SMITH SH 110 (0505-02-047)

Items: 88

County: SMITH
Length: N/A
Highway: SH 110
District: TYLER
Control Number: 0505-02-047
DBE Goal: N/A
Project: CC 505-2-47
Guaranty: N/A
Time: 89 WORKING DAYS
Engineer's Estimate: $757,616.08
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: INSTALL TRAFFIC SIGNAL
Mail/Deliver Bids To: N/A
PAUL SCHNEIDER
TRAVIS SINGLETON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$757,616.08
$787,820.88
Over/Under Est: 3.99% $30,204.80
Over/Under Est: 6.41% $48,573.32
Amt Left: 2.33% $18,368.52
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 37.33% $294,491.66
MORRIS COUNTY CONTRACTORS, L.L.C. 2.80% $22,088.85
J.C. JOHNSON CONSTRUCTION 2.51% $19,801.07
PANOLA SIGN & BARRICADE, INC. 2.02% $15,935.53
ISAACS CONSTRUCTION SERVICES LLC 1.39% $10,965.53
SOUTHWEST ENVIRONMENT SERVICES LLC 1.26% $9,939.98
Total: 47.31% $373,222.62

Bid Items & Bid Tabulations

88 Total 0 of 88
SMITH  |  SH 110  |  TYLER  |  0505-02-047  |  06/01/2023  |  $757,616.08  |  CC 505-2-47  |  INSTL TRAF SIGNAL  |  89 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L. S. EQUIPMENT CO., INC.
REYNOLDS & KAY, LTD.
EXCAVATION (ROADWAY)
CY 305.000 $20.000 $30.000 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 193.000 $30.000 $30.000 $65.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,900.000 $8.800 $2.000 $6.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 2,900.000 $0.200 $1.000 $0.500
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 1,450.000 $4.000 $1.000 $0.750
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 1,450.000 $4.000 $1.000 $0.750
VEGETATIVE WATERING
MG 63.800 $20.000 $0.010 $10.000
ASPH (AC-20-5TR)
GAL 3,013.000 $10.000 $6.000 $9.250
AGGR(TY-PD GR-4 SAC-A)
CY 84.000 $200.000 $300.000 $320.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 60.000 $340.000 $290.000 $265.000
RIPRAP (MOW STRIP)(4 IN)
CY 33.000 $650.000 $600.000 $1,200.000
MOBILIZATION
LS 1.000 $64,783.280 $75,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $9,000.000 $5,000.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $40.000 $100.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $12.000 $50.000 $15.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 12.000 $100.000 $125.000 $21.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 9.000 $120.000 $100.000 $55.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,507.000 $3.500 $4.000 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,507.000 $1.000 $2.000 $1.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 10.000 $175.000 $150.000 $92.000
MTL W-BEAM GD FEN (TIM POST)
LF 475.000 $35.000 $20.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $3,000.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 362.500 $4.000 $10.000 $3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $350.000 $3,000.000 $190.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,250.000 $4,000.000 $3,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $600.000 $250.000
CONDT (PVC) (SCH 40) (2")
LF 860.000 $20.000 $14.000 $11.000
CONDT (PVC) (SCH 80) (3")
LF 30.000 $30.000 $25.000 $21.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 240.000 $40.000 $50.000 $40.000
CONDT (RM) (2")
LF 730.000 $85.000 $60.000 $51.000
ELEC CONDR (NO.8) BARE
LF 915.000 $2.500 $3.000 $2.250
ELEC CONDR (NO.8) INSULATED
LF 3,430.000 $2.800 $3.000 $2.550
ELEC CONDR (NO.6) BARE
LF 90.000 $2.400 $3.000 $2.550
ELEC CONDR (NO.6) INSULATED
LF 270.000 $3.250 $3.000 $2.850
TRAY CABLE (3 CONDR) (12 AWG)
LF 2,135.000 $3.400 $3.000 $2.550
GROUND BOX TY A (122311)W/APRON
