EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
250.000
|
$20.000
|
$20.000
|
|
|
BACKFILL (TY A)
|
LF
|
10,000.000
|
$2.250
|
$3.000
|
|
|
FOG SEAL (SS-1H)
|
GAL
|
200.000
|
$50.000
|
$20.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
73.000
|
$225.000
|
$165.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
1,136.000
|
$125.000
|
$165.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
9,196.000
|
$125.000
|
$127.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
4,833.000
|
$3.000
|
$5.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
500.000
|
$50.000
|
$100.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
71,978.000
|
$4.000
|
$3.500
|
|
|
PLANE ASPH CONC PAV(4" TO 6")
|
SY
|
5,000.000
|
$7.000
|
$2.750
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
500.000
|
$175.000
|
$150.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
200.000
|
$230.000
|
$200.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
10.000
|
$140.000
|
$100.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
20.000
|
$125.000
|
$100.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
10.000
|
$120.000
|
$150.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
20.000
|
$125.000
|
$140.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
100.000
|
$180.000
|
$180.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
100.000
|
$372.000
|
$500.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
1,000.000
|
$10.000
|
$15.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
1,000.000
|
$30.000
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$10,000.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
2.000
|
$5,000.000
|
$2,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$36,000.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
10.000
|
$50.000
|
$150.000
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
5.000
|
$175.000
|
$140.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
50,000.000
|
$0.250
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
25.000
|
$25.000
|
$40.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
25.000
|
$30.000
|
$1,500.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,100.000
|
$1,000.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
1.000
|
$1,200.000
|
$1,000.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
25.000
|
$8.000
|
$10.000
|
|
|
MTL THRIE-BEAM GD FEN ADJUSTMENT
|
LF
|
25.000
|
$12.000
|
$10.000
|
|
|
TRANSITION ADJUSTMENT
|
EA
|
1.000
|
$100.000
|
$100.000
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$30.000
|
$50.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,200.000
|
$4,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
25.000
|
$5.500
|
$10.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$450.000
|
$2,000.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
1.000
|
$2,500.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,000.000
|
$100.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
600.000
|
$35.000
|
$10.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
10.000
|
$30.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$750.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
50.000
|
$600.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$725.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$800.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
10.000
|
$850.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
2.000
|
$650.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
15.000
|
$650.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
8.000
|
$625.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$300.000
|
$200.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$225.000
|
$200.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
1.000
|
$250.000
|
$200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$200.000
|
$50.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,000.000
|
$20.000
|
$20.000
|
|
|
REMOVE LRSA
|
EA
|
3.000
|
$2,000.000
|
$2,000.000
|
|
|
REMOVE AND RESET LRSA
|
EA
|
8.000
|
$4,100.000
|
$2,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
450.000
|
$47.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
500.000
|
$30.000
|
$5.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
900.000
|
$30.000
|
$5.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
25.000
|
$30.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
150.000
|
$50.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
100.000
|
$25.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
300.000
|
$25.000
|
$5.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
75.000
|
$50.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
25.000
|
$45.000
|
$10.000
|
|
|
INSTL OM ASSM (OM-3L)(FLX)SRF
|
EA
|
25.000
|
$300.000
|
$10.000
|
|
|
INSTL OM ASSM (OM-3R)(FLX)SRF
|
EA
|
25.000
|
$300.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
350.000
|
$35.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
25.000
|
$30.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
250.000
|
$33.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
2,200.000
|
$1.000
|
$0.100
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
500.000
|
$1.500
|
$0.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
500.000
|
$0.750
|
$0.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
40,000.000
|
$0.720
|
$0.570
