SMITH VARIOUS (0910-16-187)

Items: 52

County: SMITH
Length: 0.0000 MILES
Highway: VARIOUS
District: TYLER
Control Number: 0910-16-187
DBE Goal: 0.0%
Project: F 2B24(310)
Guaranty: $16,000.00
Time: 72 WORKING DAYS
Engineer's Estimate: $820,887.90
Date: 11/06/2024 (1 year ago)
Contract Number: 11243027
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00198667
Project Description: FY 27 PEDESTRIAN UPGRADES. CONSTRUCT PEDESTRIAN INFRASTRUCTURE TECHNOLOGY UPGRADES FOR PEDESTRIANS SUCH AS PUSH BUTTONS AT VARIOUS INTERSECTIONS INSIDE THE CITY OF TYLER.
Mail/Deliver Bids To: N/A
JUANITA DANIELSWEST
STEVEN SWINDELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$820,887.90
$865,454.00
Over/Under Est: 5.43% $44,566.10
Over/Under Est: 10.53% $86,407.69
Amt Left: 4.83% $41,841.59
Over/Under Est: 18.63% $152,919.10
Amt Left: 12.52% $108,353.00
Delta: -7.33% -$66,511.41
$1,057,294.07
Over/Under Est: 28.8% $236,406.17
Amt Left: 22.17% $191,840.07
Delta: -8.57% -$83,487.07
$1,116,483.00
Over/Under Est: 36.01% $295,595.10
Amt Left: 29.01% $251,029.00
Delta: -5.60% -$59,188.93
Over/Under Est: 51.69% $424,357.10
Amt Left: 43.88% $379,791.00
Delta: -11.53% -$128,762.00
$1,486,806.50
Over/Under Est: 81.12% $665,918.60
Amt Left: 71.79% $621,352.50
Delta: -19.40% -$241,561.50
Subcontractor Percentage Amount
TEXAS TRAFFIC CONTROL SYSTEMS, INC. 32.66% $284,685.46
STRIPING TECHNOLOGY, L.P. 4.65% $40,532.38
DIAMOND ELITE BARRICADES, LLC 1.34% $11,680.30
Total: 38.65% $336,898.14