EA 7.000 $1,950.000 $1,000.000 $1,050.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,550.000 $1,200.000 $1,100.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 45.000 $55.000 $100.000 $90.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $690.000 $750.000 $700.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 2.000 $400.000 $500.000 $350.000
REMOVE SM RD SN SUP&AM
EA 4.000 $120.000 $200.000 $150.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 5.000 $190.000 $100.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $60.000 $50.000 $30.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 19.000 $1.000 $2.000 $1.450
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 102.000 $1.000 $2.000 $1.450
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 316.000 $2.000 $2.500 $2.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 88.000 $7.150 $8.000 $8.500
REFL PAV MRK TY II (W) 6" (SLD)
LF 712.000 $1.250 $1.100 $1.150
REFL PAV MRK TY II (W) 8" (SLD)
LF 316.000 $1.000 $1.250 $1.150
REFL PAV MRK TY II (W) 24" (SLD)
LF 23.000 $4.000 $5.000 $4.500
REFL PAV MRK TY II (W) (ARROW)
EA 2.000 $75.000 $80.000 $90.000
REFL PAV MRK TY II (W) (WORD)
EA 2.000 $105.000 $150.000 $150.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 714.000 $1.250 $1.100 $1.150
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 4,314.000 $2.000 $1.500 $1.400
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 7,059.000 $2.000 $1.250 $1.400
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $240.000 $250.000 $270.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $250.000 $300.000 $300.000
REFL PAV MRKR TY I-C
EA 16.000 $5.250 $6.000 $6.000
REFL PAV MRKR TY II-A-A
EA 208.000 $5.000 $5.500 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 7,830.000 $0.400 $0.750 $0.800
PAV SURF PREP FOR MRK (6")
LF 1,426.000 $0.500 $1.250 $1.150
PAV SURF PREP FOR MRK (8")
LF 316.000 $0.600 $1.100 $1.150
PAV SURF PREP FOR MRK (24")
LF 23.000 $5.000 $1.100 $1.150
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $40.000 $100.000 $120.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $60.000 $100.000 $120.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $25,900.000 $31,000.000 $31,000.000
VEH SIG SEC (12")LED(GRN)
EA 10.000 $325.000 $300.000 $275.000
VEH SIG SEC (12")LED(GRN ARW)
EA 1.000 $300.000 $300.000 $275.000
VEH SIG SEC (12")LED(YEL)
EA 10.000 $300.000 $300.000 $275.000
VEH SIG SEC (12")LED(YEL ARW)
EA 1.000 $300.000 $300.000 $275.000
VEH SIG SEC (12")LED(RED)
EA 10.000 $300.000 $300.000 $275.000
VEH SIG SEC (12")LED(RED ARW)
EA 1.000 $325.000 $300.000 $275.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 11.000 $180.000 $200.000 $175.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 4,708.000 $5.500 $4.000 $3.400
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 2.000 $8,000.000 $10,000.000 $8,500.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $1,200.000 $1,200.000 $1,100.000
INS TRF SIG PL AM(S)1 ARM(24')ILSN
EA 3.000 $8,700.000 $15,000.000 $13,500.000
INS TRF SIG PL AM(S)1 ARM(28')LUM&ILSN
EA 1.000 $13,350.000 $15,000.000 $16,000.000
INS TRF SIG PL AM(S)1 ARM(32')ILSN
EA 1.000 $11,000.000 $15,000.000 $15,500.000
SP MIXES SP-B PG64-22
TON 615.000 $150.000 $200.000 $240.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $130.000 $500.000 $85.000
MODIFY EXISTING ELECTRICAL SERVICE
EA 1.000 $2,500.000 $6,500.000 $6,200.000
TMA (STATIONARY)
DAY 4.000 $400.000 $500.000 $250.000
TMA (MOBILE OPERATION)
DAY 5.000 $400.000 $1,000.000 $250.000
VIVDS PROSR SYS
EA 1.000 $18,500.000 $20,000.000 $20,000.000
VIVDS CAM ASSY VAR LNS
EA 5.000 $3,500.000 $2,500.000 $2,400.000
VIVDS CNTRL SOFTWARE
EA 1.000 $2,000.000 $1,000.000 $550.000
VIVDS CABLING
LF 1,902.000 $5.000 $3.000 $3.000
Totals: $757,616.080 $787,820.888 $806,189.400