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
500.000
|
$3.500
|
$3.000
|
|
RE PV MRK TY I(BLACK)4"(SHADOW)(090MIL)
|
LF
|
100.000
|
$2.000
|
$5.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
|
LF
|
5,000.000
|
$1.000
|
$0.650
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
500.000
|
$0.250
|
$0.150
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
7,700.000
|
$0.200
|
$0.100
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
12,500.000
|
$0.220
|
$0.170
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
26,000.000
|
$0.220
|
$0.170
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
8,000.000
|
$0.170
|
$0.120
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
500.000
|
$0.250
|
$1.500
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
500.000
|
$0.250
|
$1.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
100.000
|
$1.000
|
$1.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
100.000
|
$1.000
|
$1.000
|
|
|
PAVEMENT SEALER 8"
|
LF
|
100.000
|
$1.500
|
$1.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
100.000
|
$2.100
|
$2.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
100.000
|
$2.250
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
1.000
|
$125.000
|
$50.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
1.000
|
$125.000
|
$50.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
1.000
|
$125.000
|
$50.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
10.000
|
$25.000
|
$50.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(060MIL)
|
LF
|
500.000
|
$1.100
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(060MIL)
|
LF
|
17,500.000
|
$0.200
|
$0.300
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
107,000.000
|
$0.550
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
479,000.000
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(060MIL)
|
LF
|
3,400.000
|
$0.450
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(060MIL)
|
LF
|
25,500.000
|
$0.250
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
274,000.000
|
$0.420
|
$0.360
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
20.000
|
$9.000
|
$7.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
1,000.000
|
$10.500
|
$2.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$200.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$330.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
1.000
|
$175.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$275.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
50.000
|
$42.000
|
$35.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
100.000
|
$2.750
|
$2.520
|
|
REFL PAV MRKR TY I-C
|
EA
|
700.000
|
$2.750
|
$1.500
|
|
REFL PAV MRKR TY I-R
|
EA
|
100.000
|
$2.750
|
$2.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,000.000
|
$2.750
|
$1.890
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
15,000.000
|
$2.500
|
$5.800
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
23,200.000
|
$0.350
|
$0.580
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
50.000
|
$1.500
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
50.000
|
$1.250
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$80.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
1.000
|
$150.000
|
$150.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$150.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
10.000
|
$55.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
100.000
|
$0.250
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
100.000
|
$0.270
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
100.000
|
$0.250
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
100.000
|
$0.850
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
100.000
|
$1.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
1.000
|
$25.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
1.000
|
$45.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
1.000
|
$25.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$35.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
10.000
|
$20.000
|
$100.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
100.000
|
$100.000
|
$150.000
|
|
|
EMERGENCY MOBILIZATION
|
EA
|
10.000
|
$750.000
|
$20.000
|
|
|
JT / CRCK SEAL (RUBBER - ASPHALT)
|
LMI
|
20.000
|
$850.000
|
$1,000.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
5,270.000
|
$35.000
|
$32.000
|
|
|
SPOT MOWING
|
AC
|
50.000
|
$100.000
|
$50.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
166.000
|
$70.000
|
$150.000
|
|
|
BROADCAST APPLICATION
|
AC
|
2,650.000
|
$33.000
|
$30.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
100.000
|
$2,000.000
|
$2,000.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
12.000
|
$1,500.000
|
$1,000.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
12.000
|
$1,250.000
|
$1,000.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
10.000
|
$150.000
|
$200.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
5.000
|
$11,000.000
|
$12,000.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
5.000
|
$11,000.000
|
$12,000.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
5.000
|
$3,500.000
|
$10,000.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
10.000
|
$20.000
|
$20.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
10.000
|
$20.000
|
$20.000
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
10.000
|
$30.000
