Show Job Controls
Bid Cobra

STARR US 83 (0038-06-051)

Items: 84

County: STARR
Length: 0.0000 MILES
Highway: US 83
District: PHARR
Control Number: 0038-06-051
DBE Goal: 4.0%
Project: F 2025(674)
Guaranty: $32,000.00
Time: 117 WORKING DAYS
Engineer's Estimate: $1,661,328.00
Date: 04/04/2025 (1 year ago)
Contract Number: 4253223
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00183412
Contract Type: Federal
Project Description: CONSTRUCT SIDEWALK AND RAMPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
FRANCISCO CANTU
DANNY FLORES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$1,661,328.00
$1,458,980.10
Over/Under Est: -12.18% -$202,347.90
$1,478,530.00
Over/Under Est: -11% -$182,798.00
Amt Left: 1.34% $19,549.90
$1,496,860.71
Over/Under Est: -9.9% -$164,467.29
Amt Left: 2.6% $37,880.61
Delta: -1.24% -$18,330.71
$1,581,914.79
Over/Under Est: -4.78% -$79,413.21
Amt Left: 8.43% $122,934.69
Delta: -5.68% -$85,054.08
$1,921,151.32
Over/Under Est: 15.64% $259,823.32
Amt Left: 31.68% $462,171.22
Delta: -21.44% -$339,236.53
$2,403,352.40
Over/Under Est: 44.66% $742,024.40
Amt Left: 64.73% $944,372.30
Delta: -25.10% -$482,201.08
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 6.85% $99,940.14
D&G ENERGY CORPORATION 5.88% $85,788.03
TEXAS ICON CONSTRUCTION, LLC 3.82% $55,733.04
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 3.21% $46,833.26
Total: 19.76% $288,294.47

