Show Job Controls
Bid Cobra

TARRANT IH 820 (0008-13-248)

Items: 135

County: TARRANT
Length: N/A
Highway: IH 820
District: FORT WORTH
Control Number: 0008-13-248
DBE Goal: N/A
Project: F 2023(694)
Guaranty: N/A
Time: 384 WORKING DAYS
Engineer's Estimate: $20,028,594.25
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
DANIEL POOLE
NICHOLAS SPENCER
NATNAEL ASFAW
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$20,028,594.25
$18,792,214.65
Over/Under Est: -6.17% -$1,236,379.60
Over/Under Est: -6.04% -$1,210,250.89
Amt Left: 0.14% $26,128.71
$19,950,325.07
Over/Under Est: -0.39% -$78,269.18
Amt Left: 6.16% $1,158,110.42
Delta: -6.02% -$1,131,981.71
$30,632,675.96
Over/Under Est: 52.94% $10,604,081.71
Amt Left: 63.01% $11,840,461.31
Delta: -53.54% -$10,682,350.89
Subcontractor Percentage Amount
CHOCTAW ERECTORS, INC. 18.27% $3,522,380.88
PEACHTREE CONSTRUCTION, LTD. 7.02% $1,353,427.14
ATS DRILLING, INC. 3.47% $669,001.73
A.E.A. TRANSPORTATION 1.87% $360,528.31
HB FARMER FOUNDATION, LLC 1.37% $264,130.37
DAVIS MOTOR CRANE SERVICE, INC. 0.91% $175,444.26
STRUCTURAL TECHNOLOGIES, LLC 0.61% $117,605.49
MICA CORPORATION 0.52% $100,253.86
JB PINNACLE GROUP, LLC 0.50% $96,397.94
XEGR, LLC 0.49% $94,469.99
KING GEORGE TRAFFIC SOLUTIONS LLC 0.26% $50,126.93
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.25% $48,198.97
TEXOP CONSTRUCTION 0.19% $36,631.22
SCOTT DERR PAINTING CO, LLC 0.17% $32,775.30
FARR FOUNDATION, INC. 0.17% $32,775.30
PRIMATE CONSTRUCTION, LP 0.16% $30,847.34
TORO BRAVO CONSTRUCTION, LLC 0.15% $28,919.38
ALLIANCE GEOTECHNICAL GROUP, INC. 0.14% $26,991.42
DIIBS SPECIALISTS, LLC 0.12% $23,135.51
ANTIGO CONSTRUCTION, INC. 0.11% $21,207.55
CCP CONCRETE PUMPING, L.P. 0.09% $17,351.63
SOUTHWEST CONSTRUCTION SERVICES 0.05% $9,639.79
ACT SAW CUTTING & REMOVAL 0.03% $5,783.88
FLYING C SERVICES 0.03% $5,783.88
SYNERGY SIGNS & SERVICES LLC 0.01% $1,927.96
Total: 36.96% $7,125,736.03

Bid Items & Bid Tabulations

135 Total 0 of 135
TARRANT  |  IH 820  |  FORT WORTH  |  0008-13-248  |  05/05/2023  |  $20,028,594.25  |  F 2023(694)  |  REHAB EXIST ROADWAY  |  384 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FLATIRON CONSTRUCTORS, INC.
INDUS ROAD & BRIDGE, INC.
SEMA CONSTRUCTION, INC.
TEXAS-REYES GROUP LTD.