|
$30.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
15.000
|
$2,200.000
|
$1,000.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
50.000
|
$1,200.000
|
$1,500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
3,000.000
|
$57.000
|
$60.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
300.000
|
$85.000
|
$95.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
150.000
|
$150.000
|
$125.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
50.000
|
$250.000
|
$250.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
20.000
|
$450.000
|
$425.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
5.000
|
$625.000
|
$800.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
2.000
|
$800.000
|
$800.000
|
|
|
TREE REMOVAL (48" - 60" DIA)
|
EA
|
2.000
|
$825.000
|
$1,000.000
|
|
|
TREE REMOVAL (60" - 72" DIA)
|
EA
|
1.000
|
$1,000.000
|
$1.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
500.000
|
$10.000
|
$10.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
2,000.000
|
$27.000
|
$25.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
50.000
|
$35.000
|
$40.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
10.000
|
$35.000
|
$50.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
50.000
|
$50.000
|
$10.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
25.000
|
$54.000
|
$10.000
|
|
|
REM / REPL TIMBER POST W / O CONC FND
|
EA
|
100.000
|
$55.000
|
$70.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
1.000
|
$125.000
|
$200.000
|
|
|
REALIGN POSTS
|
EA
|
125.000
|
$45.000
|
$50.000
|
|
|
INSTALL BLOCKOUT (TYPE SPECIFIED)
|
EA
|
40.000
|
$20.000
|
$5.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
125.000
|
$25.000
|
$30.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
1,500.000
|
$37.000
|
$40.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
200.000
|
$87.000
|
$80.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
1.000
|
$100.000
|
$30.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
8.000
|
$3,000.000
|
$1,500.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
30.000
|
$1,250.000
|
$1,000.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
8.000
|
$700.000
|
$500.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
25.000
|
$150.000
|
$100.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
25.000
|
$150.000
|
$100.000
|
|
|
REPLACE SGT STRUT
|
EA
|
25.000
|
$150.000
|
$100.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
125.000
|
$40.000
|
$10.000
|
|
|
REPAIR (TRACC)
|
EA
|
1.000
|
$3,000.000
|
$100.000
|
|
|
REPAIR (NARROW QUAD)
|
EA
|
1.000
|
$1,500.000
|
$100.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
5.000
|
$1,100.000
|
$800.000
|
|
|
REMOVE AND REPLACE (FASTRACC)
|
EA
|
1.000
|
$17,000.000
|
$500.000
|
|
|
REPAIR (FASTRACC)
|
LF
|
10.000
|
$700.000
|
$100.000
|
|
|
REPAIR (FASTRACC) (BAY)
|
EA
|
1.000
|
$900.000
|
$700.000
|
|
|
REPAIR (STEEL POST W/ W-BEAM - T101)
|
LF
|
15.000
|
$100.000
|
$80.000
|
|
|
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
|
LF
|
15.000
|
$20.000
|
$10.000
|
|
|
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
|
LF
|
15.000
|
$25.000
|
$20.000
|
|
|
REPLACE ABOVE-GROUND CONDUIT
|
LF
|
150.000
|
$9.000
|
$8.000
|
|
|
REPLACE UNDERGROUND CONDUIT
|
LF
|
100.000
|
$9.000
|
$7.000
|
|
|
REPLACE CONDUCTOR
|
LF
|
4,500.000
|
$6.000
|
$6.000
|
|
|
INSTALL ELECTRICAL SPLICE
|
EA
|
10.000
|
$55.000
|
$50.000
|
|
|
ROAD BORE
|
LF
|
100.000
|
$25.000
|
$20.000
|
|
|
REPLACE ROADWAY ILLUM ASSEMBLY (HPS)
|
EA
|
5.000
|
$900.000
|
$700.000
|
|
|
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
|
EA
|
5.000
|
$800.000
|
$800.000
|
|
|
REPLACE HIGH MAST LUMINAIRES
|
EA
|
50.000
|
$275.000
|
$250.000
|
|
|
REPLACE LUMINAIRE POLE
|
EA
|
2.000
|
$900.000
|
$1,000.000
|
|
|
REPLACE LUMINAIRE ARMS
|
EA
|
1.000
|
$150.000
|
$50.000
|
|
|
MAINTAIN HIGH MAST ILLUMINATION
|
EA
|
5.000
|
$1,500.000
|
$1,200.000
|
|
|
REPLACE ELECTRICAL SERVICE
|
EA
|
1.000
|
$3,500.000
|
$3,200.000
|
|
|
REPLACE TIMBER SERVICE POLE
|
EA
|
1.000
|
$800.000
|
$700.000
|
|
|
INSTALL GROUND BOX
|
EA
|
1.000
|
$600.000
|
$550.000
|
|
|
INSTALL FOUNDATION
|
EA
|
1.000
|
$750.000
|
$1,200.000
|
|
|
REPLACE TRANSFORMER BASE
|
EA
|
1.000
|
$450.000
|
$700.000
|
|
|
REPLACE TRANSFORMER BASE COVER
|
EA
|
1.000
|
$100.000
|
$50.000
|
|
|
REPLACE LAMP (POLE MOUNT FIXTURE)
|
EA
|
3.000
|
$200.000
|
$175.000
|
|
|
REPLACE LAMP (UNDERPASS FIXTURE)
|
EA
|
1.000
|
$200.000
|
$150.000
|
|
|
REPLACE LAMP (WALL PACK FIXTURE)
|
EA
|
1.000
|
$275.000
|
$250.000
|
|
|
REPLACE WALL PACK LUMINAIRE
|
EA
|
1.000
|
$275.000
|
$250.000
|
|
|
REPLACE FUSE
|
EA
|
50.000
|
$50.000
|
$85.000
|
|
|
REPLACE BREAKAWAY FUSE HOLDER
|
EA
|
15.000
|
$80.000
|
$125.000
|
|
|
REPLACE HAND-OFF-AUTO SWITCH
|
EA
|
1.000
|
$150.000
|
$100.000
|
|
|
REPLACE CONTACTOR
|
EA
|
1.000
|
$250.000
|
$250.000
|
|
|
REPLACE BREAKER PANEL
|
EA
|
1.000
|
$500.000
|
$400.000
|
|
|
REPLACE CIRCUIT BREAKER
|
EA
|
1.000
|
$900.000
|
$800.000
|
|
|
REPLACE LUMINAIRES
|
EA
|
25.000
|
$200.000
|
$240.000
|
|
|
REPLACE PHOTOCELL
|
EA
|
10.000
|
$85.000
|
$75.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
50.000
|
$115.000
|
$2,550.000
|
|
|
REPLACE OF SIGNAL HEAD ASSM
|
EA
|
1.000
|
$1,000.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
900.000
|
$150.000
|
$1.000
|
|
Totals: |
$4,924,948.000
|
$4,687,552.000
|