Show Job Controls
Bid Cobra

TARRANT IH 20 (0008-12-094)

Items: 73

County: TARRANT
Length: N/A
Highway: IH 20
District: FORT WORTH
Control Number: 0008-12-094
DBE Goal: N/A
Project: C 8-12-94
Guaranty: N/A
Time: 214 WORKING DAYS
Engineer's Estimate: $6,877,584.00
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
DAVID NEELEY
JEREMY ARREGUIN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,877,584.00
$6,688,663.45
Over/Under Est: -2.75% -$188,920.55
Over/Under Est: 5.04% $346,416.00
Amt Left: 8% $535,336.55
Subcontractor Percentage Amount
SKIDABRADER GROUP LLC 22.52% $1,508,779.97
ACT SAW CUTTING & REMOVAL 16.61% $1,112,825.73
TRAFFIC HIGHWAY MAINTENANCE, LLC 9.28% $621,735.26
STRAIGHT LINE SAWING & SEALING, INC. 8.71% $583,546.78
RAGLE CONSTRUCTION, INC. 3.40% $227,790.94
SURFACE PREPARATION TECHNOLOGIES, LLC 0.89% $59,627.63
H TORRES TRUCKING, L.L.C. 0.22% $14,739.41
Total: 61.63% $4,129,045.72

Bid Items & Bid Tabulations

73 Total 0 of 73
TARRANT  |  IH 20  |  FORT WORTH  |  0008-12-094  |  05/04/2023  |  $6,877,584.00  |  C 8-12-94  |  REHAB EXIST ROADWAY  |  214 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SELECT MAINTENANCE, L.L.C.
O. TREVINO CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 364.000 $50.000 $12.500 $27.590
EXCAVATION (SPECIAL)
CY 208.000 $60.000 $20.000 $38.440
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 208.000 $100.000 $20.000 $90.640
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
CY 500.000 $1,000.000 $1,000.000 $1,100.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 16.000 $200.000 $350.000 $573.350
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 24.000 $250.000 $500.000 $391.200
RIPRAP (CONC)(CL C)
CY 201.000 $1,200.000 $530.000 $735.220
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 10,229.000 $40.000 $25.000 $57.400
CLEANING AND SEALING JOINTS
LF 1,210.000 $40.000 $25.000 $12.100
RESIZING AND SEALING JOINTS
LF 2,450.000 $80.000 $32.000 $70.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 869.000 $75.000 $90.000 $325.000
RAIL (TY SSTR) (W/DRAIN SLOTS) (MOD)
LF 128.000 $200.000 $105.000 $350.000
RAIL (TY T80SS) W/DRAIN SLOTS
LF 630.000 $225.000 $115.000 $400.000
MOBILIZATION
LS 1.000 $640,000.000 $665,000.000 $720,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $15,000.000 $66,000.000 $39,330.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 240.000 $30.000 $30.000 $240.000
CONSTRUCTION EXITS (REMOVE)
SY 240.000 $10.000 $12.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $4.000 $3.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $1.000 $1.000 $0.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $10.000 $7.500 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $2.000 $1.000 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,520.000 $75.000 $150.000 $90.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,520.000 $15.000 $15.000 $20.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 30.000 $200.000 $265.000 $500.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 65.000 $200.000 $335.000 $525.000
PERM CTB (SGL SLOPE) (MOD)
LF 18.000 $1,250.000 $295.000 $600.000
RUMBLE STRIPS (SHOULDER)
LF 90,150.000 $0.250 $0.600 $0.710
REMOVE METAL BEAM GUARD FENCE
LF 1,907.000 $3.000 $6.000 $3.300
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $500.000 $329.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $250.000 $500.000 $275.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $300.000 $500.000 $326.810
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $300.000 $500.000 $385.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $1,500.000 $850.000 $500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $10,000.000 $13,750.000 $10,000.000
CRASH CUSHION ATTEN (INSTALL)(REACT)(N)
EA 6.000 $35,000.000 $28,000.000 $34,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 23.000 $20.000 $12.000 $6.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1,600.000 $20.000 $12.000 $6.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 754.000 $1.500 $7.770 $1.400
PAVEMENT SEALER (SYMBOL)
EA 5.000 $100.000 $400.000 $100.000
PREFAB PAV MRK TY B (W)(LNDP ARROW)
EA 2.000 $4,000.000 $1,800.000 $2,500.000
PREFAB PAV MRK TY B (MULTI)(SHIELD)
EA 5.000 $4,000.000 $4,400.000 $3,000.000
REFL PAV MRKR TY II-C-R
EA 6,910.000 $6.000 $5.110 $4.600
ELIM EXT PAV MRK & MRKS (4")
LF 201,658.000 $0.350 $0.260 $0.200
ELIM EXT PAV MRK & MRKS (6")
LF 133,940.000 $0.500 $0.300 $0.200
ELIM EXT PAV MRK & MRKS (8")
LF 53,360.000 $0.750 $0.550 $0.400
ELIM EXT PAV MRK & MRKS (12")
LF 2,613.000 $1.000 $2.000 $1.750
ELIM EXT PAV MRK & MRKS (ARROW)
EA 7.000 $200.000 $82.000 $50.000
ELIM EXT PAV MRK & MRKS (NUMBER)
EA 20.000 $150.000 $57.000 $125.000
ELIM EXT PAV MRK & MRKS (SHEILD)
EA 5.000 $150.000 $485.000 $250.000
PAV SURF PREP FOR MRK (6")
LF 335,598.000 $0.250 $0.001 $0.010
PAV SURF PREP FOR MRK (8")
LF 53,360.000 $0.500 $0.001 $0.020
PAV SURF PREP FOR MRK (12")
LF 13,566.000 $0.750 $0.920 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 7.000 $100.000 $1.000 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $100.000 $1.000 $25.000
PAV SURF PREP FOR MRKS (SHIELD)
EA 5.000 $250.000 $20.000 $30.000
JT SEALING AND CLEANING(TRANS CNTR JTS)
LF 4,730.000 $4.000 $1.900 $3.250
JT SEALING AND CLEANING(LONGT CNTR JTS)
LF 448,010.000 $2.500 $1.900 $1.990
FIBER REINFORCED POLYMER PATCHING MATLS
LB 900.000 $8.000 $20.000 $29.000
TEXTURING CONCRETE PAVEMENT)
SY 438,736.000 $3.100 $3.150 $3.150
TEXTURING BRIDGE DECK
SY 57,516.000 $3.100 $3.150 $3.150
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,407.000 $80.000 $80.000 $50.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 97,341.000 $1.000 $0.790 $0.850
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 66,970.000 $1.000 $0.850 $0.850
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 53,360.000 $1.500 $1.200 $0.920
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 10,953.000 $3.000 $4.800 $2.400
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 2,613.000 $3.000 $3.000 $2.400
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 104,317.000 $1.000 $0.790 $0.850
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 66,970.000 $1.000 $0.850 $0.850
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 5.000 $300.000 $245.000 $260.000
MULTIPOLYMER PAV MRK (W) (WORD)
EA 5.000 $300.000 $300.000 $2.850
MULTIPOLYMER PAV MRK (W) (NUMBER)
EA 20.000 $350.000 $275.000 $360.000
TMA (STATIONARY)
DAY 233.000 $150.000 $150.000 $104.530
TMA (MOBILE OPERATION)
DAY 1,200.000 $80.000 $150.000 $104.530
Totals: $6,877,584.000 $6,688,663.458 $7,224,000.000