STEPHENS FM 3099 (3469-01-014)

Items: 133

County: STEPHENS
Length: N/A
Highway: FM 3099
District: BROWNWOOD
Control Number: 3469-01-014
DBE Goal: N/A
Project: F 2023(378)
Guaranty: N/A
Time: 224 WORKING DAYS
Engineer's Estimate: $3,069,767.15
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JORDAN PERRY
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,069,767.15
$3,529,353.22
Over/Under Est: 14.97% $459,586.07
Over/Under Est: 32.36% $993,297.72
Amt Left: 15.12% $533,711.65
$4,897,843.86
Over/Under Est: 59.55% $1,828,076.71
Amt Left: 38.77% $1,368,490.64
Delta: -20.55% -$834,778.99
$5,330,745.45
Over/Under Est: 73.65% $2,260,978.30
Amt Left: 51.04% $1,801,392.23
Delta: -8.84% -$432,901.59
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 19.55% $750,681.77
WILLIS ELECTRIC CO., LP 13.87% $532,580.88
D. I. J. CONSTRUCTION, INC. 2.52% $96,763.07
J. H. ODEN CONTRACTING COMPANY 1.76% $67,580.56
TNT INDUSTRIAL CONTRACTING 1.02% $39,166.01
FLATWORKS, LLC 0.78% $29,950.47
CONTRACTORS SERVICE, LTD. 0.73% $28,030.57
FIBERTEX, LLC 0.49% $18,815.04
SUPERIOR TRAFFIC CONTROL, LLC 0.47% $18,047.08
PENHALL COMPANY 0.29% $11,135.43
GRIDER PAVING LLC 0.28% $10,751.45
DUSTROL, INC. 0.18% $6,911.65
BARRICADES UNLIMITED 0.09% $3,455.82
Total: 42.03% $1,613,869.80

Bid Items & Bid Tabulations

133 Total 0 of 133
STEPHENS  |  FM 3099  |  BROWNWOOD  |  3469-01-014  |  01/06/2023  |  $3,069,767.15  |  F 2023(378)  |  HAZARD ELIM & SAFETY  |  224 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PRATER DIRT WORK LLC
JAY MILLS CONTRACTING, INCORPORATED
A. L. HELMCAMP, INC.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 10.530 $4,000.000 $6,500.000 $5,000.000 $22,000.000 $9,702.810
REMOVING CONC (DRIVEWAYS)
SY 681.000 $18.000 $23.000 $16.000 $50.000 $20.590
REMOVING CONC (CURB AND GUTTER)
LF 644.000 $12.000 $15.000 $20.000 $40.000 $8.420
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 2,658.000 $6.000 $10.260 $8.000 $17.000 $7.700
REMOVING STAB BASE & ASPH PAV (0-6")
SY 4,032.000 $4.000 $5.330 $5.000 $11.000 $5.780
OBLITERATING ABANDONED ROAD
SY 1,907.000 $5.000 $6.500 $13.000 $7.000 $9.740
EXCAVATION (ROADWAY)
CY 6,455.000 $15.000 $19.000 $25.000 $28.000 $11.540
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 7,986.000 $15.000 $12.000 $25.000 $34.000 $35.350
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 25,126.000 $0.200 $0.290 $0.300 $0.210 $0.890
DRILL SEEDING (TEMP) (COOL)
SY 25,126.000 $0.200 $0.290 $0.300 $0.150 $0.770
FERTILIZER
AC 2.700 $750.000 $420.000 $460.000 $260.000 $2,362.000
VEGETATIVE WATERING
MG 6.400 $100.000 $10.000 $1,000.000 $240.000 $2,198.860
PROOF ROLLING
HR 19.000 $100.000 $100.000 $100.000 $100.000 $111.110
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 2,465.000 $65.000 $58.000 $80.000 $98.000 $125.790
REWORK BS MTL (TY B) (5") (DENS CONT)
SY 2,797.000 $3.000 $38.000 $5.000 $3.500 $34.390
PRIME COAT (RC-250)
GAL 2,015.000 $6.000 $8.000 $6.200 $8.000 $9.290
ASPH (AC-20-5TR)
GAL 12,848.000 $6.000 $8.000 $5.500 $6.500 $6.810
AGGR(TY-B GR-5 SAC-B)
CY 73.000 $120.000 $165.000 $150.000 $280.000 $316.400
AGGR(TY-PB GR-4 SAC-B)
CY 256.000 $120.000 $165.000 $130.000 $300.000 $330.160
HMCL ACP TY-D SAC-B AC-1.5
TON 100.000 $100.000 $150.000 $300.000 $250.000 $412.700
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 68.000 $85.000 $295.000 $100.000 $230.000 $350.790
CEM STABIL BKFL
