PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
3.000
|
$245.000
|
$1,000.000
|
$1,500.000
|
$2,000.000
|
|
|
PREP ROW (TREE) (18"-36" DIA.)
|
EA
|
7.000
|
$1,200.000
|
$3,000.000
|
$2,000.000
|
$5,000.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
3,163.900
|
$19.000
|
$12.000
|
$10.000
|
$16.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,112.130
|
$23.000
|
$15.000
|
$20.000
|
$43.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
5,584.470
|
$15.280
|
$7.000
|
$11.000
|
$16.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
602.450
|
$6.000
|
$7.000
|
$15.000
|
$16.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
3.550
|
$45.000
|
$11.000
|
$100.000
|
$110.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,338.000
|
$7.920
|
$15.000
|
$25.000
|
$28.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,907.000
|
$5.350
|
$24.000
|
$15.000
|
$28.000
|
|
|
FURNISHING AND PLACING TOPSOIL (3")
|
SY
|
8,787.000
|
$0.650
|
$21.000
|
$4.000
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
8,787.000
|
$5.000
|
$4.000
|
$4.250
|
$4.250
|
|
|
VEGETATIVE WATERING
|
MG
|
197.000
|
$5.000
|
$15.000
|
$50.000
|
$25.000
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$148.080
|
$60.000
|
$100.000
|
$100.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
14,446.000
|
$90.000
|
$150.000
|
$143.000
|
$111.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
17.000
|
$300.000
|
$150.000
|
$150.000
|
$400.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
4,262.000
|
$95.000
|
$150.000
|
$140.000
|
$110.000
|
|
|
PLANE ASPH CONC PAV(4" TO 6")
|
SY
|
39,465.220
|
$3.000
|
$3.000
|
$4.000
|
$5.500
|
|
|
CONC PVMT (JOINTED - CPCD) (8")
|
SY
|
1,592.000
|
$66.000
|
$95.000
|
$110.000
|
$110.000
|
|
|
STRUCT EXCAV
|
CY
|
923.000
|
$30.000
|
$25.000
|
$20.000
|
$13.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
555.000
|
$180.000
|
$90.000
|
$175.000
|
$140.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
698.000
|
$5.000
|
$1.000
|
$12.000
|
$13.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
230.000
|
$215.000
|
$230.000
|
$275.000
|
$290.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
60.000
|
$190.000
|
$20.000
|
$200.000
|
$230.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
661.000
|
$400.000
|
$600.000
|
$1.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2.200
|
$500.000
|
$600.000
|
$1,000.000
|
$590.000
|
|
|
RAIL (HANDRAIL)(TY C)
|
LF
|
180.000
|
$135.000
|
$100.000
|
$50.000
|
$270.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
96.000
|
$200.000
|
$260.000
|
$400.000
|
$430.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
246.000
|
$220.000
|
$275.000
|
$425.000
|
$440.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
24.000
|
$230.000
|
$290.000
|
$500.000
|
$540.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
673.000
|
$90.000
|
$70.000
|
$90.000
|
$90.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
231.000
|
$78.000
|
$90.000
|
$110.000
|
$130.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
153.000
|
$200.000
|
$150.000
|
$140.000
|
$150.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
8.000
|
$5,000.000
|
$4,200.000
|
$4,000.000
|
$3,700.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
2.000
|
$5,000.000
|
$4,500.000
|
$3,000.000
|
$4,300.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
2.000
|
$7,000.000
|
$5,500.000
|
$6,000.000
|
$4,800.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$6,500.000
|
$4,500.000
|
$5,200.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$7,300.000
|
$8,000.000
|
$6,500.000
|
$7,700.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$7,000.000
|
$8,500.000
|
$5,000.000
|
$5,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$1,200.000
|
$1,200.000
|
$1,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$1,300.000
