PREPARING ROW
|
STA
|
31.340
|
$6,275.070
|
$58,763.140
|
$12,500.000
|
$52,525.450
|
$92,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
11,854.000
|
$16.000
|
$6.900
|
$11.000
|
$11.310
|
$8.200
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
44,676.000
|
$18.000
|
$9.140
|
$20.000
|
$13.800
|
$18.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
27,328.000
|
$14.570
|
$7.200
|
$8.000
|
$20.790
|
$23.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
15,234.000
|
$45.000
|
$97.860
|
$85.000
|
$66.670
|
$68.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
613.000
|
$80.000
|
$56.190
|
$90.000
|
$73.870
|
$220.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
34,473.000
|
$0.160
|
$0.110
|
$0.300
|
$3.200
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
1,207.000
|
$39.740
|
$20.800
|
$35.000
|
$15.000
|
$50.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
207.000
|
$280.370
|
$289.000
|
$307.000
|
$295.000
|
$614.930
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
12,383.000
|
$8.010
|
$3.330
|
$3.000
|
$4.770
|
$11.910
|
|
|
CEMENT
|
TON
|
58.000
|
$233.240
|
$303.450
|
$310.000
|
$230.000
|
$611.350
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
4,128.000
|
$20.000
|
$3.330
|
$4.000
|
$3.720
|
$27.010
|
|
|
SALV, HAUL & STKPL RCL APH PV (5 TO 9")
|
SY
|
2,381.000
|
$7.000
|
$4.780
|
$10.000
|
$12.490
|
$9.000
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
4,952.000
|
$5.500
|
$4.400
|
$5.500
|
$5.420
|
$7.110
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
5,994.000
|
$120.000
|
$125.210
|
$116.000
|
$116.000
|
$150.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,637.000
|
$231.070
|
$97.720
|
$225.000
|
$190.000
|
$272.260
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
151.000
|
$68.800
|
$215.020
|
$225.000
|
$190.000
|
$272.360
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,505.000
|
$5.550
|
$1.890
|
$22.000
|
$6.000
|
$70.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
840.000
|
$56.150
|
$31.650
|
$48.000
|
$61.280
|
$20.990
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
3.000
|
$87,263.440
|
$5,000.000
|
$30,000.000
|
$5,000.000
|
$50,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
140.000
|
$132.460
|
$64.140
|
$150.000
|
$70.970
|
$130.120
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,207.000
|
$330.000
|
$260.360
|
$294.000
|
$267.590
|
$430.860
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
274.000
|
$520.460
|
$438.550
|
$506.000
|
$450.010
|
$609.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
147.000
|
$750.000
|
$715.130
|
$741.000
|
$777.830
|
$979.630
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
23.000
|
$682.500
|
$750.000
|
$800.000
|
$746.130
|
$536.960
|
|
|
DRILL SHAFT (96 IN)
|
LF
|
158.000
|
$2,100.000
|
$1,787.230
|
$2,460.000
|
$1,848.500
|
$2,342.490
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
64.200
|
$1,800.000
|
$1,100.000
|
$1,100.000
|
$1,899.780
|
$3,325.310
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
138.400
|
$1,400.000
|
$1,100.000
|
$1,430.000
|
$1,188.400
|
$3,962.870
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
153.600
|
$1,300.000
|
$1,101.600
|
$1,430.000
|
$1,152.740
|
$2,970.070
|
|
|
CL C CONC (COLUMN)(HPC)(MASS)
|
CY
|
84.800
|
$786.110
|
$1,200.000
|
$2,100.000
|
$1,123.090
|
$3,159.530
|
|
|
CL C CONC (FOOTING)
|
CY
|
17.500
|
$869.730
|
$1,400.000
|
$1,190.000
|
$789.250
|
$3,824.190
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
53.000
|
$601.160
|
$440.000
|
$450.000
|
$665.880
|
$1,092.660
|
|
|
CL H CONC (PT CAP)(HPC)(MASS)
|
CY
|
450.100
|
$2,500.000
|
$1,400.000
|
$1,450.000
|
$1,140.010
|
$2,500.000
|
|
|
CL K CONC (MISC)
|
CY
|
3.600
|
$896.040
|
$3,382.660