CY 134.000 $200.000 $245.000 $260.000 $260.000 $155.230
TRENCH EXCAVATION PROTECTION
LF 93.000 $2.500 $15.000 $11.500 $16.000 $4.150
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 50.000 $325.000 $400.000 $402.500 $370.000 $520.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 18.000 $275.000 $310.000 $316.250 $290.000 $488.360
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 14.000 $325.000 $510.000 $517.500 $480.000 $756.620
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 66.000 $425.000 $775.000 $787.750 $740.000 $947.830
CL A CONC (MISC)
CY 0.500 $550.000 $5,650.000 $5,750.000 $2,200.000 $912.030
CL C CONC (HEADWALL)
CY 0.500 $750.000 $5,650.000 $5,750.000 $2,700.000 $1,300.970
RIPRAP (CONC)(5 IN)
CY 23.500 $450.000 $680.000 $690.000 $750.000 $616.970
RIPRAP (CONC)(CL B)
CY 1.750 $500.000 $1,700.000 $1,725.000 $800.000 $624.530
RIPRAP (STONE PROTECTION)(18 IN)
CY 53.000 $125.000 $310.000 $100.000 $260.000 $189.690
STR STEEL (MISC NON - BRIDGE)
LB 617.000 $14.000 $41.000 $41.400 $33.000 $44.300
RAIL (HANDRAIL)(TY B)
LF 64.000 $120.000 $200.000 $207.000 $200.000 $237.010
RAIL (TY PR11)
LF 14.000 $95.000 $275.000 $287.500 $350.000 $227.960
CMP AR (GAL STL DES 3)
LF 1,395.000 $75.000 $62.500 $66.700 $110.000 $135.340
CONC BOX CULV (4 FT X 4 FT)
LF 93.300 $1,000.000 $600.000 $610.000 $875.000 $759.870
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 72.000 $1,500.000 $1,350.000 $1,380.000 $1,500.000 $1,211.370
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 1.000 $25,000.000 $19,500.000 $21,275.000 $20,000.000 $19,870.390
INLET (COMPL) (DROP) (SPL)
EA 1.000 $8,200.000 $8,500.000 $9,200.000 $16,000.000 $11,074.090
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $10,000.000 $9,100.000 $9,775.000 $16,000.000 $8,032.700
SET (TY I)(S= 4 FT)(HW= 6 FT)(3:1) (C)
EA 1.000 $15,000.000 $9,500.000 $10,350.000 $12,000.000 $20,634.960
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
EA 6.000 $12,000.000 $8,900.000 $9,430.000 $13,000.000 $17,333.170
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 36.000 $2,500.000 $3,100.000 $3,450.000 $2,600.000 $4,138.000
REMOV STR (SET)
EA 4.000 $500.000 $215.000 $230.000 $1,100.000 $507.410
REMOV STR (HEADWALL)
EA 2.000 $100.000 $950.000 $920.000 $1,600.000 $2,237.020
REMOV STR (PIPE)
LF 592.000 $30.000 $14.000 $13.800 $18.000 $25.840
REMOVE STR (RAIL)
LF 52.000 $20.000 $21.000 $23.000 $55.000 $74.220
MOBILIZATION
LS 1.000 $300,000.000 $285,000.000 $400,000.000 $450,000.000 $515,874.010
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $10,000.000 $5,500.000 $18,000.000 $24,000.000 $16,507.970
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 50.000 $75.000 $70.000 $69.000 $42.000 $228.640
ROCK FILTER DAMS (REMOVE)
LF 170.000 $10.000 $20.000 $23.000 $21.000 $40.140
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 330.000 $20.000 $30.000 $34.500 $20.000 $68.760
CONSTRUCTION EXITS (REMOVE)
SY 330.000 $10.000 $10.000 $11.500 $5.000 $18.810
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,022.000 $2.500 $6.000 $4.600 $2.600 $6.420
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,022.000 $0.750 $1.000 $1.150 $1.000 $1.440
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 500.000 $6.000 $6.600 $6.900 $4.000 $9.450
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $1.000 $1.000 $1.150 $1.100 $2.890