PREPARING ROW
STA 31.340 $6,275.070 $58,763.140 $12,500.000 $52,525.450 $92,000.000
REMOVING CONC (PAV)
SY 11,854.000 $16.000 $6.900 $11.000 $11.310 $8.200
EXCAVATION (ROADWAY)
CY 44,676.000 $18.000 $9.140 $20.000 $13.800 $18.000
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 27,328.000 $14.570 $7.200 $8.000 $20.790 $23.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 15,234.000 $45.000 $97.860 $85.000 $66.670 $68.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 613.000 $80.000 $56.190 $90.000 $73.870 $220.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 34,473.000 $0.160 $0.110 $0.300 $3.200 $0.300
VEGETATIVE WATERING
MG 1,207.000 $39.740 $20.800 $35.000 $15.000 $50.000
LIME (HYDRATED LIME (SLURRY))
TON 207.000 $280.370 $289.000 $307.000 $295.000 $614.930
LIME TRT (SUBGRADE)(8")
SY 12,383.000 $8.010 $3.330 $3.000 $4.770 $11.910
CEMENT
TON 58.000 $233.240 $303.450 $310.000 $230.000 $611.350
CEMENT TREAT (SUBGRADE) (8")
SY 4,128.000 $20.000 $3.330 $4.000 $3.720 $27.010
SALV, HAUL & STKPL RCL APH PV (5 TO 9")
SY 2,381.000 $7.000 $4.780 $10.000 $12.490 $9.000
PRIME COAT (MC-30 OR EC-30)
GAL 4,952.000 $5.500 $4.400 $5.500 $5.420 $7.110
CONC PVMT (CONT REINF - CRCP) (13")
SY 5,994.000 $120.000 $125.210 $116.000 $116.000 $150.000
CEM STABIL BKFL
CY 1,637.000 $231.070 $97.720 $225.000 $190.000 $272.260
CEMENT STAB BACKFILL (INLET OR MH)
CY 151.000 $68.800 $215.020 $225.000 $190.000 $272.360
TRENCH EXCAVATION PROTECTION
LF 1,505.000 $5.550 $1.890 $22.000 $6.000 $70.000
TEMPORARY SPL SHORING
SF 840.000 $56.150 $31.650 $48.000 $61.280 $20.990
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 3.000 $87,263.440 $5,000.000 $30,000.000 $5,000.000 $50,000.000
DRILL SHAFT (18 IN)
LF 140.000 $132.460 $64.140 $150.000 $70.970 $130.120
DRILL SHAFT (36 IN)
LF 1,207.000 $330.000 $260.360 $294.000 $267.590 $430.860
DRILL SHAFT (48 IN)
LF 274.000 $520.460 $438.550 $506.000 $450.010 $609.000
DRILL SHAFT (60 IN)
LF 147.000 $750.000 $715.130 $741.000 $777.830 $979.630
DRILL SHAFT (SIGN MTS) (54 IN)
LF 23.000 $682.500 $750.000 $800.000 $746.130 $536.960
DRILL SHAFT (96 IN)
LF 158.000 $2,100.000 $1,787.230 $2,460.000 $1,848.500 $2,342.490
CL C CONC (ABUT)(HPC)
CY 64.200 $1,800.000 $1,100.000 $1,100.000 $1,899.780 $3,325.310
CL C CONC (CAP)(HPC)
CY 138.400 $1,400.000 $1,100.000 $1,430.000 $1,188.400 $3,962.870
CL C CONC (COLUMN)(HPC)
CY 153.600 $1,300.000 $1,101.600 $1,430.000 $1,152.740 $2,970.070
CL C CONC (COLUMN)(HPC)(MASS)
CY 84.800 $786.110 $1,200.000 $2,100.000 $1,123.090 $3,159.530
CL C CONC (FOOTING)
CY 17.500 $869.730 $1,400.000 $1,190.000 $789.250 $3,824.190
CL C CONC (RAIL FOUNDATION)
CY 53.000 $601.160 $440.000 $450.000 $665.880 $1,092.660
CL H CONC (PT CAP)(HPC)(MASS)
CY 450.100 $2,500.000 $1,400.000 $1,450.000 $1,140.010 $2,500.000
CL K CONC (MISC)
CY 3.600 $896.040 $3,382.660 $525.000 $1,076.920 $4,441.640
REINF CONC SLAB (HPC)
SF 38,474.000 $30.000 $20.690 $21.000 $24.580 $61.150
APPROACH SLAB (HPC)
CY 87.000 $767.390 $1,411.590 $820.000 $625.870 $1,282.030
RETAINING WALL (MSE)
SF 29,088.000 $70.000 $47.590 $38.000 $52.000 $70.000
PRESTR CONC GIRDER (TX54)
LF 2,897.820 $240.390 $242.760 $240.000 $230.910 $300.000
RIPRAP (CONC)(4 IN)
CY 385.400 $671.670 $538.810 $500.000 $561.890 $1,449.370
RIPRAP (STONE PROTECTION)(12 IN)
CY 6.000 $143.230 $280.640 $300.000 $184.400 $1,781.110
RIPRAP (MOW STRIP)(4 IN)
CY 76.000 $705.520 $1,458.410 $500.000 $556.730 $1,428.940
ELASTOMERIC BEARING (F6)
EA 12.000 $4,800.000 $6,609.580 $5,200.000 $6,750.560 $10,697.850
SLIDING ELASTOMERIC BEARING (ES 6)
EA 12.000 $4,700.000 $4,797.150 $6,800.000 $4,621.350 $7,881.640
STR STEEL (PLATE GIRDER)
LB 1,339,800.000 $2.540 $2.450 $2.490 $2.620 $3.250
STR STEEL (MISCELLANEOUS BRIDGE)
LB 86,080.000 $7.080 $2.440 $2.490 $2.220 $5.040
RAIL (TY SSTR)
LF 350.000 $55.560 $60.980 $110.000 $83.990 $119.170
RAIL (TY SSTR)(HPC)
LF 3,738.600 $100.000 $63.500 $100.000 $70.470 $127.500