|
$2,500.000
|
$2,700.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$650.000
|
|
|
REMOV STR (PIPE)
|
LF
|
150.000
|
$20.820
|
$14.000
|
$20.000
|
$12.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
231.200
|
$20.820
|
$50.000
|
$100.000
|
$70.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$600,000.000
|
$820,000.000
|
$920,000.000
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$10,543.450
|
$10,000.000
|
$10,000.000
|
$19,300.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$30.000
|
$35.000
|
$26.000
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$8.000
|
$8.000
|
$10.000
|
$10.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
460.000
|
$4.500
|
$6.000
|
$5.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,817.000
|
$2.500
|
$2.250
|
$3.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,817.000
|
$0.500
|
$0.750
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
400.000
|
$4.000
|
$6.000
|
$5.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
400.000
|
$0.750
|
$1.000
|
$1.000
|
$1.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
8.000
|
$55.000
|
$60.000
|
$200.000
|
$130.000
|
|
|
CONC CURB (TY I)
|
LF
|
393.000
|
$35.000
|
$10.000
|
$20.000
|
$27.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
7,336.000
|
$25.000
|
$25.000
|
$30.000
|
$32.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
2,422.000
|
$110.000
|
$100.000
|
$100.000
|
$120.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,470.000
|
$50.000
|
$45.000
|
$70.000
|
$73.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,816.000
|
$100.000
|
$80.000
|
$85.000
|
$83.000
|
|
|
TURNOUTS (CONC)
|
SY
|
212.000
|
$105.000
|
$160.000
|
$85.000
|
$85.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,700.000
|
$65.000
|
$55.000
|
$52.000
|
$75.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
50.000
|
$2,500.000
|
$1,800.000
|
$1,500.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
14.000
|
$220.000
|
$250.000
|
$400.000
|
$427.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
7.000
|
$235.000
|
$300.000
|
$450.000
|
$484.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$370.000
|
$475.000
|
$700.000
|
$740.000
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
23.000
|
$3,573.600
|
$3,500.000
|
$5,000.000
|
$4,900.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
4,771.000
|
$10.000
|
$6.000
|
$13.000
|
$13.500
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,771.000
|
$1.000
|
$1.000
|
$1.300
|
$1.400
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
9,542.000
|
$1.500
|
$1.000
|
$1.500
|
$1.600
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
28.000
|
$1,000.000
|
$890.000
|
$1,200.000
|
$1,300.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$577.900
|
$425.000
|
$350.000
|
$380.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
|
EA
|
2.000
|
$6,500.000
|
$6,500.000
|
$6,000.000
|
$6,400.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
22.000
|
$40.000
|
$35.000
|
$31.000
|
$26.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
42.000
|
$585.000
|
$450.000
|
$875.000
|
$560.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$700.000
|
$580.000
|
$1,000.000
|
$630.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$600.000
|
$700.000
|
$1,100.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$450.000
|
$650.000
|
$1,100.000
|
$840.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$950.000
|
$830.000
|
$1,300.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$950.000
|
$850.000
|
$1,300.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
50.000
|
$85.000
|
$90.000
|
$130.000
|
$110.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
2.000
|
$300.000
|
$175.000
|
$1,300.000
|
$370.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
