Show Job Controls
Bid Cobra

STEPHENS CS (0923-22-025)

Items: 39

County: STEPHENS
Length: N/A
Highway: CS
District: BROWNWOOD
Control Number: 0923-22-025
DBE Goal: N/A
Project: BR 2021(578)
Guaranty: N/A
Time: 115 WORKING DAYS
Engineer's Estimate: $1,089,180.00
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JORDAN PERRY
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,089,180.00
$1,073,352.20
Over/Under Est: -1.45% -$15,827.80
Over/Under Est: 11.15% $121,439.80
Amt Left: 12.79% $137,267.60
Subcontractor Percentage Amount
RAYDON, INC. 5.00% $53,667.61
Total: 5.00% $53,667.61

Bid Items & Bid Tabulations

39 Total 0 of 39
STEPHENS  |  CS  |  BROWNWOOD  |  0923-22-025  |  01/05/2023  |  $1,089,180.00  |  BR 2021(578)  |  BRIDGE REPL  |  115 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PROJECT ALLIED RESOURCES, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 3.400 $2,000.000 $2,820.000 $10,000.000
REMOVING CONC (PAV)
SY 46.000 $25.000 $12.500 $50.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 91.000 $20.000 $17.300 $35.000
REMOVING CONC (FLUME)
SY 50.000 $30.000 $37.300 $40.000
EXCAVATION (ROADWAY)
CY 180.000 $30.000 $34.100 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 284.000 $30.000 $19.400 $35.000
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
SY 210.000 $5.000 $11.400 $12.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 105.000 $4.000 $5.700 $20.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 105.000 $4.000 $5.700 $20.000
VEGETATIVE WATERING
MG 4.800 $50.000 $149.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 210.000 $15.000 $5.500 $6.000
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
CY 207.000 $150.000 $138.000 $150.000
PRIME COAT (RC-250)
GAL 186.000 $40.000 $23.600 $30.000
ASPH (AC-20-5TR)
GAL 312.000 $40.000 $17.600 $25.000
AGGR(TY-B GR-5 SAC-B)
CY 7.000 $1,500.000 $645.000 $1,400.000
AGGR(TY-PB GR-3 SAC-B)
CY 9.000 $1,500.000 $474.000 $1,400.000
CONC PVMT (CONT REINF - CRCP) (7")
SY 482.000 $200.000 $237.000 $280.000
CURB (TYPE II)
LF 228.000 $35.000 $33.000 $35.000
CEM STABIL BKFL
CY 360.000 $400.000 $243.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 70.000 $15.000 $90.000 $5.000
CL C CONC (CULV)
CY 167.800 $1,750.000 $1,910.000 $1,800.000
CL C CONC (WINGWALLS)
CY 76.700 $1,750.000 $1,720.000 $1,800.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 131.000 $300.000 $203.000 $200.000
STR STEEL (MISC NON - BRIDGE)
LB 144.000 $25.000 $34.600 $35.000
RAIL (TY C223)
LF 275.000 $215.000 $200.000 $225.000
RC PIPE (CL III)(30 IN)
LF 20.000 $220.000 $212.000 $150.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $15,000.000 $19,100.000 $40,000.000
MOBILIZATION
LS 1.000 $93,000.000 $119,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $2,500.000 $3,460.000 $11,500.000
ROCK FILTER DAMS (REMOVE)
LF 65.000 $20.000 $16.100 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 580.000 $6.000 $5.400 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 580.000 $2.000 $1.570 $1.000
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 65.000 $70.000 $92.000 $1.000
CONC CURB & GUTTER (TY II)
LF 168.000 $40.000 $47.200 $50.000
CONC SIDEWALKS (5")
SY 205.000 $100.000 $100.000 $85.000
CURB RAMPS (TY 2)
EA 2.000 $5,000.000 $3,550.000 $5,000.000
CURB RAMPS (TY 7)
EA 2.000 $5,000.000 $3,190.000 $5,000.000
REMOVE SM RD SN SUP&AM
EA 6.000 $200.000 $287.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $50.000 $43.100 $30.000
Totals: $1,089,180.000 $1,073,352.200 $1,210,619.800