Show Job Controls
Bid Cobra

TARRANT IH 20 (0008-13-238)

Items: 57

County: TARRANT
Length: N/A
Highway: IH 20
District: FORT WORTH
Control Number: 0008-13-238
DBE Goal: N/A
Project: STP 2016(994)HES
Guaranty: N/A
Time: 89 WORKING DAYS
Engineer's Estimate: $2,140,580.00
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: CONVERT MEDIAN BARRIER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,140,580.00
$2,096,043.23
Over/Under Est: -2.08% -$44,536.77
Over/Under Est: 31.27% $669,445.15
Amt Left: 34.06% $713,981.92
Over/Under Est: 61.38% $1,313,811.50
Amt Left: 64.81% $1,358,348.27
Delta: -22.93% -$644,366.35

Bid Items & Bid Tabulations

57 Total 0 of 57
TARRANT  |  IH 20  |  FORT WORTH  |  0008-13-238  |  04/02/2019  |  $2,140,580.00  |  STP 2016(994)HES  |  CONVERT MEDIAN BARRIER  |  89 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALTUS CONSTRUCTION LLC
ED BELL CONSTRUCTION COMPANY
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 360.000 $20.000 $14.660 $42.000 $50.000
EXCAVATION (CHANNEL)
CY 1,650.000 $7.500 $18.320 $21.000 $97.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 100.000 $100.000 $26.760 $52.500 $97.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 2,500.000 $0.100 $0.390 $7.350 $97.000
PLANE ASPH CONC PAV(0" TO 6")
SY 1,520.000 $10.000 $24.520 $25.200 $31.000
TRENCH EXCAVATION PROTECTION
LF 180.000 $20.000 $6.110 $21.000 $30.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $200.000 $433.210 $210.000 $296.000
RIPRAP (CONC)(5 IN)
CY 50.000 $500.000 $536.540 $735.000 $675.000
RC PIPE (CL III)(18 IN)
LF 56.000 $80.000 $73.810 $210.000 $341.000
RC PIPE (CL III)(24 IN)
LF 16.000 $100.000 $109.860 $315.000 $341.000
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
EA 3.000 $5,000.000 $7,707.930 $6,300.000 $6,500.000
INLET(COMPL)(DROP)(TY 1 )(2 GRATE)
EA 3.000 $6,000.000 $11,688.590 $6,825.000 $8,500.000
INLET(COMPL)(DROP)(TY 1)(3 GRATE)
EA 3.000 $7,000.000 $14,794.650 $7,350.000 $12,000.000
INLET (COMPL)(MEDIAN)
EA 9.000 $8,000.000 $8,282.140 $11,550.000 $14,800.000
MOBILIZATION
LS 1.000 $210,000.000 $200,831.200 $275,000.000 $210,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $7,500.000 $8,450.660 $33,333.330 $41,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 300.000 $25.000 $25.420 $21.000 $15.550
CONSTRUCTION EXITS (REMOVE)
SY 300.000 $10.000 $12.870 $10.500 $11.200
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $5.000 $3.920 $1.520 $1.550
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $1.000 $0.930 $0.110 $0.850
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 600.000 $8.000 $7.860 $3.780 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $2.000 $2.190 $1.050 $0.600
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 11,730.000 $16.000 $7.360 $10.500 $17.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 11,730.000 $16.000 $7.360 $10.500 $17.000
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 2,845.000 $100.000 $101.450 $168.000 $158.000
PERM CTB (SGL SLOPE) (TY 3) (54 )
LF 80.000 $400.000 $346.570 $420.000 $411.000
PERM CTB (SGL SLOPE) (TY 4) (54 )
LF 70.000 $200.000 $346.570 $630.000 $426.000
PERM CTB (TRAN SSCB TO CTB) (MOD)
LF 20.000 $250.000 $249.530 $630.000 $426.000
PERM CTB (SGL SLOPE) (RETAINING WALL)
LF 20.000 $500.000 $623.830 $630.000 $899.000
PERM CTB (TRAN SSCB TO PARAPET)
LF 20.000 $300.000 $256.460 $630.000 $899.000
PERM CTB (SGL SLOPE) (TY 1) SPECIAL
LF 1,432.000 $200.000 $120.780 $168.000 $298.000
PERM CTB (SGL SLOPE) (TY 3) SPECIAL
LF 50.000 $400.000 $222.830 $420.000 $411.000
PERM CTB (SGL SLOPE) (TY 4) SPECIAL
LF 70.000 $200.000 $257.110 $630.000 $426.000
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
LF 275.000 $250.000 $188.550 $630.000 $513.500
REMOVE METAL BEAM GUARD FENCE
LF 6,875.000 $5.000 $4.070 $6.300 $3.350
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $1,000.000 $289.830 $630.000 $280.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $500.000 $281.460 $630.000 $280.000
CRASH CUSH ATTEN (INSTL)
EA 3.000 $12,000.000 $12,789.440 $15,750.000 $14,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 20.000 $2,500.000 $1,698.290 $4,200.000 $7,500.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $2,000.000 $2,247.450 $1,155.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $40,000.000 $28,289.690 $21,000.000 $36,300.000
REMOVE RD IL ASM (SHOE-BASE)
EA 7.000 $600.000 $1,062.600 $575.000 $310.000
REMOVE RD IL ASM (TRANS-BASE)
EA 9.000 $1,100.000 $1,381.380 $915.000 $310.000
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
EA 7.000 $5,000.000 $8,072.480 $7,350.000 $5,000.000
IN RD IL (TY SP) 48S-10 (400W EQ) LED
EA 8.000 $4,000.000 $5,747.840 $7,350.000 $4,100.000
IN RD IL (TY SA) 50T-8-8 (400W EQ) LED
EA 2.000 $4,200.000 $7,307.410 $7,350.000 $4,500.000
CONDT (PVC) (SCH 40) (2")
LF 3,710.000 $15.000 $14.600 $15.750 $12.150
ELEC CONDR (NO.8) BARE
LF 3,865.000 $2.000 $2.400 $1.570 $1.350
ELEC CONDR (NO.8) INSULATED
LF 7,730.000 $3.000 $2.600 $1.570 $1.450
GROUND BOX TY C (162911)W/APRON
EA 2.000 $1,500.000 $1,873.640 $1,365.000 $1,900.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 119.000 $30.000 $23.980 $18.580 $16.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.300 $3,000.000 $15,530.290 $84,000.000 $8,000.000
STORM SEWER CLEANING (ALL SIZES)
LF 1,359.000 $50.000 $30.650 $63.000 $12.000
STORM SEWER CLEAN (BOX CULV)(ALL SIZES)
LF 172.000 $50.000 $61.300 $126.000 $12.000
DRAIN INLET CLEANING (BY LOCATION)
EA 11.000 $500.000 $674.340 $1,155.000 $600.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 236.000 $100.000 $147.300 $157.500 $170.000
TMA (STATIONARY)
EA 8.000 $10,000.000 $34,525.380 $7,500.000 $22,000.000
Totals: $2,140,580.000 $2,096,043.237 $2,810,025.150 $3,454,391.500