108.000
|
$2.500
|
$3.250
|
$10.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
2,281.000
|
$1.120
|
$0.850
|
$1.000
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
39,463.000
|
$0.620
|
$0.750
|
$1.000
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
49,891.000
|
$0.600
|
$0.750
|
$1.000
|
$0.950
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,360.000
|
$2.000
|
$0.750
|
$1.000
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,123.000
|
$1.540
|
$0.750
|
$1.000
|
$0.600
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
434.000
|
$6.000
|
$7.000
|
$5.500
|
$5.800
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,575.000
|
$0.500
|
$0.350
|
$0.500
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
10,890.000
|
$0.500
|
$0.350
|
$0.400
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,890.000
|
$0.500
|
$0.350
|
$0.400
|
$0.450
|
|
REFL PAV MRKR TY I-C
|
EA
|
247.000
|
$3.000
|
$3.000
|
$4.000
|
$4.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
270.000
|
$2.500
|
$3.000
|
$4.000
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
48,279.000
|
$0.500
|
$0.350
|
$0.500
|
$2.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$460.000
|
$750.000
|
$250.000
|
$280.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$7,065.590
|
$6,000.000
|
$8,500.000
|
$9,100.000
|
|
|
TREE PROTECTION
|
EA
|
5.000
|
$150.000
|
$250.000
|
$600.000
|
$600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
28.000
|
$190.000
|
$180.000
|
$250.000
|
$317.000
|
|
|
REMOVE STRUCTURAL MANHOLE
|
EA
|
8.000
|
$2,500.000
|
$500.000
|
$3,500.000
|
$3,500.000
|
|
|
48" PRECAST CONCRETE MANHOLE (0'-4')
|
EA
|
1.000
|
$6,000.000
|
$5,000.000
|
$7,000.000
|
$7,200.000
|
|
|
48" PRECAST CONCRETE MANHOLE (4'-8')
|
EA
|
11.000
|
$6,500.000
|
$10,000.000
|
$10,000.000
|
$10,200.000
|
|
|
48" PRECAST CONCRETE MANHOLE (8'-12')
|
EA
|
3.000
|
$9,000.000
|
$15,000.000
|
$13,300.000
|
$13,700.000
|
|
|
48" PRECAST CONCRETE MANHOLE (12'-16')
|
EA
|
2.000
|
$12,000.000
|
$20,000.000
|
$17,500.000
|
$18,000.000
|
|
|
RECONNECT EXISTING SEWER MAINS
|
EA
|
13.000
|
$1,500.000
|
$500.000
|
$2,300.000
|
$2,300.000
|
|
|
TIE-IN TO EXISTING MANHOLE
|
EA
|
1.000
|
$2,000.000
|
$500.000
|
$4,500.000
|
$4,700.000
|
|
|
4" SDR-26 PVC GRAVITY SEWER LINE
|
LF
|
50.000
|
$40.000
|
$35.000
|
$70.000
|
$73.000
|
|
|
6" SDR-26 PVC GRAVITY SEWER LINE
|
LF
|
3,056.000
|
$50.000
|
$75.000
|
$120.000
|
$122.000
|
|
|
8" SDR-26 PVC GRAVITY SEWER LINE
|
LF
|
1,623.000
|
$60.000
|
$75.000
|
$150.000
|
$150.000
|
|
|
15" SDR-26 PVC GRAVITY SEWER LINE
|
LF
|
100.000
|
$100.000
|
$100.000
|
$380.000
|
$390.000
|
|
|
ENCAS FOR 4" SWR LINE (BORE OR OPN-CUT)
|
LF
|
50.000
|
$70.000
|
$100.000
|
$300.000
|
$270.000
|
|
|
ENCAS FOR 6" SWR LINE (BORE OR OPN-CUT)
|
LF
|
420.000
|
$85.000
|
$150.000
|
$340.000
|
$345.000
|
|
|
ENCAS FOR 8" SWR LINE (BORE OR OPN-CUT)
|
LF
|
250.000
|
$100.000
|
$200.000
|
$415.000
|
$420.000
|
|
|
ENCAS FOR 15" SWRLINE (BORE OR OPN-CUT)
|
LF
|
100.000
|
$140.000
|
$300.000
|
$700.000
|
$720.000
|
|
|
RMV/ABAND PRSR GRT EXIST.SWR LN(2"-12")
|
LF
|
4,710.000
|
$8.000
|
$15.000
|
$60.000
|
$60.000
|
|
|
TRENCH SAFE (DEPTHS GREATER THAN 5 FT.)
|
LF
|
4,829.000
|
$2.250
|
$1.000
|
$6.000
|
$5.500
|
|
|
TEMPORARY PAVEMENT REPLACEMENT
|
LF
|
310.000
|
$28.000
|
$65.000
|
$60.000
|
$58.000
|
|
|
PRE/POST TELEVISION INSPECTION
|
LF
|
4,829.000
|
$1.500
|
$2.500
|
$18.000
|
$18.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
2,688.000
|
$150.000
|
$90.000
|
$190.000
|
$190.000
|
|
|
SEWAGE SERVICE LINE
|
EA
|
60.000
|
$750.000
|
$3,000.000
|
$4,800.000
|
$4,900.000
|
|
|
PLUG WASTEWATER LINE
|
EA
|
2.000
|
$500.000
|
$1,000.000
|
$1,200.000
|
$1,200.000
|
|
Totals: |
$6,666,992.926
|
$8,286,442.900
|
$9,296,947.450
|
$9,732,425.720
|