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 120.000 $100.000 $50.000 $51.750 $37.000 $242.940
CONSTRUCTING DETOURS
SY 406.000 $100.000 $33.200 $60.000 $120.000 $282.010
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 160.000 $100.000 $80.000 $150.000 $90.000 $109.210
ONE-WAY TRAF CONT (PILOT CAR)
HR 160.000 $75.000 $120.000 $150.000 $150.000 $123.690
CONC CURB & GUTTER (TY II)
LF 877.000 $30.000 $50.000 $52.000 $90.000 $35.150
DRIVEWAYS (CONC)
SY 530.000 $75.000 $130.000 $150.000 $140.000 $115.810
DRIVEWAYS (ACP)
SY 2,296.000 $50.000 $20.000 $85.000 $65.000 $71.530
TURNOUTS (SURF TREAT)
SY 15.000 $10.000 $100.000 $70.000 $65.000 $275.130
CONC SIDEWALKS (4")
SY 828.000 $65.000 $90.000 $100.000 $100.000 $70.960
CURB RAMPS (TY 7)
EA 16.000 $2,500.000 $2,000.000 $2,250.000 $2,700.000 $2,365.940
CURB RAMPS (TY 10)
EA 4.000 $2,500.000 $2,200.000 $2,750.000 $2,700.000 $2,870.160
REMOVE METAL BEAM GUARD FENCE
LF 148.000 $3.000 $2.500 $3.000 $8.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $200.000 $300.000 $300.000 $300.000 $296.070
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 1.000 $500.000 $300.000 $368.000 $340.000 $437.720
REMOVE RD IL ASM (TRANS-BASE)
EA 3.000 $500.000 $575.000 $575.000 $600.000 $2,063.500
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 5.000 $4,000.000 $8,050.000 $8,050.000 $7,500.000 $10,289.970
CONDT (PVC) (SCH 80) (2")
LF 1,355.000 $20.000 $14.950 $14.950 $14.000 $17.260
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,025.000 $30.000 $25.300 $25.300 $24.000 $48.150
ELEC CONDR (NO.8) BARE
LF 3,135.000 $1.250 $1.730 $1.730 $1.600 $2.410
ELEC CONDR (NO.8) INSULATED
LF 2,820.000 $1.350 $2.000 $2.010 $2.000 $2.490
GROUND BOX TY D (162922)W/APRON
EA 7.000 $1,300.000 $2,760.000 $2,760.000 $2,600.000 $2,132.280
REMOVE GROUND BOX
EA 3.000 $1,000.000 $150.000 $149.500 $150.000 $350.790
REMOVE ELECTRICAL SERVICES
EA 1.000 $1,000.000 $287.500 $287.500 $270.000 $1,306.880
ELC SRV TY D 120/240 060(NS)AL(E)SP(O)
EA 1.000 $6,500.000 $9,775.000 $9,775.000 $9,000.000 $13,068.810
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $550.000 $700.000 $787.750 $730.000 $1,253.230
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $600.000 $900.000 $977.500 $900.000 $1,506.350
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $750.000 $1,050.000 $1,092.500 $1,000.000 $1,650.800
REMOVE SM RD SN SUP&AM
EA 23.000 $100.000 $110.000 $115.000 $110.000 $226.980
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $75.000 $80.000 $103.500 $95.000 $95.430
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,532.000 $1.000 $2.600 $2.700 $1.600 $1.380
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 9,214.000 $1.000 $1.700 $1.780 $1.600 $1.220
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 56.000 $8.000 $15.500 $16.100 $11.000 $16.510
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 1,753.000 $1.000 $2.600 $2.700 $1.600 $1.380
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 10,789.000 $1.000 $1.700 $1.780 $1.600 $1.220
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,946.000 $1.000 $1.650 $1.730 $1.100 $1.610
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 72.000 $4.000 $5.500 $5.750 $5.500 $4.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 768.000 $7.000 $11.000 $11.500 $6.400 $8.570
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 23.000 $125.000 $165.000 $172.500 $150.000 $189.840