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 284.000 $133.740 $174.960 $150.000 $118.380 $272.060
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 16.000 $979.210 $335.600 $700.000 $759.440 $1,220.400
RC PIPE (CL III)(24 IN)
LF 436.000 $106.560 $90.870 $124.000 $98.470 $380.620
RC PIPE (CL III)(30 IN)
LF 341.000 $126.050 $120.050 $147.000 $123.400 $617.800
RC PIPE (CL IV)(24 IN)
LF 31.000 $136.470 $176.600 $134.000 $135.910 $908.890
RC PIPE (CL IV)(30 IN)
LF 226.000 $198.000 $149.780 $156.000 $137.250 $606.950
RC PIPE (CL V)(18 IN)
LF 65.000 $106.610 $251.000 $111.000 $90.400 $585.590
RC PIPE (CL V)(24 IN)
LF 343.000 $162.480 $181.550 $142.000 $116.230 $917.390
INLET (COMPL)(FGR)(FTW)
EA 7.000 $8,000.000 $13,375.970 $5,800.000 $10,147.320 $23,999.100
INLT (COMPL)(AD)(4'X 4'-3' X 3')(FTW)
EA 1.000 $10,000.000 $4,062.500 $6,700.000 $6,104.890 $19,762.980
MANH (COMPL)(TY SD)(4'X 4'-3'X 3')(FTW)
EA 7.000 $10,000.000 $4,583.000 $6,900.000 $7,271.360 $19,836.370
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $27,772.600 $33,627.000 $24,500.000 $54,920.430 $41,746.500
REMOV STR (SET)
EA 1.000 $617.200 $545.390 $1,100.000 $487.940 $1,962.940
REMOV STR (HEADWALL)
EA 1.000 $1,589.660 $5,541.250 $12,226.570 $3,409.920 $4,082.400
REMOV STR (PIPE)
LF 109.000 $20.550 $24.860 $24.000 $26.320 $78.910
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $130,180.000 $162,720.000 $260,000.000 $250,000.000 $709,701.990
MOBILIZATION
LS 1.000 $1,812,599.480 $1,675,800.000 $1,879,624.100 $1,995,032.510 $2,876,870.570
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $5,000.000 $10,000.000 $12,500.000 $15,000.000 $2,620.900
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 30.000 $48.220 $40.000 $35.000 $43.580 $77.470
ROCK FILTER DAMS (REMOVE)
LF 30.000 $16.060 $20.000 $18.000 $21.790 $30.580
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 294.000 $28.460 $25.000 $36.000 $27.240 $44.390
CONSTRUCTION EXITS (REMOVE)
SY 294.000 $11.590 $12.500 $12.000 $13.620 $30.580
EXCAV (EROSN & SEDMT CONT, IN PLACE)
CY 1,200.000 $13.850 $21.400 $33.000 $24.210 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,874.000 $3.310 $1.900 $3.600 $2.070 $2.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,874.000 $0.940 $0.400 $1.000 $0.440 $1.380
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 220.000 $7.810 $5.150 $8.000 $5.610 $9.120
BIODEG EROSN CONT LOGS (REMOVE)
LF 220.000 $1.760 $1.000 $1.200 $1.090 $2.700
CONSTRUCTING DETOURS
SY 624.000 $88.580 $133.580 $200.000 $131.490 $127.390
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
LF 2,040.000 $26.510 $30.000 $52.000 $54.880 $146.560
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
LF 2,630.000 $5.670 $7.730 $11.000 $6.070 $9.490
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
LF 2,040.000 $7.250 $6.130 $17.000 $12.260 $14.400
MTL W-BEAM GD FEN (TIM POST)
LF 275.000 $29.620 $26.000 $27.000 $28.190 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,835.850 $1,850.000 $2,000.000 $2,035.940 $2,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,419.820 $1,300.000 $1,700.000 $1,759.260 $1,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,340.840 $2,800.000 $6,300.000 $3,236.630 $3,100.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $1,221.720 $1,300.000 $6,000.000 $1,148.480 $1,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,647.520 $1,239.730 $1,600.000 $1,307.770 $1,375.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,042.920 $619.860 $700.000 $1,046.220 $695.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $27,336.960 $28,079.300 $30,000.000 $30,224.830 $26,475.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $11,571.860 $4,637.620 $9,400.000 $8,078.000 $8,275.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 2.000 $2,187.470 $2,785.000 $3,000.000 $5,439.190 $1,500.000
CONDT (PVC) (SCH 40) (2")
LF 260.000 $27.150 $33.000 $35.000 $23.870 $11.500
CONDT (RM) (1")
LF 165.000 $37.730 $76.750 $85.000 $39.940 $35.000