|
$525.000
|
$1,076.920
|
$4,441.640
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
38,474.000
|
$30.000
|
$20.690
|
$21.000
|
$24.580
|
$61.150
|
|
|
APPROACH SLAB (HPC)
|
CY
|
87.000
|
$767.390
|
$1,411.590
|
$820.000
|
$625.870
|
$1,282.030
|
|
|
RETAINING WALL (MSE)
|
SF
|
29,088.000
|
$70.000
|
$47.590
|
$38.000
|
$52.000
|
$70.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,897.820
|
$240.390
|
$242.760
|
$240.000
|
$230.910
|
$300.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
385.400
|
$671.670
|
$538.810
|
$500.000
|
$561.890
|
$1,449.370
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
6.000
|
$143.230
|
$280.640
|
$300.000
|
$184.400
|
$1,781.110
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
76.000
|
$705.520
|
$1,458.410
|
$500.000
|
$556.730
|
$1,428.940
|
|
|
ELASTOMERIC BEARING (F6)
|
EA
|
12.000
|
$4,800.000
|
$6,609.580
|
$5,200.000
|
$6,750.560
|
$10,697.850
|
|
|
SLIDING ELASTOMERIC BEARING (ES 6)
|
EA
|
12.000
|
$4,700.000
|
$4,797.150
|
$6,800.000
|
$4,621.350
|
$7,881.640
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
1,339,800.000
|
$2.540
|
$2.450
|
$2.490
|
$2.620
|
$3.250
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
86,080.000
|
$7.080
|
$2.440
|
$2.490
|
$2.220
|
$5.040
|
|
|
RAIL (TY SSTR)
|
LF
|
350.000
|
$55.560
|
$60.980
|
$110.000
|
$83.990
|
$119.170
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
3,738.600
|
$100.000
|
$63.500
|
$100.000
|
$70.470
|
$127.500
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
284.000
|
$133.740
|
$174.960
|
$150.000
|
$118.380
|
$272.060
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
16.000
|
$979.210
|
$335.600
|
$700.000
|
$759.440
|
$1,220.400
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
436.000
|
$106.560
|
$90.870
|
$124.000
|
$98.470
|
$380.620
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
341.000
|
$126.050
|
$120.050
|
$147.000
|
$123.400
|
$617.800
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
31.000
|
$136.470
|
$176.600
|
$134.000
|
$135.910
|
$908.890
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
226.000
|
$198.000
|
$149.780
|
$156.000
|
$137.250
|
$606.950
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
65.000
|
$106.610
|
$251.000
|
$111.000
|
$90.400
|
$585.590
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
343.000
|
$162.480
|
$181.550
|
$142.000
|
$116.230
|
$917.390
|
|
|
INLET (COMPL)(FGR)(FTW)
|
EA
|
7.000
|
$8,000.000
|
$13,375.970
|
$5,800.000
|
$10,147.320
|
$23,999.100
|
|
|
INLT (COMPL)(AD)(4'X 4'-3' X 3')(FTW)
|
EA
|
1.000
|
$10,000.000
|
$4,062.500
|
$6,700.000
|
$6,104.890
|
$19,762.980
|
|
|
MANH (COMPL)(TY SD)(4'X 4'-3'X 3')(FTW)
|
EA
|
7.000
|
$10,000.000
|
$4,583.000
|
$6,900.000
|
$7,271.360
|
$19,836.370
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$27,772.600
|
$33,627.000
|
$24,500.000
|
$54,920.430
|
$41,746.500
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$617.200
|
$545.390
|
$1,100.000
|
$487.940
|
$1,962.940
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,589.660
|
$5,541.250
|
$12,226.570
|
$3,409.920
|
$4,082.400
|
|
|
REMOV STR (PIPE)
|
LF
|
109.000
|
$20.550
|
$24.860
|
$24.000
|
$26.320
|
$78.910
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$130,180.000
|
$162,720.000
|
$260,000.000
|
$250,000.000
|
$709,701.990
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,812,599.480
|
$1,675,800.000
|
$1,879,624.100
|
$1,995,032.510
|
$2,876,870.570
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$5,000.000
|
$10,000.000
|
$12,500.000
|
$15,000.000
|
$2,620.900
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
30.000
|
$48.220
|
$40.000
|
$35.000
|
$43.580
|
$77.470
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
