SMITH PW (0910-16-121)

Items: 33

County: SMITH
Length: N/A
Highway: PW
District: TYLER
Control Number: 0910-16-121
DBE Goal: N/A
Project: C 910-16-121
Guaranty: N/A
Time: 123 WORKING DAYS
Engineer's Estimate: $1,428,298.20
Date: 03/07/2017 (9 years ago)
Contract Number: N/A
Type: BASE REPAIR, CRAC SEAL, HMAC OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,428,298.20
$1,269,696.00
Over/Under Est: -11.1% -$158,602.20
Over/Under Est: -3.19% -$45,560.10
Amt Left: 8.9% $113,042.10
Over/Under Est: -0.57% -$8,151.95
Amt Left: 11.85% $150,450.25
Delta: -2.71% -$37,408.15
Over/Under Est: 12.35% $176,446.30
Amt Left: 26.39% $335,048.50
Delta: -13.00% -$184,598.25
Over/Under Est: 28.75% $410,640.30
Amt Left: 44.83% $569,242.50
Delta: -14.59% -$234,194.00

Bid Items & Bid Tabulations

33 Total 0 of 33
SMITH  |  PW  |  TYLER  |  0910-16-121  |  03/07/2017  |  $1,428,298.20  |  C 910-16-121  |  BASE REPAIR, CRAC SEAL, HMAC OVERLAY  |  123 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
L. S. EQUIPMENT CO., INC.
EAST TEXAS BRIDGE, INC.
OLDCASTLE MATERIALS TEXAS, INC.
PREPARING ROW (TREE)(10" TO 48" DIA)
EA 18.000 $1,000.000 $1,200.000 $2,500.000 $650.000 $2,000.000 $3,100.000
REMOVING CONC (MEDIANS)
SY 24.000 $10.000 $45.000 $70.000 $50.000 $20.000 $140.000
REMOVING CONC (CURB)
LF 35.000 $20.000 $35.000 $45.000 $50.000 $20.000 $47.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 1,200.000 $4.000 $8.000 $22.000 $14.000 $20.000 $36.000
COMPOST MANUF TOPSOIL (2")
SY 11,510.000 $5.000 $3.000 $6.500 $2.500 $3.000 $2.550
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 11,510.000 $0.200 $0.200 $0.200 $0.250 $0.250 $0.350
BROADCAST SEED (TEMP) (COOL)
SY 5,755.000 $0.200 $0.200 $0.220 $0.250 $0.200 $0.420
VEGETATIVE WATERING
MG 253.000 $15.000 $18.000 $20.000 $10.000 $30.000 $65.000
FL BS (CMP IN PLC)(TY A GR 1-2)(4")
SY 1,108.000 $12.000 $19.000 $20.000 $50.000 $35.000 $45.550
REWORK BS MTL (TY C)(4")(ORD COMP)
SY 1,108.000 $1.400 $7.000 $5.000 $50.000 $20.000 $10.000
PRIME COAT (SS-1)
GAL 489.000 $3.500 $7.000 $6.000 $6.000 $25.000 $8.000
D-GR HMA(SQ) TY-D PG64-22
TON 4,239.000 $200.000 $132.000 $158.000 $150.000 $175.000 $169.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 337.000 $50.000 $55.000 $85.000 $75.000 $60.000 $110.000
PLANE ASPH CONC PAV (2")
SY 456.000 $3.750 $14.000 $46.000 $10.000 $30.000 $40.000
RIPRAP (CONC)(6 IN)
CY 85.000 $450.000 $800.000 $625.000 $800.000 $500.000 $1,000.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 6.000 $140.000 $200.000 $850.000 $800.000 $500.000 $500.000
MOBILIZATION
LS 1.000 $130,000.000 $120,000.000 $95,000.000 $140,000.000 $160,000.000 $183,915.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,000.000 $10,000.000 $2,000.000 $5,000.000 $15,000.000 $14,050.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 40.000 $120.000 $70.000 $325.000 $50.000 $200.000 $145.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 2,000.000 $4.000 $4.000 $7.000 $4.500 $5.000 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $1.000 $1.000 $2.500 $1.000 $1.000 $1.000
CONC CURB (MONO) (TY II)
LF 35.000 $15.000 $120.000 $80.000 $50.000 $50.000 $100.000
CONC CURB (RIBBON)
LF 3,230.000 $35.000 $55.000 $40.000 $25.000 $38.000 $45.000
DRIVEWAYS (ACP)
SY 1,982.000 $50.000 $38.000 $40.000 $90.000 $55.000 $100.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $300.000 $500.000 $825.000 $800.000 $1,500.000 $800.000
REMOVE SM RD SN SUP&AM
EA 1.000 $90.000 $100.000 $165.000 $400.000 $100.000 $200.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 810.000 $0.300 $2.000 $4.400 $5.000 $3.000 $7.000
PREFAB PAV MRK TY B (W)(18")(YLD TRI)
EA 14.000 $25.000 $120.000 $62.000 $60.000 $125.000 $85.000
PRE PM TY B (ACC PRK)(BLU)(SYMBOL ONLY)
EA 3.000 $100.000 $550.000 $250.000 $300.000 $600.000 $400.000
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 8,282.000 $0.750 $2.500 $3.000 $3.000 $3.000 $5.000
REMOVE TIMBER POST
EA 664.000 $8.000 $15.000 $25.000 $10.000 $50.000 $75.000
WHEEL STOPS
EA 62.000 $200.000 $100.000 $100.000 $100.000 $150.000 $115.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 123.000 $90.000 $125.000 $100.000 $100.000 $200.000 $155.000
Totals: $1,428,298.200 $1,269,696.000 $1,382,738.100 $1,420,146.250 $1,604,744.500 $1,838,938.500