REMOVING CONC (RIPRAP)
|
SY
|
364.000
|
$50.000
|
$12.500
|
$27.590
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
208.000
|
$60.000
|
$20.000
|
$38.440
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
208.000
|
$100.000
|
$20.000
|
$90.640
|
|
|
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
|
CY
|
500.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
16.000
|
$200.000
|
$350.000
|
$573.350
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
24.000
|
$250.000
|
$500.000
|
$391.200
|
|
|
RIPRAP (CONC)(CL C)
|
CY
|
201.000
|
$1,200.000
|
$530.000
|
$735.220
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
10,229.000
|
$40.000
|
$25.000
|
$57.400
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
1,210.000
|
$40.000
|
$25.000
|
$12.100
|
|
|
RESIZING AND SEALING JOINTS
|
LF
|
2,450.000
|
$80.000
|
$32.000
|
$70.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
869.000
|
$75.000
|
$90.000
|
$325.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS) (MOD)
|
LF
|
128.000
|
$200.000
|
$105.000
|
$350.000
|
|
|
RAIL (TY T80SS) W/DRAIN SLOTS
|
LF
|
630.000
|
$225.000
|
$115.000
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$640,000.000
|
$665,000.000
|
$720,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$15,000.000
|
$66,000.000
|
$39,330.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
240.000
|
$30.000
|
$30.000
|
$240.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
240.000
|
$10.000
|
$12.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
200.000
|
$4.000
|
$3.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
200.000
|
$1.000
|
$1.000
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
200.000
|
$10.000
|
$7.500
|
$6.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$2.000
|
$1.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
2,520.000
|
$75.000
|
$150.000
|
$90.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
2,520.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
30.000
|
$200.000
|
$265.000
|
$500.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
65.000
|
$200.000
|
$335.000
|
$525.000
|
|
|
PERM CTB (SGL SLOPE) (MOD)
|
LF
|
18.000
|
$1,250.000
|
$295.000
|
$600.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
90,150.000
|
$0.250
|
$0.600
|
$0.710
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,907.000
|
$3.000
|
$6.000
|
$3.300
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$250.000
|
$500.000
|
$329.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$250.000
|
$500.000
|
$275.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$300.000
|
$500.000
|
$326.810
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$300.000
|
$500.000
|
$385.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
7.000
|
$1,500.000
|
$850.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$13,750.000
|
$10,000.000
|
|
|
CRASH CUSHION ATTEN (INSTALL)(REACT)(N)
|
EA
|
6.000
|
$35,000.000
|
$28,000.000
|
$34,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
23.000
|
$20.000
|
$12.000
|
$6.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
1,600.000
|
$20.000
|
$12.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
754.000
|
$1.500
|
$7.770
|
$1.400
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
5.000
|
$100.000
|
$400.000
|
$100.000
|
|
PREFAB PAV MRK TY B (W)(LNDP ARROW)
|
EA
|
2.000
|
$4,000.000
|
$1,800.000
|
$2,500.000
|
|
PREFAB PAV MRK TY B (MULTI)(SHIELD)
|
EA
|
5.000
|
$4,000.000
|
$4,400.000
|
$3,000.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
6,910.000
|
$6.000
|
$5.110
|
$4.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
201,658.000
|
$0.350
|
$0.260
|
$0.200
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
133,940.000
|
$0.500
|
$0.300
|
$0.200
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
53,360.000
|
$0.750
|
$0.550
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
2,613.000
|
$1.000
|
$2.000
|
$1.750
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
7.000
|
$200.000
|
$82.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (NUMBER)
|
EA
|
20.000
|
$150.000
|
$57.000
|
$125.000
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
5.000
|
$150.000
|
$485.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
335,598.000
|
$0.250
|
$0.001
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
53,360.000
|
$0.500
|
$0.001
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
13,566.000
|
$0.750
|
$0.920
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
7.000
|
$100.000
|
$1.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
5.000
|
$100.000
|
$1.000
|
$25.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
5.000
|
$250.000
|
$20.000
|
$30.000
|
|
|
JT SEALING AND CLEANING(TRANS CNTR JTS)
|
LF
|
4,730.000
|
$4.000
|
$1.900
|
$3.250
|
|
|
JT SEALING AND CLEANING(LONGT CNTR JTS)
|
LF
|
448,010.000
|
$2.500
|
$1.900
|
$1.990
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
900.000
|
$8.000
|
$20.000
|
$29.000
|
|
|
TEXTURING CONCRETE PAVEMENT)
|
SY
|
438,736.000
|
$3.100
|
$3.150
|
$3.150
|
|
|
TEXTURING BRIDGE DECK
|
SY
|
57,516.000
|
$3.100
|
$3.150
|
$3.150
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,407.000
|
$80.000
|
$80.000
|
$50.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
97,341.000
|
$1.000
|
$0.790
|
$0.850
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
66,970.000
|
$1.000
|
$0.850
|
$0.850
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
53,360.000
|
$1.500
|
$1.200
|
$0.920
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
10,953.000
|
$3.000
|
$4.800
|
$2.400
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
2,613.000
|
$3.000
|
$3.000
|
$2.400
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
104,317.000
|
$1.000
|
$0.790
|
$0.850
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
66,970.000
|
$1.000
|
$0.850
|
$0.850
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
5.000
|
$300.000
|
$245.000
|
$260.000
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
5.000
|
$300.000
|
$300.000
|
$2.850
|
|
MULTIPOLYMER PAV MRK (W) (NUMBER)
|
EA
|
20.000
|
$350.000
|
$275.000
|
$360.000
|
|
|
TMA (STATIONARY)
|
DAY
|
233.000
|
$150.000
|
$150.000
|
$104.530
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
1,200.000
|
$80.000
|
$150.000
|
$104.530
|
|
Totals: |
$6,877,584.000
|
$6,688,663.458
|
$7,224,000.000
|