Show Job Controls
Bid Cobra

SMITH US0069 (6500-52-001)

Items: 39

County: SMITH
Length: 0.0100 MILES
Highway: US0069
District: TYLER
Control Number: 6500-52-001
DBE Goal: 0.0%
Project: RMC - A00220799
Guaranty: $11,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $568,750.00
Date: 05/12/2026 (29 days ago)
Contract Number: 5261002
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00220799
Project Description: REPAIR METAL BEAM GUARD FENCE IN VARIOUS LOCATIONS IN SMITH AND CHEROKEE COUNTIES.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
2709 W FRONT ST, TYLER, TX 75702
JOSH FULTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$568,750.00
1
$631,830.00
Over/Under Est: 11.09% $63,080.00

Bid Items & Bid Tabulations

39 Total 0 of 39
SMITH  |  US0069  |  TYLER  |  6500-52-001  |  05/12/2026  |  $568,750.00  |  RMC - A00220799  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 30.000 $150.000 $100.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 30.000 $200.000 $100.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 30.000 $250.000 $100.000
CONC STR REPAIR (STANDARD)
SF 30.000 $200.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $700.000 $500.000
MOBILIZATION (CALLOUT)
EA 30.000 $1,000.000 $1.000
TMA (STATIONARY)
DAY 50.000 $300.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $30.000 $40.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1,000.000 $5.000 $5.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 50.000 $25.000 $10.000
SHORT RADIUS (28")
LF 50.000 $40.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,500.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $4.000 $6.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 4,000.000 $25.000 $35.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 20.000 $35.000 $100.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 5.000 $100.000 $400.000
REPLACE TIMBER POST W/O CONC FND
EA 100.000 $60.000 $100.000
REPLACE STEEL POST W/O CONC FND
EA 100.000 $75.000 $100.000
REALIGN POSTS
EA 300.000 $20.000 $20.000
REPLACE TERMINAL ANCHOR POSTS
EA 8.000 $50.000 $50.000
REM OBSOLETE GET & REPL W/ SGT
EA 60.000 $4,000.000 $4,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $1,000.000 $1,100.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $40.000 $43.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 25.000 $120.000 $200.000
REPLACE BLOCKOUT
EA 200.000 $35.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $100.000 $300.000
RESET SGT IMPACT HEAD
EA 15.000 $200.000 $100.000
REPLACE SGT OBJECT MARKER
EA 10.000 $40.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $80.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $80.000 $100.000
REPLACE HINGED TOP SGT POST (STEEL)
EA 5.000 $200.000 $2,000.000
REALIGN HINGED TOP SGT POST ((STEEL)
EA 5.000 $80.000 $1,000.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 100.000 $180.000 $250.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 12.000 $100.000 $400.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 6.000 $100.000 $200.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 6.000 $2,000.000 $3,000.000
CHECK / RE-TENSION CABLE (TL-4)
EA 6.000 $100.000 $500.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 1,000.000 $7.500 $8.000
REPAIR (STEEL POST W/CHANNEL IRON RAIL)
LF 50.000 $150.000 $100.000
Totals: $568,750.000 $631,830.000