STERLING SH 163 (0333-02-013)

Items: 75

County: STERLING
Length: N/A
Highway: SH 163
District: SAN ANGELO
Control Number: 0333-02-013
DBE Goal: N/A
Project: BR 2023(234)
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $2,121,104.30
Date: 12/01/2022 (3 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
JORDAN SEFCIK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,121,104.30
$2,615,605.00
Over/Under Est: 23.31% $494,500.70
Over/Under Est: 52.48% $1,113,081.85
Amt Left: 23.65% $618,581.15
Over/Under Est: 53.49% $1,134,485.36
Amt Left: 24.47% $639,984.66
Delta: -0.66% -$21,403.51
Over/Under Est: 91.24% $1,935,336.78
Amt Left: 55.09% $1,440,836.08
Delta: -24.60% -$800,851.42

Bid Items & Bid Tabulations

75 Total 0 of 75
STERLING  |  SH 163  |  SAN ANGELO  |  0333-02-013  |  12/01/2022  |  $2,121,104.30  |  BR 2023(234)  |  REPLACE BRIDGE AND APPROACHES  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
ACME BRIDGE COMPANY, INC.
COPPELL CONSTRUCTION CO., INC.
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 13.000 $5,000.000 $2,500.000 $3,000.000 $1,500.000 $30,000.000
EXCAVATION (ROADWAY)
CY 1,068.000 $15.000 $15.000 $25.300 $25.000 $69.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,745.000 $20.000 $34.000 $25.000 $35.000 $84.000
FURNISHING AND PLACING TOPSOIL (4")
SY 16,234.000 $2.000 $4.000 $5.000 $4.000 $7.500
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 11,920.000 $0.300 $1.000 $0.560 $2.000 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 2,158.000 $0.300 $1.000 $0.560 $1.500 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 2,158.000 $0.300 $1.000 $0.560 $1.500 $1.000
VEGETATIVE WATERING
MG 282.000 $12.000 $40.000 $59.700 $40.000 $49.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 16,503.000 $1.900 $1.500 $2.250 $3.000 $3.500
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 501.000 $2.100 $2.500 $3.350 $5.000 $3.500
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 3,537.000 $9.000 $22.000 $18.700 $25.000 $11.000
FL BS (CMP IN PLC)(TY A GR 1-2)(9")
SY 4,437.000 $30.000 $22.000 $27.500 $30.000 $16.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 167.000 $170.000 $375.000 $500.000 $300.000 $305.000
LIME TRT (SUBGRADE)(8")
SY 3,785.000 $4.000 $5.000 $5.000 $12.000 $5.500
LIME TRT (SUBGRADE)(12")
SY 4,544.000 $10.000 $5.000 $4.150 $14.000 $7.700
PRIME COAT (MC-30)
GAL 1,596.000 $8.000 $10.000 $8.300 $13.000 $9.260
ASPH (TIER I)
GAL 2,088.000 $3.000 $5.000 $9.900 $13.000 $7.370
AGGR(TY-PD GR-3 SAC-B)
CY 42.000 $85.000 $110.000 $949.000 $284.000 $252.870
AGGR(TY-PE GR-3 SAC-B)
CY 131.000 $100.000 $110.000 $709.000 $284.000 $155.800
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 2,280.000 $4.000 $7.000 $9.900 $28.000 $7.370
ASPH (AC-20-5TR OR AC-20XP)
GAL 1,421.000 $5.000 $7.000 $9.900 $28.000 $7.370
CEM STABIL BKFL
CY 64.000 $300.000 $300.000 $398.000 $334.000 $172.000
DRILL SHAFT (36 IN)
LF 396.000 $300.000 $550.000 $391.000 $315.000 $560.000
CL C CONC (ABUT)
CY 39.400 $1,000.000 $1,500.000 $1,490.000 $1,700.000 $1,177.000
CL C CONC (CAP)
CY 15.800 $1,165.000 $1,400.000 $1,980.000 $1,500.000 $1,809.000
CL C CONC (COLUMN)
CY 7.900 $1,097.000 $1,550.000 $2,510.000 $2,200.000 $2,564.000
REINF CONC SLAB
SF 4,140.000 $21.000 $25.000 $40.900 $38.000 $36.000
APPROACH SLAB
CY 54.600 $750.000 $1,200.000 $1,150.000 $900.000 $750.000
RETAINING WALL (TEMP WALL)
SF 1,657.000 $25.000 $25.000 $72.000 $40.000 $27.250
PRESTR CONC GIRDER (TX28)
LF 570.000 $200.000 $220.000 $350.000 $207.000 $203.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 292.000 $415.000 $700.000 $861.000 $950.000 $729.000
RIPRAP (MOW STRIP)(4 IN)
CY 57.000 $500.000 $600.000 $1,030.000 $681.000 $688.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 262.000 $115.000 $130.000 $171.000 $162.000 $194.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 70.000 $200.000 $205.000 $317.000 $265.000 $227.000
