SMITH FM3341 (6451-11-001)

Items: 23

County: SMITH
Length: N/A
Highway: FM3341
District: TYLER
Control Number: 6451-11-001
DBE Goal: N/A
Project: BPM - 645111001
Guaranty: N/A
Time: 85 W
Engineer's Estimate: $671,656.25
Date: 11/02/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
PAUL SCHNEIDER
TRAVIS SINGLETON
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (9)
E
Engineer's Estimate
$671,656.25
$527,250.00
Over/Under Est: -21.5% -$144,406.25
Over/Under Est: -12.69% -$85,244.50
Amt Left: 11.22% $59,161.75
Over/Under Est: -11.08% -$74,439.00
Amt Left: 13.27% $69,967.25
Delta: -1.84% -$10,805.50
Over/Under Est: -0.95% -$6,363.75
Amt Left: 26.18% $138,042.50
Delta: -11.40% -$68,075.25
Over/Under Est: 1.6% $10,752.50
Amt Left: 29.43% $155,158.75
Delta: -2.57% -$17,116.25
Over/Under Est: 8.31% $55,808.12
Amt Left: 37.97% $200,214.37
Delta: -6.60% -$45,055.62
Over/Under Est: 18.27% $122,700.75
Amt Left: 50.66% $267,107.00
Delta: -9.20% -$66,892.63
Over/Under Est: 26.72% $179,456.25
Amt Left: 61.42% $323,862.50
Delta: -7.14% -$56,755.50
Over/Under Est: 34% $228,343.73
Amt Left: 70.7% $372,749.98
Delta: -5.74% -$48,887.48

Bid Items & Bid Tabulations

23 Total 0 of 23
SMITH  |  FM3341  |  TYLER  |  6451-11-001  |  11/02/2023  |  $671,656.25  |  BPM - 645111001  |  BRIDGE PREVENT MAINT  |  85 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
THK CONSTRUCTION LLC
RED BARON BUILDING COMPANY, LLC
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
AAD CONTRACTING INC.
TRUE ROADS CONSTRUCTION, LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
FNH CONSTRUCTION, LLC
EAST TEXAS BRIDGE, INC.
PREPARING ROW(OPT1)
STA 11.000 $2,000.000 $2,000.000 $2,500.000 $100.000 $1,000.000 $10,000.000 $4,000.000 $3,500.000 $8,000.000 $7,500.000
REMOVING CONC (RIPRAP)
SY 48.000 $75.000 $100.000 $56.000 $145.000 $50.000 $40.000 $150.000 $65.000 $100.000 $50.000
REMOVING CONCRETE(MOW STRIP)
LF 7.000 $25.000 $50.000 $50.000 $100.000 $150.000 $25.000 $600.000 $100.000 $200.000 $50.000
EXCAVATION (CHANNEL)
CY 57.000 $45.000 $200.000 $30.000 $45.000 $40.000 $35.000 $80.000 $75.000 $100.000 $100.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 109.000 $65.000 $100.000 $30.000 $32.000 $45.000 $50.000 $120.000 $55.000 $100.000 $150.000
BOND FBR MTRX SEED (PERM) (URBAN)(SAND)
SY 125.000 $5.000 $1.000 $9.000 $2.500 $10.000 $2.000 $6.500 $7.000 $10.000 $10.000
FERTILIZER
AC 0.030 $2,000.000 $5,000.000 $15,000.000 $100.000 $5,000.000 $2,000.000 $13,000.000 $1,400.000 $30,000.000 $3,333.330
VEGETATIVE WATERING
MG 1.375 $150.000 $1,000.000 $10.000 $10.000 $500.000 $10.000 $325.000 $1,000.000 $1,500.000 $363.630
FLOWABLE BACKFILL
CY 88.000 $380.000 $600.000 $685.000 $250.000 $300.000 $240.000 $600.000 $500.000 $350.000 $450.000
CL C CONC (PILE ENCASEMENT)
CY 72.000 $3,500.000 $1,000.000 $2,500.000 $4,000.000 $3,500.000 $1,500.000 $3,400.000 $4,500.000 $3,000.000 $3,125.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 2,700.000 $20.000 $20.000 $30.000 $10.000 $15.000 $20.000 $25.000 $22.000 $20.000 $24.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 8.000 $400.000 $500.000 $300.000 $600.000 $245.000 $250.000 $2,000.000 $325.000 $1,000.000 $1,500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 355.000 $250.000 $250.000 $135.000 $165.000 $250.000 $175.000 $175.000 $265.000 $500.000 $350.000
RIPRAP (CONC)(4 IN)
CY 6.000 $750.000 $1,000.000 $1,000.000 $750.000 $800.000 $1,000.000 $1,800.000 $850.000 $550.000 $1,500.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 364.000 $200.000 $250.000 $225.000 $275.000 $290.000 $275.000 $250.000 $250.000 $300.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 1.000 $1,000.000 $1,000.000 $1,200.000 $750.000 $3,000.000 $1,000.000 $4,500.000 $1,000.000 $1,500.000 $3,000.000
MOBILIZATION
LS 1.000 $55,000.000 $70,000.000 $55,000.000 $58,000.000 $100,000.000 $150,000.000 $65,000.000 $80,000.000 $80,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $5,000.000 $4,800.000 $1,000.000 $2,000.000 $10,000.000 $4,000.000 $2,500.000 $8,500.000 $13,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $4.000 $1.000 $5.000 $3.000 $5.000 $4.000 $10.000 $5.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.500 $1.000 $2.000 $1.500 $2.000 $1.000 $2.500 $1.000 $2.000 $1.000
REPLACE SINGLE GDRAIL TERM POST(STEEL)
EA 2.000 $500.000 $500.000 $1,000.000 $5,000.000 $1,000.000 $100.000 $1,250.000 $500.000 $2,000.000 $2,000.000
TMA (STATIONARY)
DAY 10.000 $300.000 $500.000 $300.000 $100.000 $200.000 $150.000 $200.000 $300.000 $250.000 $500.000
MAINTENANCE SPEED LIMIT SIGNING
EA 10.000 $4,000.000 $500.000 $250.000 $100.000 $250.000 $500.000 $1,000.000 $2,000.000 $500.000 $3,000.000
Totals: $671,656.250 $527,250.000 $586,411.750 $597,217.250 $665,292.500 $682,408.750 $727,464.375 $794,357.000 $851,112.500 $899,999.991