PREPARING ROW
|
STA
|
510.000
|
$250.000
|
$150.000
|
$500.000
|
$250.000
|
$250.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
69,307.000
|
$8.000
|
$8.012
|
$10.000
|
$15.000
|
$11.500
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
483.000
|
$25.000
|
$12.000
|
$15.000
|
$25.000
|
$32.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
34,773.000
|
$15.000
|
$4.242
|
$6.000
|
$18.000
|
$8.550
|
|
|
BACKFILL (TY A)
|
STA
|
895.920
|
$200.000
|
$208.000
|
$300.000
|
$250.000
|
$585.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
161,648.000
|
$0.150
|
$0.099
|
$0.070
|
$0.200
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
161,648.000
|
$0.150
|
$0.099
|
$0.080
|
$0.200
|
$0.100
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
66.790
|
$520.000
|
$537.020
|
$500.000
|
$750.000
|
$445.000
|
|
|
PROOF ROLLING
|
HR
|
59.000
|
$120.000
|
$110.000
|
$80.000
|
$100.000
|
$155.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
28,884.000
|
$50.000
|
$58.086
|
$66.000
|
$81.000
|
$74.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
25,215.000
|
$5.000
|
$3.365
|
$3.400
|
$4.500
|
$4.050
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
228,438.000
|
$3.500
|
$4.420
|
$3.000
|
$4.250
|
$3.500
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
4,319.000
|
$110.000
|
$123.500
|
$130.000
|
$125.000
|
$100.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,000.000
|
$60.000
|
$57.200
|
$59.000
|
$75.000
|
$87.500
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
5,228.000
|
$3.000
|
$3.625
|
$3.500
|
$7.000
|
$4.250
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
27.000
|
$100.000
|
$60.000
|
$260.000
|
$100.000
|
$265.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
84.000
|
$200.000
|
$240.000
|
$430.000
|
$225.000
|
$425.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
735.000
|
$35.000
|
$8.800
|
$68.000
|
$75.000
|
$69.000
|
|
|
CL C CONC (RAC-R)
|
CY
|
11.000
|
$1,400.000
|
$1,200.000
|
$2,600.000
|
$1,400.000
|
$2,100.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,885.000
|
$450.000
|
$495.000
|
$530.000
|
$700.000
|
$530.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
132.000
|
$500.000
|
$605.000
|
$580.000
|
$720.000
|
$585.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
198.000
|
$550.000
|
$550.000
|
$640.000
|
$700.000
|
$640.000
|
|
|
RAIL (TY T631)
|
LF
|
100.000
|
$80.000
|
$220.000
|
$77.000
|
$110.000
|
$96.000
|
|
|
RETROFIT RAIL (TY T223)
|
LF
|
1,418.000
|
$200.000
|
$275.000
|
$90.000
|
$125.000
|
$320.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
66.000
|
$450.000
|
$426.844
|
$630.000
|
$660.000
|
$640.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
71.000
|
$450.000
|
$430.444
|
$630.000
|
$660.000
|
$640.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
132.000
|
$350.000
|
$559.899
|
$660.000
|
$675.000
|
$665.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
68.000
|
$750.000
|
$505.971
|
$670.000
|
$685.000
|
$680.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
36.000
|
$500.000
|
$570.699
|
$690.000
|
$700.000
|
$690.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
70.000
|
$480.000
|
$641.727
|
$700.000
|
$710.000
|
$710.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
7.000
|
$800.000
|
$649.827
|
$710.000
|
$730.000
|
$720.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
81.000
|
$900.000
|
$719.954
|
$760.000
|
$740.000
|
$770.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
77.000
|
$700.000
|
$834.182
|
$800.000
|
$750.000
|
$800.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
94.000
|
$650.000
|
$962.737
|
$900.000
|
$800.000
|
$905.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
27.000
|
$900.000
|
$1,095.793
|
$950.000
|
$950.000
|
$960.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
8.000
|
$1,100.000
|
$1,373.893
|
$1,000.000
|
$1,185.000
|
$1,000.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
34.000
|
$1,200.000
|
$1,495.248
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
