TARRANT IH 20 (0008-12-099)

Items: 64

County: TARRANT
Length: N/A
Highway: IH 20
District: FORT WORTH
Control Number: 0008-12-099
DBE Goal: 0.0%
Project: C 8-12-99
Guaranty: N/A
Time: 278 WORKING DAYS
Engineer's Estimate: $4,117,662.45
Date: 04/05/2024 (2 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
MARIBEL RANGEL
CYNTHIA DELAGARZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$4,117,662.45
Over/Under Est: 1.89% $77,789.67
Over/Under Est: 7.65% $315,131.73
Amt Left: 5.66% $237,342.06
Over/Under Est: 8.86% $364,747.10
Amt Left: 6.84% $286,957.43
Delta: -1.12% -$49,615.37
$4,804,260.00
Over/Under Est: 16.67% $686,597.55
Amt Left: 14.51% $608,807.88
Delta: -7.18% -$321,850.45
Subcontractor Percentage Amount
SYNERGY SIGNS & SERVICES LLC 9.89% $426,075.00
JAMESBOY, LLC 4.37% $188,265.70
TRP CONSTRUCTION GROUP, LLC 0.99% $42,650.58
HDZ CONSTRUCTION 0.53% $22,833.14
Total: 15.78% $679,824.42

Bid Items & Bid Tabulations

64 Total 0 of 64
TARRANT  |  IH 20  |  FORT WORTH  |  0008-12-099  |  04/05/2024  |  $4,117,662.45  |  C 8-12-99  |  PREVENT MAINT  |  278 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
RAGLE CONSTRUCTION, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
FNH CONSTRUCTION, LLC
CL C CONC (RAIL FOUNDATION)
CY 337.000 $1,300.000 $1,286.490 $966.000 $1,600.000 $2,000.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 2,138.000 $30.000 $13.960 $5.950 $12.000 $10.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 146.000 $250.000 $90.070 $100.000 $300.000 $500.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 56.000 $400.000 $166.000 $150.000 $300.000 $650.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 191.000 $300.000 $330.670 $150.000 $300.000 $500.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 3,574.000 $50.000 $50.580 $35.000 $75.000 $10.000
RESIZING AND SEALING JOINTS
LF 422.000 $60.000 $115.080 $55.000 $100.000 $100.000
MOBILIZATION
LS 1.000 $347,132.410 $419,545.000 $440,000.000 $440,000.000 $480,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $20,000.000 $16,292.180 $84,000.000 $5,000.000 $10,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,310.000 $3.130 $3.500 $3.500 $6.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,310.000 $1.370 $1.000 $1.000 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 722.000 $8.000 $5.000 $5.000 $15.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 722.000 $4.000 $1.250 $1.250 $5.000 $9.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 930.000 $125.000 $116.420 $88.000 $125.000 $100.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 6,320.000 $25.000 $29.910 $25.000 $30.000 $20.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 60.000 $37.000 $307.640 $27.000 $100.000 $30.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 20.000 $40.000 $857.920 $27.000 $100.000 $30.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 930.000 $35.000 $41.420 $15.000 $50.000 $20.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 5,800.000 $200.000 $178.750 $165.000 $280.000 $225.000
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 325.000 $250.000 $298.000 $201.000 $360.000 $300.000
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
LF 60.000 $450.000 $435.870 $135.000 $360.000 $300.000
PERM CTB (TRAN SSCB TO T501)(MOD)
LF 200.000 $450.000 $345.110 $121.000 $360.000 $300.000
PERM CTB (TRAN SSCB TO C201)
