.200 $0.150 $0.200 $0.210
REFL PAV MRK TY II (W) 8" (SLD)
LF 2,454.000 $0.550 $0.450 $0.400 $0.400 $0.400 $0.400 $0.350 $0.400 $0.420
REFL PAV MRK TY II (W) 12" (SLD)
LF 1,221.000 $2.200 $0.850 $0.800 $0.750 $0.750 $0.750 $1.900 $0.750 $0.790
REFL PAV MRK TY II (W) (ARROW)
EA 7.000 $62.000 $93.000 $85.800 $85.000 $85.000 $85.000 $55.000 $85.000 $89.250
REFL PAV MRK TY II (W) (WORD)
EA 4.000 $69.000 $115.000 $106.000 $105.000 $105.000 $105.000 $85.000 $105.000 $110.250
REFL PAV MRK TY II (Y) 4" (SLD)
LF 12,001.000 $0.320 $0.240 $0.200 $0.200 $0.200 $0.200 $0.150 $0.200 $0.210
REFL PAV MRK TY II (W)12"(DOT)
LF 2,122.000 $3.520 $1.100 $1.000 $1.000 $1.000 $1.000 $1.900 $1.000 $1.050
REFL PAV MRKR TY I-C
EA 355.000 $5.000 $4.500 $4.000 $4.000 $4.000 $4.000 $4.000 $4.000 $4.200
REFL PAV MRKR TY I-R
EA 168.000 $6.000 $9.000 $8.100 $8.000 $8.000 $8.000 $4.000 $8.000 $8.400
REFL PAV MRKR TY II-C-R
EA 480.000 $5.000 $4.500 $4.000 $4.000 $4.000 $4.000 $4.000 $4.000 $4.200
ELIM EXT PAV MRK & MRKS (4")
LF 27,706.500 $0.200 $0.400 $0.400 $0.350 $0.350 $0.350 $0.400 $0.350 $0.370
ELIM EXT PAV MRK & MRKS (8")
LF 1,259.000 $0.460 $0.750 $0.700 $0.650 $0.650 $0.650 $0.500 $0.650 $0.680
PAV SURF PREP FOR MRK (RPM)
EA 168.000 $0.250 $1.100 $1.000 $1.000 $1.000 $1.000 $0.250 $1.000 $1.050
BRIDGE JOINT REPAIR (ARMOR)
LF 878.000 $250.000 $140.000 $429.100 $188.770 $114.750 $256.000 $100.000 $750.000 $315.000
NEXT GEN CONC SURF GRIND OF CONC PAV
SY 60,818.400 $1.500 $9.000 $13.500 $7.000 $4.740 $5.630 $5.000 $13.000 $15.000
NOISE WALL
SF 9,000.000 $53.000 $42.000 $31.400 $39.890 $38.330 $22.000 $30.000 $28.000 $40.000
TRANSPARENT NOISE BARRIER PANELS
SF 37,208.000 $63.000 $105.000 $130.700 $131.660 $131.840 $120.000 $132.000 $150.000 $161.000
INTRLCK ART CONC BLK W/PERCUSSION DRV
SF 64,590.000 $20.000 $12.200 $15.200 $19.150 $15.860 $17.000 $15.000 $14.750 $31.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $14,000.000 $7,144.900 $16,403.530 $15,155.000 $17,500.000 $40,000.000 $12,500.000 $21,000.000
FO CBL (72 SMF)
LF 37,982.000 $1.750 $2.900 $5.700 $2.500 $2.500 $2.500 $2.500 $2.070 $5.210
FO SPLICE ENCLOSURE (TYPE 1)
EA 9.000 $1,700.000 $720.000 $2,131.400 $1,400.000 $1,400.000 $1,400.000 $1,400.000 $1,770.000 $1,963.190
FO SPLICE ENCLOSURE (TYPE 2)
EA 2.000 $1,700.000 $840.000 $2,131.400 $1,500.000 $1,500.000 $1,500.000 $1,500.000 $2,540.000 $1,963.190
FIBER OPTIC FUSION SPLICE
EA 300.000 $36.000 $81.000 $44.200 $40.000 $40.000 $40.000 $40.000 $93.050 $40.710
REMOVE FIBER OPTIC CABLE
LF 19,069.000 $1.000 $1.100 $1.200 $0.650 $0.650 $0.650 $0.650 $1.480 $1.080
CCTV FIELD EQUIPMENT (DIGITAL)
EA 5.000 $8,500.000 $10,500.000 $8,654.000 $6,600.000 $6,600.000 $6,600.000 $6,600.000 $9,260.000 $7,971.130
CCTV MOUNT (POLE)
