Show Job Controls
Bid Cobra

SMITH VA (0910-00-108)

Items: 20

County: SMITH
Length: N/A
Highway: VA
District: TYLER
Control Number: 0910-00-108
DBE Goal: N/A
Project: STP 1702(466)
Guaranty: N/A
Time: 98 WORKING DAYS
Engineer's Estimate: $276,650.00
Date: 08/08/2017 (8 years ago)
Contract Number: N/A
Type: PLANT TREES & SHRUBS, IRRIGATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$276,650.00
$224,599.50
Over/Under Est: -18.81% -$52,050.50
$260,000.00
Over/Under Est: -6.02% -$16,650.00
Amt Left: 15.76% $35,400.50
Over/Under Est: 8.34% $23,065.00
Amt Left: 33.44% $75,115.50
Delta: -15.28% -$39,715.00

Bid Items & Bid Tabulations

20 Total 0 of 20
SMITH  |  VA  |  TYLER  |  0910-00-108  |  08/08/2017  |  $276,650.00  |  STP 1702(466)  |  PLANT TREES & SHRUBS, IRRIGATION  |  98 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CENTRAL NORTH CONSTRUCTION, LLC
AALC, INC.
TIGHT LINE CONSTRUCTION, LLC
BROADCAST SEED (PERM) (URBAN) (SANDY)
SY 700.000 $1.000 $0.990 $0.500 $1.000
VEGETATIVE WATERING
MG 211.000 $5.000 $18.000 $5.000 $1.000
IRRIGATION SYSTEM LOCATION A
LS 1.000 $30,000.000 $41,226.000 $29,984.350 $25,000.000
IRRIGATION SYSTEM LOCATION B
LS 1.000 $15,000.000 $33,506.360 $19,000.000 $12,000.000
IRRIGATION SYSTEM LOCATION C
LS 1.000 $12,000.000 $31,500.000 $19,000.000 $9,000.000
PLANT MATERIAL (1-GAL)
EA 1,211.000 $15.000 $10.000 $3.900 $11.000
PLANT MATERIAL (3-GAL)
EA 299.000 $20.000 $12.000 $9.750 $20.000
PLANT MATERIAL (5-GAL)
EA 1,026.000 $35.000 $16.000 $10.250 $28.000
MULCH
CY 20.000 $20.000 $32.000 $150.000 $150.000
LANDSCAPE EDGE
LF 2,012.000 $15.000 $18.000 $25.000 $18.000
PLANT BED PREPARATION
SY 2,043.000 $20.000 $2.980 $11.000 $13.000
PLANT MATERIAL (15 GAL) (TREE)
EA 61.000 $200.000 $104.000 $99.000 $150.000
PLANT MATERIAL (30 GAL) (TREE)
EA 52.000 $300.000 $222.000 $120.000 $275.000
PLANT MATERIAL (45 GAL) (TREE)
EA 1.000 $500.000 $308.000 $300.000 $650.000
PLANT MAINTENANCE
MO 3.000 $4,000.000 $1,200.000 $2,000.000 $2,000.000
IRRIGATION SYSTEM OPER AND MAINT
MO 3.000 $2,000.000 $800.000 $500.000 $2,500.000
MOBILIZATION
LS 1.000 $23,100.000 $12,500.000 $26,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $1,500.000 $100.000 $5,060.000 $100.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $5.000 $4.610 $0.010 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $5.000 $1.000 $0.010 $1.000
Totals: $276,650.000 $224,599.500 $260,000.000 $299,715.000