Bid Items & Bid Tabulations

84 Total 0 of 84
STARR  |  US 83  |  PHARR  |  0038-06-051  |  04/04/2025  |  $1,661,328.00  |  F 2025(674)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  117 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REIM CONSTRUCTION, INC.
ARTILLERY L.L.C.
STX CIVIL
3LW CIVIL LLC
TI-ZACK CONCRETE, LLC
ICOS MANAGEMENT, LLC
PREPARING ROW
AC 1.000 $10,000.000 $3,500.000 $10,000.000 $10,000.000 $31,462.020 $11,500.000 $11,000.000
REMOV CONC (RIPRAP)
SY 468.000 $35.000 $29.750 $36.000 $25.000 $30.280 $20.460 $44.000
REMOV CONC (DRIVEWAYS)
SY 453.000 $20.000 $19.500 $36.000 $25.000 $47.190 $28.190 $66.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 105.000 $30.000 $14.500 $27.000 $20.000 $53.080 $30.400 $55.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 909.000 $15.000 $27.750 $8.000 $10.000 $8.350 $17.560 $22.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 885.000 $18.000 $6.600 $15.000 $15.000 $50.000 $18.030 $66.000
EMBANK (FNL)(OC)(TY A)
CY 13.000 $100.000 $83.500 $100.000 $35.000 $50.270 $50.800 $110.000
FURN & PLACE TOPSOIL (4")
SY 6,189.000 $5.000 $5.900 $5.000 $1.500 $4.250 $2.450 $5.000
BLOCK SODDING
SY 6,189.000 $10.000 $12.000 $6.000 $4.000 $0.100 $4.890 $5.000
VEGETATIVE WATERING
TGL 105.400 $50.000 $41.500 $40.000 $10.000 $0.100 $1.150 $1.000
CL C CONC (COLLAR)
EA 11.000 $2,200.000 $814.000 $500.000 $1,200.000 $870.490 $2,990.220 $2,200.000
CL C CONC (MISC)
CY 13.100 $1,000.000 $844.000 $700.000 $850.000 $849.390 $934.840 $880.000
RIPRAP (CONC)(6 IN)
CY 68.600 $500.000 $487.000 $650.000 $580.000 $529.210 $934.840 $660.000
RAIL (HANDRAIL)(TY B)
LF 231.000 $185.000 $129.000 $150.000 $150.000 $135.600 $172.500 $165.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 13.000 $400.000 $436.000 $900.000 $800.000 $498.360 $959.560 $1,100.000
RC PIPE (CL III)(18 IN)
LF 270.000 $100.000 $85.000 $100.000 $125.000 $110.690 $239.050 $242.000
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 1.000 $7,500.000 $3,890.000 $6,000.000 $5,000.000 $6,560.740 $13,690.350 $7,700.000
INLET (COMPL)(PSL)(RC)(5FTX5FT)
EA 2.000 $10,000.000 $5,930.000 $8,000.000 $9,000.000 $8,959.900 $14,945.530 $16,500.000
INLET (COMPL)(PAZD)(RC)(5FTX5FT)
EA 5.000 $10,000.000 $6,640.000 $8,000.000 $8,500.000 $9,218.260 $14,949.590 $15,400.000
GRATE & FRAME
EA 52.000 $2,000.000 $1,540.000 $1,700.000 $1,000.000 $2,278.400 $1,937.350 $2,200.000
ADJUSTING MANHOLES
EA 1.000 $2,000.000 $889.000 $500.000 $1,000.000 $720.670 $319.200 $2,200.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 6.000 $1,500.000 $604.000 $500.000 $250.000 $261.940 $266.000 $1,100.000
REMOV STR (INLET)
EA 6.000 $1,250.000 $489.000 $500.000 $550.000 $823.070 $2,017.970 $1,650.000
REMOV STR (PIPE)
LF 233.000 $20.000 $28.000 $20.000 $20.000 $69.840 $52.490 $17.000
MOBILIZATION
LS 1.000 $146,360.000 $115,000.000 $100,000.000 $115,000.000 $130,004.250 $196,200.000 $55,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $2,000.000 $4,000.000 $2,500.000 $22,217.060 $5,175.000 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $9,990.000 $12,000.000 $7,000.000 $7,854.930 $1.150 $5,500.000
TMA (STATIONARY)
DAY 116.000 $200.000 $66.500 $300.000 $5.000 $1.000 $1.150 $1.000
TMA (MOBILE OPERATION)
DAY 2.000 $250.000 $666.000 $500.000 $10.000 $0.100 $1.150 $550.000
SANDBAGS FOR EROSION CONTROL
EA 97.000 $9.000 $4.200 $20.000 $1.000 $0.100 $1.150 $1.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 343.000 $6.000 $3.250 $5.000 $4.000 $0.100 $1.150 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,698.000 $7.000 $4.500 $5.000 $4.000 $0.100 $0.120 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,041.000 $2.000 $1.000 $2.000 $1.000 $0.100 $0.120 $1.000
CONC CURB (TY II)
LF 464.000 $30.000 $25.500 $20.000 $35.000 $41.300 $55.480 $88.000
CONC CURB & GUTTER (TY I)
LF 19.000 $30.000 $37.250 $40.000 $40.000 $44.190 $55.480 $165.000
CONC CURB & GUTTER (TY II)
LF 1,076.000 $40.000 $25.750 $35.000 $45.000 $25.370 $55.480 $88.000
CONC CURB (SLOTTED)
LF 31.000 $40.000 $51.500 $100.000 $60.000 $31.450 $55.480 $132.000
CONC CURB & GUTTER (ARMOR CURB)
LF 98.000 $275.000 $349.000 $300.000 $100.000 $315.030 $271.250 $220.000
DRIVEWAYS (CONC)
SY 1,240.000 $90.000 $78.000 $90.000 $110.000 $88.030 $135.790 $154.000
CONC SIDEWALKS (4")
SY 3,898.000 $80.000 $54.000 $72.000 $95.000 $57.940 $107.450 $88.000
CONC SIDEWALKS (6")
SY 100.000 $100.000 $63.500 $90.000 $120.000 $79.570 $161.740 $110.000