EA 1.000 $655.000 $660.000 $875.800 $200.000 $200.000 $200.000 $200.000 $563.000 $806.660
ITS MULTI-DUCT CND (PVC-40)
LF 6,507.000 $15.300 $21.000 $34.700 $15.000 $15.000 $15.000 $15.000 $22.900 $31.950
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 1,960.000 $23.000 $40.000 $66.700 $33.000 $33.000 $33.000 $33.000 $38.800 $61.430
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $13,170.000 $8,700.000 $15,130.000 $15,000.000 $15,000.000 $15,000.000 $15,000.000 $25,300.000 $13,936.130
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
EA 4.000 $3,800.000 $5,800.000 $8,598.100 $3,500.000 $3,500.000 $3,500.000 $3,500.000 $6,705.000 $7,919.630
ITS POLE (30 FT)(90 MPH)
EA 2.000 $6,500.000 $7,000.000 $11,684.900 $5,700.000 $5,700.000 $5,700.000 $5,700.000 $7,400.000 $10,762.870
ITS POLE (60 FT)(90 MPH)
EA 1.000 $13,050.000 $14,000.000 $18,935.800 $11,000.000 $11,000.000 $11,000.000 $11,000.000 $13,010.000 $17,441.660
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 2.000 $6,300.000 $6,300.000 $6,908.900 $5,000.000 $5,000.000 $5,000.000 $5,000.000 $6,105.000 $6,363.740
ITS POLE MNT CAB (TY 3)(CONF 2)
EA 1.000 $5,935.000 $6,900.000 $7,396.600 $5,300.000 $5,300.000 $5,300.000 $5,300.000 $6,530.000 $6,812.930
TMA (MOBILE OPERATION)
DAY 4.000 $250.000 $350.000 $242.500 $820.180 $676.030 $3,000.000 $2,000.000 $1,544.680 $262.500
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 14.000 $2,725.000 $2,800.000 $4,573.800 $2,900.000 $2,900.000 $2,900.000 $2,900.000 $3,060.000 $4,212.850
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 8.000 $3,379.000 $5,200.000 $6,974.600 $4,200.000 $4,200.000 $4,200.000 $4,200.000 $4,092.000 $6,424.260
HIGH MAST ASSEMBLY FOR ITS
EA 1.000 $72,000.000 $40,500.000 $39,099.600 $23,000.000 $23,000.000 $23,000.000 $23,000.000 $38,700.000 $36,014.370
ITS RVSD (DATA COLLECT & WWA) SYS
EA 2.000 $7,500.000 $11,000.000 $15,165.900 $7,000.000 $7,000.000 $7,000.000 $7,000.000 $14,585.000 $13,969.200
ITS RVSD (DC ONLY) (RELOCATE)
EA 2.000 $2,500.000 $1,600.000 $5,845.100 $500.000 $500.000 $500.000 $500.000 $3,970.000 $5,383.880
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
EA 1.000 $4,500.000 $8,400.000 $5,944.800 $13,000.000 $13,000.000 $13,000.000 $13,000.000 $17,550.000 $5,475.750
INST WRONG WAY DRIVER SYSTEM EQUIPMENT
EA 4.000 $4,200.000 $42,000.000 $5,648.500 $1,000.000 $1,000.000 $1,000.000 $1,000.000 $7,045.000 $5,202.750
REMOVE EXIST WATER PIPE (8")
LF 743.000 $12.920 $11.000 $12.500 $28.170 $21.530 $12.930 $20.000 $17.000 $52.500
CASING (STEEL) (30 IN) (OPEN TRENCH)
LF 32.000 $250.000 $175.000 $398.100 $190.260 $114.950 $1,000.000 $375.000 $210.000 $630.000
Totals: $19,845,312.434 $21,436,036.751 $23,691,644.465 $23,828,507.596 $23,962,945.919 $25,181,086.770 $25,617,544.049 $26,898,488.875 $33,456,978.939