Show Job Controls
Bid Cobra

SMITH US0069 (6400-47-001)

Items: 55

County: SMITH
Length: N/A
Highway: US0069
District: TYLER
Control Number: 6400-47-001
DBE Goal: N/A
Project: RMC - 640047001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $542,785.00
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
PAUL SCHNEIDER
TRAVIS SINGLETON
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$542,785.00
1
$517,456.00
Over/Under Est: -4.67% -$25,329.00
Over/Under Est: -2.58% -$13,999.00
Amt Left: 2.19% $11,330.00

Bid Items & Bid Tabulations

55 Total 0 of 55
SMITH  |  US0069  |  TYLER  |  6400-47-001  |  06/01/2022  |  $542,785.00  |  RMC - 640047001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
T&L CLEANING SERVICES LLC
REMOVING CONC (RIPRAP)
SY 10.000 $30.000 $50.000 $1.000
CONC STR REPAIR (STANDARD)
SF 70.000 $100.000 $80.000 $60.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $300.000 $550.000 $1.000
MOBILIZATION (CALLOUT)
EA 30.000 $400.000 $20.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 130.000 $25.000 $40.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 65.000 $40.000 $85.000 $50.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 25.000 $120.000 $30.000 $10.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 10.000 $41.000 $40.000 $10.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 13.000 $1,300.000 $800.000 $1,500.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $1,000.000 $10.000 $1.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1,050.000 $10.000 $3.000 $1.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 125.000 $10.000 $3.000 $1.000
TRANSITION ADJUSTMENT
EA 2.000 $150.000 $1.000 $1.000
SHORT RADIUS
LF 25.000 $30.000 $50.000 $10.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $4,000.000 $700.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 25.000 $25.000 $15.000 $1.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 25.000 $34.000 $15.000 $1.000
REMOVE METAL BEAM GUARD FENCE
LF 130.000 $5.000 $20.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $200.000 $50.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,000.000 $2,000.000 $4,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $200.000 $1.000 $1.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $900.000 $1.000 $1.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,760.000 $24.000 $23.000 $28.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 20.000 $35.000 $50.000 $1.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 9.000 $50.000 $40.000 $30.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 214.000 $50.000 $85.000 $20.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $60.000 $100.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 2.000 $190.000 $350.000 $1.000
REALIGN POSTS
EA 370.000 $40.000 $15.000 $20.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 56.000 $100.000 $25.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 150.000 $100.000 $25.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 760.000 $30.000 $35.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $80.000 $120.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 3.000 $60.000 $300.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 60.000 $2,700.000 $4,000.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $1,200.000 $1,000.000 $700.000
REM & RESET SGT IMPACT HEAD
EA 12.000 $500.000 $25.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 9.000 $55.000 $90.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $100.000 $90.000 $1.000
REPLACE SGT STRUT
EA 3.000 $100.000 $90.000 $1.000
REPLACE SGT OBJECT MARKER
EA 12.000 $40.000 $70.000 $1.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 50.000 $15.000 $1.000 $15.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $4,000.000 $2,500.000 $10,000.000
REPAIR (TRACC)
EA 6.000 $1,500.000 $1,000.000 $500.000
REPAIR (WIDE TRACC)
EA 2.000 $1,000.000 $300.000 $500.000
REPAIR (NARROW QUAD)
EA 2.000 $800.000 $300.000 $500.000
REPAIR (QUAD) (N) (BAY)
EA 3.000 $1,000.000 $900.000 $500.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $10,000.000 $5,000.000 $10,000.000
REPAIR (FASTRACC) (BAY)
EA 4.000 $1,000.000 $1,000.000 $500.000
QUAD(N)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 5.000 $1,000.000 $400.000 $300.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 100.000 $80.000 $1.000 $1.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 5.000 $37.000 $1.000 $1.000
REPAIR (TY PR1) (MOD)
LF 35.000 $179.000 $20.000 $1.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 25.000 $35.000 $1.000 $100.000
TMA (STATIONARY)
DAY 50.000 $200.000 $10.000 $100.000
Totals: $542,785.000 $517,456.000 $528,786.000