CONC BOX CULV (6 FT X 3 FT)
LF 66.000 $675.000 $1,050.000 $1,350.000 $1,400.000 $700.000
REMOV STR (BOX CULVERT)
LF 66.000 $91.000 $100.000 $152.000 $265.000 $55.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $87,500.000 $44,000.000 $44,138.710 $174,000.000
MOBILIZATION
LS 1.000 $190,000.000 $215,000.000 $225,000.000 $300,000.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $2,000.000 $4,940.000 $1,190.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 200.000 $42.000 $40.000 $55.800 $40.000 $50.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 78.000 $130.000 $70.000 $83.800 $55.000 $80.000
ROCK FILTER DAMS (REMOVE)
LF 278.000 $20.500 $10.000 $16.800 $10.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $30.500 $40.000 $27.900 $40.000 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $7.750 $5.000 $11.200 $15.000 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,148.000 $5.600 $5.000 $3.350 $4.000 $7.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,148.000 $1.200 $1.000 $1.100 $1.000 $2.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $5.000 $7.000 $16.800 $7.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $2.000 $1.000 $5.600 $2.000 $2.000
CONSTRUCTING DETOURS (EBSS)
SY 3,351.000 $20.000 $20.000 $25.000 $65.000 $27.650
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 8.000 $6,000.000 $5,000.000 $3,350.000 $7,645.000 $2,700.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 3,270.000 $30.000 $70.000 $88.200 $87.000 $125.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 3,270.000 $15.000 $10.000 $40.300 $12.000 $10.000
MTL W-BEAM GD FEN (STEEL POST)
LF 501.000 $35.000 $40.000 $40.800 $30.000 $67.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $1,500.000 $2,620.000 $2,434.000 $2,650.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,500.000 $3,990.000 $2,891.000 $4,225.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $870.000 $1,000.000 $934.000 $1,014.000 $1,150.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $9,000.000 $12,100.000 $11,000.000 $9,425.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $800.000 $700.000 $36.600 $913.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 22.000 $30.000 $35.000 $36.600 $25.000 $200.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 3,314.000 $1.000 $1.000 $1.100 $1.000 $1.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 96.000 $5.000 $5.000 $11.200 $10.000 $10.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,189.000 $1.000 $1.000 $1.400 $1.250 $1.250
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $10.000 $10.000 $27.900 $25.000 $25.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,840.000 $1.000 $1.000 $1.400 $1.250 $1.250
REFL PAV MRK TY II (W) 4" (SLD)
LF 5,462.000 $1.000 $1.000 $0.560 $0.500 $0.500
REFL PAV MRK TY II (Y) 4" (BRK)
LF 650.000 $1.000 $1.000 $0.560 $0.500 $0.500
REFL PAV MRK TY II (Y) 4" (SLD)
LF 857.000 $1.000 $1.000 $0.560 $0.500 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 5,462.000 $1.000 $1.000 $1.800 $1.600 $1.600
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 650.000 $1.000 $1.000 $2.250 $2.000 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 857.000 $1.000 $1.000 $2.250 $2.000 $2.000
REFL PAV MRKR TY II-A-A
EA 46.000 $4.000 $1.000 $11.200 $10.000 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,796.000 $1.000 $1.000 $1.650 $1.500 $1.500
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $500.000 $500.000 $191.000 $904.000 $650.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 632.000 $70.000 $80.000 $49.700 $50.000 $92.000
TMA (STATIONARY)
DAY 36.000 $155.000 $300.000 $82.800 $507.000 $370.000
Totals: $2,121,104.300 $2,615,605.000 $3,234,186.150 $3,255,589.660 $4,056,441.080