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 23.000 $155.000 $220.000 $218.500 $175.000 $199.470
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 268.000 $3.000 $4.400 $4.600 $4.300 $4.110
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 960.000 $0.500 $1.100 $1.150 $1.100 $1.380
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 9,936.000 $0.500 $0.900 $0.920 $1.100 $1.130
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 260.000 $0.500 $1.100 $1.150 $1.100 $1.380
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,372.000 $0.500 $0.900 $0.920 $1.100 $1.130
REFL PAV MRKR TY I-C
EA 246.000 $3.000 $7.000 $7.480 $5.500 $7.570
REFL PAV MRKR TY II-A-A
EA 289.000 $3.000 $7.000 $7.480 $5.500 $7.570
ELIM EXT PAV MRK & MRKS (4")
LF 10,874.000 $0.500 $1.450 $1.500 $1.100 $0.950
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $40,000.000 $31,050.000 $31,050.000 $30,000.000 $61,904.880
VEH SIG SEC (12")LED(GRN)
EA 8.000 $400.000 $405.000 $402.500 $380.000 $433.330
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $400.000 $405.000 $402.500 $380.000 $412.700
VEH SIG SEC (12")LED(YEL)
EA 8.000 $400.000 $405.000 $402.500 $380.000 $433.330
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $400.000 $405.000 $402.500 $380.000 $412.700
VEH SIG SEC (12")LED(RED)
EA 8.000 $400.000 $405.000 $402.500 $380.000 $433.330
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $400.000 $405.000 $402.500 $380.000 $433.330
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 12.000 $100.000 $200.000 $201.250 $190.000 $247.620
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,010.000 $2.500 $5.000 $4.600 $4.300 $4.950
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 1,120.000 $3.500 $10.350 $10.350 $9.600 $5.300
INS TRF SIG PL AM(S)1 ARM(40')
EA 1.000 $12,000.000 $20,700.000 $20,700.000 $20,000.000 $27,306.930
INS TRF SIG PL AM(S)1 ARM(55')
EA 1.000 $15,000.000 $58,650.000 $58,650.000 $55,000.000 $59,153.550
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 2.000 $20,000.000 $63,825.000 $63,825.000 $59,000.000 $62,592.710
PED POLE ASSEMBLY
EA 4.000 $5,000.000 $2,990.000 $2,990.000 $2,800.000 $4,333.340
PED DETECT PUSH BUTTON (APS)
EA 4.000 $1,000.000 $1,403.000 $1,403.000 $1,300.000 $1,313.760
PED DETECTOR CONTROLLER UNIT
EA 4.000 $2,700.000 $3,105.000 $3,105.000 $2,900.000 $5,502.660
REMOVE LUMINAIRE POLE
EA 4.000 $2,000.000 $575.000 $575.000 $550.000 $1,760.850
D-GR HMA TY-B PG64-22
TON 3,821.000 $105.000 $108.000 $115.000 $165.000 $206.350
TACK COAT
GAL 1,124.000 $5.000 $10.000 $0.010 $4.600 $4.810
SP MIXES SP-C PG76-22
TON 517.000 $120.000 $125.000 $180.000 $200.000 $295.770
BONDING COURSE
GAL 460.000 $5.000 $10.000 $0.010 $4.600 $4.810
REMOVE FOUNDATION
EA 1.000 $2,000.000 $1,000.000 $1,750.000 $7,500.000 $872.860
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $100.000 $350.000 $175.000 $290.000 $115.760
TMA (STATIONARY)
DAY 224.000 $150.000 $400.000 $300.000 $260.000 $216.620
TMA (MOBILE OPERATION)
HR 88.000 $25.000 $500.000 $30.000 $75.000 $143.420
VIVDS PROSR SYS (INSTALL ONLY)
EA 1.000 $1,000.000 $1,092.000 $1,092.500 $1,100.000 $2,998.950
VIVDS CAM ASSY (INSTALL ONLY)
EA 4.000 $500.000 $1,115.000 $1,150.000 $1,100.000 $1,719.580
VIVDS CABLING (INSTALL ONLY)
LF 1,072.000 $1.500 $1.150 $1.150 $1.100 $2.410
Totals: $3,069,767.150 $3,529,353.220 $4,063,064.870 $4,897,843.860 $5,330,745.487