|
|
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
|
LF
|
30.000
|
$950.000
|
$1,616.604
|
$1,300.000
|
$1,250.000
|
$1,300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
544.000
|
$75.000
|
$77.000
|
$64.000
|
$90.000
|
$64.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
60.000
|
$80.000
|
$88.000
|
$165.000
|
$135.000
|
$165.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$7,500.000
|
$3,295.544
|
$4,300.000
|
$7,800.000
|
$4,300.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$18,000.000
|
$4,119.429
|
$5,300.000
|
$8,250.000
|
$5,300.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
2.000
|
$11,000.000
|
$6,179.144
|
$6,800.000
|
$10,800.000
|
$6,900.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$13,000.000
|
$8,376.173
|
$8,900.000
|
$11,500.000
|
$9,000.000
|
|
|
WINGWALL (FW - 0) (HW=8 FT)
|
EA
|
1.000
|
$13,000.000
|
$12,358.288
|
$13,000.000
|
$15,000.000
|
$13,500.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$18,000.000
|
$4,394.058
|
$4,800.000
|
$8,800.000
|
$4,800.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$45,000.000
|
$34,603.207
|
$37,000.000
|
$38,000.000
|
$37,000.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
1.000
|
$50,000.000
|
$46,549.552
|
$47,000.000
|
$39,000.000
|
$48,000.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
2.000
|
$75,000.000
|
$67,146.699
|
$66,000.000
|
$52,500.000
|
$67,000.000
|
|
|
WINGWALL (PW - 1) (HW=13 FT)
|
EA
|
1.000
|
$60,000.000
|
$59,731.726
|
$59,000.000
|
$50,000.000
|
$59,500.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$15,000.000
|
$8,170.202
|
$10,000.000
|
$10,500.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$24,000.000
|
$12,495.602
|
$13,000.000
|
$13,000.000
|
$13,500.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$22,000.000
|
$16,889.660
|
$17,000.000
|
$16,700.000
|
$17,500.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$25,000.000
|
$23,755.376
|
$25,000.000
|
$21,000.000
|
$25,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$35,000.000
|
$29,110.634
|
$30,000.000
|
$36,500.000
|
$30,500.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
3.000
|
$4,500.000
|
$4,335.586
|
$6,400.000
|
$7,750.000
|
$6,400.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
6.000
|
$7,500.000
|
$5,793.615
|
$6,400.000
|
$8,200.000
|
$6,400.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
12.000
|
$5,500.000
|
$9,629.944
|
$7,400.000
|
$8,700.000
|
$7,400.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$4,452.001
|
$8,500.000
|
$8,500.000
|
$8,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
6.000
|
$6,500.000
|
$6,299.458
|
$8,500.000
|
$8,700.000
|
$8,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
3.000
|
$7,500.000
|
$6,617.444
|
$8,500.000
|
$8,700.000
|
$8,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$11,000.000
|
$8,380.995
|
$9,000.000
|
$9,000.000
|
$9,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
4.000
|
$10,000.000
|
$8,421.716
|
$9,500.000
|
$10,900.000
|
$9,600.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$10,000.000
|
$8,426.258
|
$10,000.000
|
$10,900.000
|
$10,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$10,500.000
|
$10,273.316
|
$11,000.000
|
$11,850.000
|
$11,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$10,800.016
|
$11,500.000
|
$13,700.000
|
$11,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$6,500.000
|
$15,218.117
|
$12,000.000
|
$14,500.000
|
$12,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$14,000.000
|
$14,253.788
|
$12,000.000
|
$15,000.000
|
$12,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
1.000
|
$9,000.000
|
$21,273.175
|
$14,000.000
|
$15,200.000
|
$14,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
1.000
|
$18,000.000
|
$23,654.061
|
$14,500.000
|
$17,500.000
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
3.000
|
$10,000.000
|
$18,170.331
|
$15,500.000
|
$17,900.000
|
$15,500.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
1.000
|
$14,000.000
|
$19,566.174
|
$17,500.000
|