Bid Items & Bid Tabulations

52 Total 0 of 52
SMITH  |  VARIOUS  |  TYLER  |  0910-16-187  |  11/06/2024  |  $820,887.90  |  F 2B24(310)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  72 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TIGHT LINE CONSTRUCTION, LLC
THK CONSTRUCTION LLC
GARRET SHIELDS INFRASTRUCTURE
3LW CIVIL LLC
FNH CONSTRUCTION, LLC
RISE UP CONSTRUCTION LLC
REYNOLDS & KAY, LTD.
REMOVING CONC (MEDIANS)
SY 3.000 $70.000 $300.000 $100.000 $100.000 $150.000 $100.000 $400.000 $150.000
REMOVING CONC (CURB)
LF 48.000 $12.000 $35.000 $20.000 $50.000 $14.500 $100.000 $55.000 $22.000
REMOVING CONC (CURB AND GUTTER)
LF 230.000 $20.000 $45.000 $20.000 $50.000 $25.000 $100.000 $67.000 $25.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 231.000 $30.000 $45.000 $30.000 $20.000 $25.000 $100.000 $50.000 $50.000
REMOVING CONC (PAVERS)
SY 30.000 $50.000 $50.000 $30.000 $20.000 $45.000 $100.000 $50.000 $55.000
REMOV STAB BASE & ASPH PAV (4"-14")
SY 312.000 $15.000 $20.000 $10.000 $50.000 $18.500 $50.000 $60.000 $40.000
BLOCK SODDING
SY 209.000 $7.000 $10.500 $12.000 $12.000 $25.000 $10.000 $11.000 $25.000
VEGETATIVE WATERING
MG 0.440 $5,000.000 $100.000 $20.000 $5,000.000 $231.540 $500.000 $5,000.000 $350.000
RIPRAP (CONC)(6 IN)
CY 5.000 $1,950.000 $1,250.000 $1,500.000 $600.000 $1,398.190 $650.000 $800.000 $1,250.000
ADJUSTING MANHOLES
EA 1.000 $4,300.000 $3,000.000 $1,000.000 $1,000.000 $3,500.000 $250.000 $1,700.000 $1,000.000
MOBILIZATION
LS 1.000 $80,000.000 $70,000.000 $62,000.000 $85,000.000 $103,500.000 $100,000.000 $80,000.000 $229,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $4,000.000 $6,500.000 $3,293.190 $5,000.000 $20,000.000 $8,500.000 $5,000.000 $12,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 120.000 $8.000 $8.000 $7.210 $6.000 $3.500 $4.000 $5.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 120.000 $2.000 $2.000 $3.210 $1.000 $1.000 $2.000 $2.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 263.000 $7.000 $6.000 $7.210 $10.000 $9.500 $18.000 $8.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 263.000 $3.000 $2.000 $3.210 $1.000 $1.500 $9.000 $1.000 $3.000
COLORED TEXTURED CONC (4")
SY 69.000 $104.000 $125.000 $150.000 $120.000 $180.250 $150.000 $500.000 $450.000
CONC CURB & GUTTER (TY II)
LF 586.000 $100.000 $65.000 $55.000 $30.000 $66.000 $65.000 $50.000 $75.000
CONC SIDEWALKS (4")
SY 334.000 $90.000 $75.000 $100.000 $100.000 $127.550 $65.000 $220.000 $150.000
CURB RAMPS (TY 1)
EA 1.000 $3,000.000 $3,000.000 $3,500.000 $3,000.000 $2,500.000 $3,250.000 $2,600.000 $4,500.000
CURB RAMPS (TY 5)
EA 2.000 $3,000.000 $3,000.000 $3,500.000 $3,000.000 $2,500.000 $3,250.000 $2,665.000 $7,000.000
CURB RAMPS (TY 7)
EA 9.000 $2,500.000 $4,000.000 $3,500.000 $3,000.000 $2,500.000 $3,250.000 $2,455.000 $4,500.000
CURB RAMPS (TY 21)
EA 4.000 $2,700.000 $4,000.000 $3,500.000 $3,000.000 $2,850.000 $3,250.000 $3,000.000 $4,500.000
CURB RAMPS (TY 22)
EA 30.000 $2,750.000 $4,500.000 $3,500.000 $4,000.000 $3,200.000 $3,250.000 $2,000.000 $4,500.000
CONC MEDIAN
SY 2.000 $100.000 $450.000 $500.000 $120.000 $550.000 $500.000 $2,000.000 $500.000
CONC DIRECTIONAL ISLAND
SY 81.000 $250.000 $125.000 $120.000 $150.000 $550.000 $250.000 $207.000 $350.000
CONDT (PVC) (SCH 80) (2")
LF 72.000 $20.000 $15.000 $11.880 $30.000 $30.000 $20.000 $45.000 $92.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 704.000 $45.000 $36.000 $33.480 $40.000 $33.600 $60.000 $95.000 $98.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 80.000 $47.000 $36.000 $42.120 $50.000 $48.000 $60.000 $96.000 $150.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,818.000 $50.000 $36.000 $48.600 $60.000 $48.000 $60.000 $97.000 $165.000
ELEC CONDR (NO.6) BARE
LF 1,861.000 $3.000 $3.000 $2.360 $3.500 $2.700 $3.000 $18.000 $6.500
GROUND BOX TY D (162922)W/APRON
EA 14.000 $1,300.000 $1,500.000 $1,171.800 $2,200.000 $1,800.000 $1,500.000 $1,999.000 $2,875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $600.000 $750.000 $687.910 $1,000.000 $858.000 $1,500.000 $2,222.000 $900.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 9.000 $800.000 $750.000 $608.580 $500.000 $714.000 $1,000.000 $2,222.000 $720.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 15.000 $1.500 $31.000 $81.000 $25.000 $90.000 $6.000 $8.000 $29.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,351.000 $10.000 $11.000 $26.000 $8.000 $24.000 $20.000 $8.000 $9.000
PAVEMENT SEALER 6"
LF 90.000 $0.300 $13.000 $27.000 $10.000 $30.000 $6.000 $8.000 $11.500
PAVEMENT SEALER 8"
LF 15.000 $0.500 $13.000 $48.600 $10.000 $54.000 $20.000 $8.000 $11.500
PAVEMENT SEALER 24"
LF 1,351.000 $4.000 $8.000 $10.800 $6.000 $12.000 $20.000 $8.000 $7.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 60.000 $0.750 $13.000 $51.840 $10.000 $57.600 $6.000 $8.000 $11.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 30.000 $0.750 $13.000 $51.840 $10.000 $57.600 $6.000 $8.000 $11.500
ELIM EXT PAV MRK & MRKS (6")
LF 71.000 $0.700 $8.000 $27.000 $5.000 $30.000 $6.000 $8.000 $6.000
ELIM EXT PAV MRK & MRKS (8")
LF 23.000 $0.900 $8.000 $37.800 $5.000 $42.000 $6.000 $8.000 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 1,472.000 $3.000 $9.000 $10.800 $6.000 $12.000 $20.000 $8.000 $7.000
PED SIG SEC (LED)(COUNTDOWN)
EA 40.000 $650.000 $950.000 $875.880 $900.000 $960.000 $1,650.000 $3,000.000 $1,000.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 7,385.000 $2.000 $2.500 $2.580 $4.500 $2.520 $3.000 $7.000 $2.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 7,530.000 $3.500 $3.000 $3.870 $5.300 $3.600 $3.000 $7.000 $5.000
PED POLE ASSEMBLY
EA 34.000 $3,000.000 $3,000.000 $4,188.500 $4,200.000 $3,600.000 $4,000.000 $3,777.000 $3,200.000
PED DETECT PUSH BUTTON (APS)
EA 40.000 $1,200.000 $1,250.000 $1,480.680 $1,500.000 $1,140.000 $1,850.000 $1,714.000 $1,700.000
PED DETECTOR CONTROLLER UNIT
EA 5.000 $4,250.000 $3,500.000 $4,487.400 $2,500.000 $5,400.000 $6,500.000 $5,111.000 $515.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $150.000 $100.000 $150.000 $200.000 $325.000 $150.000 $1.000 $150.000
TMA (STATIONARY)
DAY 45.000 $200.000 $350.000 $250.000 $500.000 $350.000 $250.000 $1.000 $500.000
Totals: $820,887.900 $865,454.000 $907,295.590 $973,807.000 $1,057,294.078 $1,116,483.000 $1,245,245.000 $1,486,806.500