30.000
|
$16.060
|
$20.000
|
$18.000
|
$21.790
|
$30.580
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
294.000
|
$28.460
|
$25.000
|
$36.000
|
$27.240
|
$44.390
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
294.000
|
$11.590
|
$12.500
|
$12.000
|
$13.620
|
$30.580
|
|
|
EXCAV (EROSN & SEDMT CONT, IN PLACE)
|
CY
|
1,200.000
|
$13.850
|
$21.400
|
$33.000
|
$24.210
|
$14.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,874.000
|
$3.310
|
$1.900
|
$3.600
|
$2.070
|
$2.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,874.000
|
$0.940
|
$0.400
|
$1.000
|
$0.440
|
$1.380
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
220.000
|
$7.810
|
$5.150
|
$8.000
|
$5.610
|
$9.120
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
220.000
|
$1.760
|
$1.000
|
$1.200
|
$1.090
|
$2.700
|
|
|
CONSTRUCTING DETOURS
|
SY
|
624.000
|
$88.580
|
$133.580
|
$200.000
|
$131.490
|
$127.390
|
|
|
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
|
LF
|
2,040.000
|
$26.510
|
$30.000
|
$52.000
|
$54.880
|
$146.560
|
|
|
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
|
LF
|
2,630.000
|
$5.670
|
$7.730
|
$11.000
|
$6.070
|
$9.490
|
|
|
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
|
LF
|
2,040.000
|
$7.250
|
$6.130
|
$17.000
|
$12.260
|
$14.400
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
275.000
|
$29.620
|
$26.000
|
$27.000
|
$28.190
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,835.850
|
$1,850.000
|
$2,000.000
|
$2,035.940
|
$2,100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,419.820
|
$1,300.000
|
$1,700.000
|
$1,759.260
|
$1,200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,340.840
|
$2,800.000
|
$6,300.000
|
$3,236.630
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
5.000
|
$1,221.720
|
$1,300.000
|
$6,000.000
|
$1,148.480
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,647.520
|
$1,239.730
|
$1,600.000
|
$1,307.770
|
$1,375.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,042.920
|
$619.860
|
$700.000
|
$1,046.220
|
$695.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$27,336.960
|
$28,079.300
|
$30,000.000
|
$30,224.830
|
$26,475.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$11,571.860
|
$4,637.620
|
$9,400.000
|
$8,078.000
|
$8,275.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
2.000
|
$2,187.470
|
$2,785.000
|
$3,000.000
|
$5,439.190
|
$1,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
260.000
|
$27.150
|
$33.000
|
$35.000
|
$23.870
|
$11.500
|
|
|
CONDT (RM) (1")
|
LF
|
165.000
|
$37.730
|
$76.750
|
$85.000
|
$39.940
|
$35.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
425.000
|
$2.840
|
$3.750
|
$4.000
|
$3.590
|
$1.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
850.000
|
$3.000
|
$3.850
|
$4.000
|
$3.670
|
$1.700
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
260.000
|
$3.990
|
$3.850
|
$4.000
|
$4.910
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
520.000
|
$3.990
|
$4.200
|
$5.000
|
$5.040
|
$2.100
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$733.820
|
$760.000
|
$1,600.000
|
$814.330
|
$690.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$918.660
|
$840.000
|
$1,700.000
|
$904.240
|
$920.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,596.930
|
$980.000
|
$2,000.000
|
$1,028.250
|
$1,600.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$3,172.090
|
$2,295.000
|
$4,500.000
|
$1,467.460
|
$3,200.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$10,799.900
|
$7,800.000
|
$8,000.000
|
$8,784.070
|
$7,800.000
|
|
|
REM & RELOCATE OVHD SIGN & SUP
|
EA
|
1.000
|
$15,000.000
|
$25,525.000
|
$26,000.000
|
$20,461.730
|
$20,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
22.000
|
$26.220
|
$18.000
|
$23.000
|
$21.930