LF 40.000 $450.000 $515.550 $121.000 $350.000 $300.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 19.000 $2,300.000 $2,784.430 $1,875.000 $1,200.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 4,215.000 $4.000 $6.040 $3.000 $5.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $150.000 $655.210 $150.000 $300.000 $500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $145.000 $1,422.500 $125.000 $300.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 19.000 $3,000.000 $3,784.430 $2,875.000 $1,200.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $300.000 $683.370 $250.000 $350.000 $1,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 18.000 $2,325.580 $1,521.010 $1,407.260 $1,800.000 $6,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $914.240 $1,548.890 $1,870.340 $1,000.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $46,170.200 $42,897.060 $35,100.000 $41,000.000 $30,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $11,574.720 $11,747.040 $10,000.000 $30,000.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 2,132.000 $60.000 $36.870 $40.000 $30.000 $40.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,300.000 $3,125.420 $2,500.000 $500.000 $5,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 4.000 $2,500.000 $2,812.710 $2,500.000 $500.000 $5,000.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 46.000 $1,800.000 $4,785.890 $3,500.000 $200.000 $4,500.000
REMOVE SM RD SN SUP&AM
EA 5.000 $450.000 $480.170 $150.000 $200.000 $50.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 6.000 $500.000 $1,075.140 $750.000 $1,500.000 $1,500.000
REMOVE SIGN WALKWAY
EA 3.000 $3,000.000 $3,275.140 $3,500.000 $2,000.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 348.000 $30.000 $14.650 $20.000 $12.000 $100.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 350.000 $30.000 $14.610 $20.000 $12.000 $100.000
REFL PAV MRKR TY II-C-R
EA 190.000 $7.000 $11.840 $10.000 $12.000 $6.000
ELIM EXT PAV MRK & MRKS (6")
LF 23,797.000 $1.000 $0.530 $1.000 $1.250 $2.000
ELIM EXT PAV MRK & MRKS (8")
LF 1,630.000 $1.410 $1.450 $1.200 $1.500 $2.000
ELIM EXT PAV MRK & MRKS (12")
LF 64.000 $1.670 $15.200 $3.000 $3.500 $2.000
PAV SURF PREP FOR MRK (6")
LF 23,797.000 $0.500 $0.080 $0.500 $1.000 $1.000
PAV SURF PREP FOR MRK (8")
LF 1,630.000 $0.890 $0.600 $0.850 $1.200 $1.000
PAV SURF PREP FOR MRK (12")
LF 244.000 $3.000 $3.760 $1.000 $1.200 $1.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 10.000 $200.000 $156.870 $150.000 $550.000 $1,000.000
BRIDGE JOINT REPAIR (SEJ)
LF 226.000 $207.500 $214.600 $74.000 $150.000 $200.000
CONCRETE BEAM REPAIR (CFRP)
EA 3.000 $20,000.000 $22,486.720 $13,800.000 $25,000.000 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $15,000.000 $20,896.780 $25,000.000 $10,000.000 $16,500.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 10,007.000 $1.500 $0.930 $1.380 $1.500 $2.000
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 1,910.000 $1.500 $1.530 $1.650 $2.000 $2.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 1,630.000 $2.000 $2.060 $2.720 $3.000 $6.000
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 244.000 $8.000 $10.630 $7.980 $9.000 $6.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 9,970.000 $1.500 $0.930 $1.350 $1.500 $3.000
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 1,910.000 $2.000 $1.930 $2.200 $2.500 $3.000
TMA (STATIONARY)
DAY 353.000 $288.520 $333.160 $384.000 $250.000 $250.000
INSTL LINEAR DELIN SYS(LDS)(6")(Y)(CTB)
EA 1,274.000 $55.000 $60.410 $60.500 $55.000 $100.000
INSTL LINEAR DELIN SYS(LDS)(6")(W)(CTB)
EA 228.000 $55.000 $64.180 $60.500 $55.000 $100.000
INSTL LIN DELIN SYS(LDS)(1.5")(Y)(GF)
EA 30.000 $55.000 $86.230 $50.000 $55.000 $100.000
INSTL LIN DELIN SYS(LDS)(1.5")(W)(GF)
EA 15.000 $55.000 $86.230 $50.000 $55.000 $100.000
Totals: $4,117,662.450 $4,195,452.120 $4,432,794.180 $4,482,409.550 $4,804,260.000