CURB RAMPS (TY 1)
SY 64.000 $165.000 $317.000 $150.000 $160.000 $132.820 $161.740 $1,320.000
CURB RAMPS (TY 3)
SY 161.000 $165.000 $471.000 $150.000 $160.000 $153.610 $161.740 $1,320.000
CURB RAMPS (TY 6)
SY 29.000 $165.000 $321.000 $150.000 $190.000 $270.550 $161.740 $1,980.000
CURB RAMPS (TY 7)
SY 48.000 $165.000 $190.000 $150.000 $200.000 $183.850 $161.740 $1,980.000
CURB RAMPS (TY 10)
SY 139.000 $165.000 $263.000 $150.000 $150.000 $148.610 $161.740 $1,320.000
CURB RAMPS (TY 21)
SY 16.000 $165.000 $225.000 $150.000 $200.000 $159.510 $161.740 $1,320.000
CONC SIDEWALKS (SPECIAL)
SY 544.000 $225.000 $221.000 $170.000 $200.000 $269.460 $311.610 $132.000
CHAIN LINK FENCE (INSTALL) (6')
LF 17.000 $50.000 $69.000 $150.000 $50.000 $74.400 $115.000 $220.000
GATE (TY 1)
EA 2.000 $5,000.000 $1,240.000 $1,000.000 $2,500.000 $1,338.000 $632.500 $2,200.000
GATE (TY 2)
EA 3.000 $10,000.000 $1,280.000 $1,000.000 $3,000.000 $1,374.000 $862.500 $2,200.000
CONDT (PVC) (SCH 40) (4")
LF 200.000 $21.000 $40.250 $40.000 $39.750 $32.830 $41.400 $55.000
ELEC CONDR (NO.6) BARE
LF 285.000 $3.000 $2.200 $2.000 $2.150 $2.690 $2.240 $50.000
GROUND BOX TY A (122311)W/APRON
EA 3.000 $1,300.000 $1,340.000 $1,200.000 $1,324.840 $1,022.780 $1,380.000 $1,650.000
GROUND BOX TY D (162922)
EA 6.000 $1,100.000 $1,470.000 $1,350.000 $1,451.810 $1,026.780 $1,512.250 $1,870.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,300.000 $1,470.000 $1,350.000 $1,451.800 $1,537.170 $1,512.250 $2,750.000
REMOVE GROUND BOX
EA 7.000 $200.000 $391.000 $350.000 $386.410 $292.130 $402.500 $550.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 13.000 $800.000 $742.000 $1,000.000 $85.000 $714.730 $747.500 $220.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $1,000.000 $932.000 $1,000.000 $835.000 $931.370 $747.500 $1,650.000
RELOCATE SM RD SN SUP&AM TY S80
EA 10.000 $650.000 $243.000 $300.000 $775.000 $784.440 $632.500 $1,650.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 192.000 $1.000 $11.250 $12.000 $11.040 $12.000 $2.300 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,884.000 $4.000 $10.000 $10.000 $9.940 $10.800 $12.420 $4.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 145.000 $1.000 $112.000 $105.000 $110.400 $120.000 $1.840 $4.000
PAVEMENT SLER 6"
LF 145.000 $1.000 $1.650 $2.000 $1.660 $1.800 $0.690 $5.000
PAVEMENT SLER 8"
LF 192.000 $1.000 $2.250 $2.500 $2.210 $2.400 $1.380 $5.000
PAVEMENT SLER 24"
LF 1,884.000 $5.000 $3.300 $3.500 $3.310 $3.600 $2.300 $5.000
PAVEMENT SLER (ARROW)
EA 4.000 $50.000 $56.000 $75.000 $55.200 $60.000 $46.000 $1,100.000
PAVEMENT SLER (WORD)
EA 5.000 $50.000 $83.500 $100.000 $82.800 $90.000 $46.000 $1,100.000
PREFAB PM TY B (W)(ARROW)
EA 4.000 $400.000 $1,670.000 $1,500.000 $1,656.050 $1,800.000 $322.000 $1,100.000
PREFAB PM TY B (W)(WORD)
EA 5.000 $400.000 $2,230.000 $2,000.000 $2,208.070 $2,400.000 $322.000 $1,100.000
REFL PAV MRKR TY I-C
EA 11.000 $10.000 $56.000 $50.000 $55.200 $60.000 $7.820 $550.000
ELIM EXT PM & MRKS (4")
LF 176.000 $1.000 $2.800 $4.000 $2.760 $3.000 $1.840 $2.000
ELIM EXT PM & MRKS (8")
LF 185.000 $2.000 $5.600 $5.000 $5.520 $6.000 $2.300 $2.000
ELIM EXT PM & MRKS (12")
LF 249.000 $2.000 $8.350 $9.000 $8.280 $9.000 $4.600 $2.000
ELIM EXT PM & MRKS (24")
LF 269.000 $5.000 $11.250 $9.000 $11.040 $12.000 $9.200 $2.000
ELIM EXT PM & MRKS (ARROW)
EA 4.000 $100.000 $112.000 $100.000 $110.400 $120.000 $92.000 $220.000
PED SIG SEC (LED)(2 INDICATIONS)
EA 8.000 $800.000 $1,010.000 $1,000.000 $999.150 $645.610 $1,040.750 $1,100.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,670.000 $2.500 $2.600 $3.000 $2.590 $3.390 $2.700 $4.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,710.000 $3.000 $2.950 $3.000 $2.930 $4.090 $3.050 $4.000
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 2,780.000 $2.000 $2.600 $3.000 $2.590 $2.040 $2.700 $4.000
PED POLE ASSEMBLY
EA 8.000 $2,500.000 $3,750.000 $3,500.000 $3,709.560 $1,860.070 $3,864.000 $5,500.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,500.000 $1,040.000 $1,000.000 $1,032.270 $783.610 $10.930 $1,650.000
REMOVAL OF SIGNAL HEAD ASSM
EA 8.000 $200.000 $123.000 $170.000 $121.440 $255.610 $126.500 $220.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $150.000 $33.500 $60.000 $33.120 $255.610 $34.500 $55.000
Totals: $1,661,328.000 $1,458,980.100 $1,478,530.000 $1,496,860.710 $1,581,914.785 $1,921,151.328 $2,403,352.400
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $4,000.00