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
15.000
|
$21.490
|
$18.000
|
$23.000
|
$21.930
|
$23.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
3.000
|
$36.710
|
$18.500
|
$145.000
|
$46.980
|
$27.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
5.000
|
$20.000
|
$45.000
|
$114.000
|
$126.590
|
$97.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
14.000
|
$20.000
|
$45.000
|
$85.000
|
$126.590
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
1,180.000
|
$1.050
|
$0.840
|
$1.140
|
$0.510
|
$0.990
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
7,830.000
|
$0.660
|
$0.550
|
$0.750
|
$0.510
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
5,995.000
|
$0.720
|
$0.550
|
$0.750
|
$0.510
|
$0.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,560.000
|
$1.910
|
$1.080
|
$1.500
|
$1.240
|
$1.270
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
490.000
|
$4.370
|
$3.400
|
$6.000
|
$3.100
|
$3.990
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
2,868.000
|
$0.520
|
$0.450
|
$0.400
|
$0.430
|
$0.530
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
8,435.000
|
$0.490
|
$0.400
|
$0.400
|
$0.430
|
$0.470
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,560.000
|
$0.600
|
$0.720
|
$0.700
|
$0.730
|
$0.850
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
490.000
|
$2.760
|
$2.700
|
$2.200
|
$2.530
|
$3.170
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
8,120.000
|
$0.570
|
$0.400
|
$0.400
|
$0.430
|
$0.470
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,868.000
|
$1.040
|
$0.700
|
$0.850
|
$1.020
|
$0.820
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
8,435.000
|
$0.550
|
$0.600
|
$0.810
|
$1.020
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
8,120.000
|
$0.740
|
$0.600
|
$0.810
|
$1.020
|
$0.700
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
248.000
|
$4.820
|
$5.230
|
$11.000
|
$5.070
|
$6.140
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
832.500
|
$0.410
|
$1.250
|
$1.140
|
$0.730
|
$1.470
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
4,007.000
|
$0.460
|
$0.650
|
$1.140
|
$0.790
|
$0.760
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,485.000
|
$0.800
|
$1.000
|
$1.140
|
$0.960
|
$1.170
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,170.000
|
$1.880
|
$1.800
|
$4.200
|
$1.410
|
$2.110
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
19,423.000
|
$0.040
|
$0.090
|
$0.120
|
$0.280
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,560.000
|
$0.120
|
$0.250
|
$0.100
|
$0.450
|
$0.290
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
490.000
|
$1.030
|
$1.100
|
$0.480
|
$0.620
|
$1.290
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
248.000
|
$1.770
|
$1.600
|
$1.000
|
$0.680
|
$1.880
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
10,151.000
|
$120.000
|
$102.750
|
$110.000
|
$112.320
|
$120.300
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
1,100.000
|
$148.830
|
$148.750
|
$177.000
|
$179.740
|
$188.320
|
|
|
TACK COAT
|
GAL
|
1,910.000
|
$4.060
|
$1.500
|
$7.000
|
$6.650
|
$4.570
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
3.000
|
$3,781.250
|
$5,000.000
|
$5,000.000
|
$5,508.230
|
$5,560.420
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,882.350
|
$14,000.000
|
$26,000.000
|
$12,600.500
|
$17,627.750
|
|
|
GROUND BOX (PREPARE)
|
EA
|
2.000
|
$725.450
|
$985.000
|
$1,000.000
|
$865.330
|
$221.430
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$191.140
|
$920.000
|
$250.000
|
$175.000
|
$189.540
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
90.000
|
$72.020
|
$500.000
|
$130.000
|
$75.000
|
$77.540
|
|
Totals: |
$20,028,594.254
|
$18,792,214.676
|
$18,818,343.360
|
$19,950,325.112
|
$30,632,675.998
|