ELEC CONDR (NO.8) BARE
LF 425.000 $2.840 $3.750 $4.000 $3.590 $1.500
ELEC CONDR (NO.8) INSULATED
LF 850.000 $3.000 $3.850 $4.000 $3.670 $1.700
ELEC CONDR (NO.6) BARE
LF 260.000 $3.990 $3.850 $4.000 $4.910 $2.000
ELEC CONDR (NO.6) INSULATED
LF 520.000 $3.990 $4.200 $5.000 $5.040 $2.100
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $733.820 $760.000 $1,600.000 $814.330 $690.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $918.660 $840.000 $1,700.000 $904.240 $920.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,596.930 $980.000 $2,000.000 $1,028.250 $1,600.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $3,172.090 $2,295.000 $4,500.000 $1,467.460 $3,200.000
REMOVE OVERHD SIGN SUP
EA 1.000 $10,799.900 $7,800.000 $8,000.000 $8,784.070 $7,800.000
REM & RELOCATE OVHD SIGN & SUP
EA 1.000 $15,000.000 $25,525.000 $26,000.000 $20,461.730 $20,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 22.000 $26.220 $18.000 $23.000 $21.930 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 15.000 $21.490 $18.000 $23.000 $21.930 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 3.000 $36.710 $18.500 $145.000 $46.980 $27.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 5.000 $20.000 $45.000 $114.000 $126.590 $97.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 14.000 $20.000 $45.000 $85.000 $126.590 $75.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 1,180.000 $1.050 $0.840 $1.140 $0.510 $0.990
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 7,830.000 $0.660 $0.550 $0.750 $0.510 $0.650
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 5,995.000 $0.720 $0.550 $0.750 $0.510 $0.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,560.000 $1.910 $1.080 $1.500 $1.240 $1.270
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 490.000 $4.370 $3.400 $6.000 $3.100 $3.990
REFL PAV MRK TY II (W) 4" (BRK)
LF 2,868.000 $0.520 $0.450 $0.400 $0.430 $0.530
REFL PAV MRK TY II (W) 4" (SLD)
LF 8,435.000 $0.490 $0.400 $0.400 $0.430 $0.470
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,560.000 $0.600 $0.720 $0.700 $0.730 $0.850
REFL PAV MRK TY II (W) 12" (SLD)
LF 490.000 $2.760 $2.700 $2.200 $2.530 $3.170
REFL PAV MRK TY II (Y) 4" (SLD)
LF 8,120.000 $0.570 $0.400 $0.400 $0.430 $0.470
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,868.000 $1.040 $0.700 $0.850 $1.020 $0.820
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,435.000 $0.550 $0.600 $0.810 $1.020 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 8,120.000 $0.740 $0.600 $0.810 $1.020 $0.700
REFL PAV MRKR TY II-C-R
EA 248.000 $4.820 $5.230 $11.000 $5.070 $6.140
ELIM EXT PAV MRK & MRKS (4")
LF 832.500 $0.410 $1.250 $1.140 $0.730 $1.470
ELIM EXT PAV MRK & MRKS (6")
LF 4,007.000 $0.460 $0.650 $1.140 $0.790 $0.760
ELIM EXT PAV MRK & MRKS (8")
LF 1,485.000 $0.800 $1.000 $1.140 $0.960 $1.170
ELIM EXT PAV MRK & MRKS (12")
LF 1,170.000 $1.880 $1.800 $4.200 $1.410 $2.110
PAV SURF PREP FOR MRK (4")
LF 19,423.000 $0.040 $0.090 $0.120 $0.280 $0.110
PAV SURF PREP FOR MRK (8")
LF 1,560.000 $0.120 $0.250 $0.100 $0.450 $0.290
PAV SURF PREP FOR MRK (12")
LF 490.000 $1.030 $1.100 $0.480 $0.620 $1.290
PAV SURF PREP FOR MRK (RPM)
EA 248.000 $1.770 $1.600 $1.000 $0.680 $1.880
D-GR HMA TY-B PG64-22
TON 10,151.000 $120.000 $102.750 $110.000 $112.320 $120.300
SP MIXES SP-C SAC-A PG70-28
TON 1,100.000 $148.830 $148.750 $177.000 $179.740 $188.320
TACK COAT
GAL 1,910.000 $4.060 $1.500 $7.000 $6.650 $4.570
TIP TESTING(DRILL SHAFT)
EA 3.000 $3,781.250 $5,000.000 $5,000.000 $5,508.230 $5,560.420
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,882.350 $14,000.000 $26,000.000 $12,600.500 $17,627.750
GROUND BOX (PREPARE)
EA 2.000 $725.450 $985.000 $1,000.000 $865.330 $221.430
TMA (STATIONARY)
DAY 90.000 $191.140 $920.000 $250.000 $175.000 $189.540
TMA (MOBILE OPERATION)
HR 90.000 $72.020 $500.000 $130.000 $75.000 $77.540
Totals: $20,028,594.254 $18,792,214.676 $18,818,343.360 $19,950,325.112 $30,632,675.998