$19,500.000
|
$17,500.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
|
EA
|
1.000
|
$21,000.000
|
$33,647.848
|
$20,000.000
|
$23,400.000
|
$19,500.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 10 FT)(3:1)(C)
|
EA
|
2.000
|
$10,000.000
|
$40,639.177
|
$24,000.000
|
$27,700.000
|
$24,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$1,600.000
|
$1,374.700
|
$1,100.000
|
$1,700.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$1,928.100
|
$1,600.000
|
$2,500.000
|
$1,600.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
41.000
|
$2,000.000
|
$1,800.000
|
$2,100.000
|
$2,000.000
|
$2,100.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
63.000
|
$800.000
|
$1,200.000
|
$1,600.000
|
$1,200.000
|
$1,600.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
47.000
|
$75.000
|
$30.000
|
$320.000
|
$65.000
|
$320.000
|
|
|
REMOV STR (PIPE)
|
EA
|
3.000
|
$500.000
|
$600.000
|
$1,600.000
|
$1,000.000
|
$1,600.000
|
|
|
REMOV STR (CURB)
|
EA
|
2.000
|
$1,300.000
|
$600.000
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
100.000
|
$30.000
|
$12.000
|
$26.000
|
$8.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,761,700.000
|
$491,506.000
|
$1,360,000.000
|
$1,000,000.000
|
$2,040,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$9,000.000
|
$6,879.979
|
$7,000.000
|
$5,500.000
|
$17,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
762.000
|
$45.000
|
$48.000
|
$37.000
|
$55.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
762.000
|
$10.000
|
$6.000
|
$10.000
|
$10.000
|
$9.600
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,665.000
|
$3.000
|
$2.750
|
$3.200
|
$5.000
|
$3.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,665.000
|
$1.000
|
$1.100
|
$0.800
|
$1.000
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,880.000
|
$4.500
|
$4.400
|
$4.800
|
$5.000
|
$5.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,880.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$1.050
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,380.000
|
$30.000
|
$7.047
|
$22.000
|
$28.000
|
$34.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,420.000
|
$15.000
|
$5.156
|
$15.000
|
$17.000
|
$27.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$30.000
|
$8.874
|
$26.000
|
$25.000
|
$35.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
611.000
|
$50.000
|
$34.975
|
$24.000
|
$35.000
|
$76.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
4,350.000
|
$40.000
|
$34.975
|
$18.000
|
$35.000
|
$44.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
2,159.000
|
$40.000
|
$45.460
|
$35.000
|
$60.000
|
$76.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
177,235.000
|
$0.200
|
$0.077
|
$0.140
|
$0.220
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
87,796.000
|
$0.200
|
$0.080
|
$0.140
|
$0.220
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
9,818.000
|
$25.000
|
$27.500
|
$28.000
|
$30.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$40.000
|
$33.000
|
$68.000
|
$62.000
|
$69.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,500.000
|
$2,640.000
|
$2,000.000
|
$2,500.000
|
$3,000.000
|
|
|
SHORT RADIUS
|
LF
|
38.000
|
$45.000
|
$104.500
|
$45.000
|
$50.000
|
$42.500
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,200.000
|
$1,430.000
|
$800.000
|
$1,100.000
|
$1,200.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$2,000.000
|
$1,760.000
|
$1,400.000
|
$1,850.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,702.000
|
$3.000
|
$2.750
|
$2.200
|
$3.250
|
$2.150
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
27.000
|
$300.000
|
$220.000
|
$220.000
|
$310.000
|
$215.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$300.000
|
$275.000
|
$220.000
|
$360.000
|
$215.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
71.000
|
$3,000.000
|
$3,300.000
|
$3,200.000
|
$3,550.000
|
$3,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
17.000
|
$450.000
|
$275.000
|
$220.000
|
$310.000
|
$215.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,750.000
|
$900.000
|
$720.000
|
$2,600.000
|
$2,600.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,200.000
|
$600.000
|
$720.000
|
$1,100.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$7,750.000
|
$10,000.000
|
$7,500.000
|
$10,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$280.000
|
$275.000
|
$370.000
|
$350.000
|
$265.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
56.000
|
$700.000
|
$660.000
|
$650.000
|
$680.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
34.000
|
$800.000
|
$770.000
|
$800.000
|
$780.000
|
$830.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$900.000
|
$1,045.000
|
$1,100.000
|
$980.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$1,200.000
|
$990.000
|
$1,200.000
|
$1,120.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$1,200.000
|
$1,045.000
|
$1,200.000
|
$1,100.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
79.000
|
$90.000
|
$110.000
|
$22.000
|
$100.000
|
$105.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
42.000
|
$75.000
|
$71.500
|
$75.000
|
$70.000
|
$74.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
171.000
|
$35.000
|
$33.000
|
$25.000
|
$45.000
|
$37.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,649.000
|
$5.000
|
$3.410
|
$3.300
|
$3.250
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
6,674.000
|
$4.000
|
$3.410
|
$3.300
|
$3.250
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
68,882.000
|
$0.700
|
$0.715
|
$0.700
|
$0.400
|
$0.690
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
13,709.000
|
$2.000
|
$1.200
|
$0.500
|
$1.750
|
$1.050
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
9,930.000
|
$2.000
|
$1.200
|
$0.500
|
$1.750
|
$1.050
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,476.000
|
$1.200
|
$1.100
|
$1.100
|
$1.750
|
$1.050
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
20.000
|
$7.000
|
$22.000
|
$22.000
|
$15.000
|
$21.500
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
8.000
|
$370.000
|
$825.000
|
$790.000
|
$600.000
|
$800.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
16,477.000
|
$0.150
|
$0.143
|
$0.140
|
$0.250
|
$0.140
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
2,203.000
|
$0.150
|
$0.143
|
$0.140
|
$0.250
|
$0.140
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
193,035.000
|
$0.150
|
$0.121
|
$0.120
|
$0.250
|
$0.120
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
14,420.000
|
$0.450
|
$0.550
|
$0.550
|
$0.420
|
$0.530
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
179,726.000
|
$0.350
|
$0.506
|
$0.500
|
$0.420
|
$0.490
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,625.000
|
$0.350
|
$0.550
|
$0.550
|
$0.420
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
155,459.000
|
$0.350
|
$0.506
|
$0.500
|
$0.420
|
$0.490
|
|
REFL PAV MRKR TY I-C
|
EA
|
723.000
|
$4.500
|
$4.400
|
$4.500
|
$4.000
|
$4.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,205.000
|
$3.500
|
$3.575
|
$3.500
|
$4.000
|
$3.450
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
31,344.000
|
$0.800
|
$0.825
|
$0.800
|
$2.000
|
$0.800
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
13,750.000
|
$80.000
|
$102.665
|
$104.000
|
$113.610
|
$115.000
|
|
|
SP MIXES SP-C PG64-22 (LEVEL-UP)
|
TON
|
21,854.000
|
$110.000
|
$108.665
|
$106.000
|
$113.610
|
$115.000
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
40,970.000
|
$90.000
|
$110.293
|
$102.000
|
$120.970
|
$120.000
|
|
|
SP MIXES SP-D SAC-B PG70-22 (LEVEL-UP)
|
TON
|
5,463.000
|
$120.000
|
$116.293
|
$110.000
|
$120.970
|
$165.000
|
|
|
TACK COAT
|
GAL
|
49,686.000
|
$3.500
|
$3.354
|
$2.700
|
$2.000
|
$2.700
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$8,250.000
|
$15,000.000
|
$15,000.000
|
$10,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
810.000
|
$250.000
|
$168.000
|
$100.000
|
$200.000
|
$215.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
73.000
|
$250.000
|
$102.000
|
$40.000
|
$225.000
|
$960.000
|
|
Totals: |
$19,378,098.950
|
$19,299,562.041
|
$19,912,192.390
|
$22,885,484.620
|
$23,745,118.930
|