PREPARING ROW
|
STA
|
1.000
|
$1,500.000
|
$20,000.000
|
$1,100.000
|
$18,000.000
|
$8,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
709.000
|
$12.000
|
$25.000
|
$9.500
|
$20.000
|
$15.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
710.000
|
$15.000
|
$13.750
|
$5.000
|
$9.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,179.000
|
$8.270
|
$12.250
|
$8.000
|
$15.000
|
$16.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,829.000
|
$15.000
|
$13.500
|
$8.000
|
$8.000
|
$20.000
|
|
|
BACKFILL (TY A)
|
STA
|
2.720
|
$255.000
|
$1,000.000
|
$375.000
|
$450.000
|
$400.000
|
|
|
BACKFILL (TY B)
|
STA
|
194.250
|
$147.000
|
$235.000
|
$375.000
|
$100.000
|
$175.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
137,500.000
|
$1.000
|
$1.000
|
$0.900
|
$0.400
|
$1.100
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
137,500.000
|
$0.900
|
$0.760
|
$0.850
|
$0.720
|
$0.770
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
68,750.000
|
$0.720
|
$0.640
|
$0.800
|
$0.630
|
$0.640
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
68,750.000
|
$0.750
|
$0.620
|
$0.800
|
$0.620
|
$0.620
|
|
|
VEGETATIVE WATERING
|
MG
|
1,513.000
|
$15.000
|
$10.000
|
$3.500
|
$15.000
|
$8.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
260.000
|
$180.000
|
$155.000
|
$180.000
|
$176.000
|
$235.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
12,540.000
|
$3.600
|
$3.000
|
$4.000
|
$3.800
|
$4.000
|
|
|
CEMENT
|
TON
|
260.000
|
$144.460
|
$155.000
|
$160.000
|
$165.000
|
$165.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
12,540.000
|
$2.500
|
$2.950
|
$4.000
|
$3.800
|
$3.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
1,870.000
|
$4.000
|
$4.000
|
$3.750
|
$6.000
|
$5.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
74,466.000
|
$2.900
|
$3.000
|
$3.100
|
$2.900
|
$3.120
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
1,266.000
|
$125.000
|
$98.000
|
$185.000
|
$110.000
|
$125.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
671.000
|
$125.000
|
$0.010
|
$146.500
|
$140.000
|
$155.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
10,516.000
|
$120.000
|
$155.000
|
$146.500
|
$140.000
|
$155.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
11,708.000
|
$98.000
|
$106.500
|
$105.000
|
$100.000
|
$110.000
|
|
|
SUPERPAVE MIXTURES SP-C PG64-22
|
TON
|
18,667.000
|
$100.000
|
$110.000
|
$109.000
|
$100.000
|
$110.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,000.000
|
$45.000
|
$52.000
|
$55.000
|
$55.000
|
$50.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
11,260.000
|
$55.000
|
$62.000
|
$62.000
|
$65.000
|
$60.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
711.000
|
$2.500
|
$6.000
|
$6.000
|
$6.000
|
$8.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
1,244.000
|
$3.000
|
$6.500
|
$5.500
|
$6.000
|
$8.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
730.000
|
$2.000
|
$6.000
|
$6.500
|
$6.000
|
$8.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$1,000.000
|
$1,200.000
|
$2,700.000
|
$1,600.000
|
$1,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.000
|
$560.000
|
$1,200.000
|
$500.000
|
$950.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
44.000
|
$450.000
|
$450.000
|
$500.000
|
$580.000
|
$500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,078.000
|
$53.000
|
$48.000
|
$42.000
|
$50.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
56.000
|
$75.000
|
$85.000
|
$61.000
|
$105.000
|
$75.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
184.000
|
$850.000
|
$683.000
|
$705.000
|
$800.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,400.000
|
$1,300.000
|
$810.000
|
$850.000
|
$900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,100.000
|
$3,000.000
|
$2,200.000
|
$2,800.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
93.000
|
$700.000
|
$75.000
|
$465.000
|
$875.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$570,238.590
|
$550,000.000
|
$800,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$6,500.000
|
$5,000.000
|
$2,000.000
|
$15,100.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
200.000
|
$20.000
|
$26.500
|
$35.000
|
$32.000
|
$32.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,220.000
|
$32.000
|
$30.000
|
$38.000
|
$33.000
|
$37.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,420.000
|
$8.000
|
$7.000
|
$8.750
|
$4.000
|
$10.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
1,000.000
|
$20.000
|
$16.000
|
$10.000
|
$20.000
|
$30.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$70.000
|
$105.000
|
$48.000
|
$70.000
|
$125.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,437.000
|
$4.000
|
$3.000
|
$3.250
|
$2.600
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,437.000
|
$0.680
|
$1.000
|
$0.650
|
$0.600
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$150.000
|
$170.000
|
$80.000
|
$92.000
|
$225.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$29.000
|
$70.000
|
$114.000
|
$85.000
|
$100.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$5.000
|
$21.000
|
$20.000
|
$17.000
|
$15.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$8.000
|
$35.000
|
$27.000
|
$30.000
|
$20.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
3,898.000
|
$36.000
|
$32.000
|
$51.000
|
$50.000
|
$55.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,242.000
|
$36.000
|
$46.000
|
$26.000
|
$28.000
|
$29.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
6,160.000
|
$15.000
|
$14.000
|
$26.000
|
$18.000
|
$29.000
|
|
|
TURNOUTS (ACP)
|
SY
|
230.000
|
$25.000
|
$30.000
|
$41.000
|
$30.000
|
$40.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
621.000
|
$90.000
|
$100.000
|
$90.000
|
$135.000
|
$125.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
67,050.000
|
$0.150
|
$0.150
|
$0.150
|
$0.160
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
33,525.000
|
$0.150
|
$0.170
|
$0.170
|
$0.160
|
$0.250
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
620.000
|
$30.000
|
$23.250
|
$20.000
|
$20.000
|
$24.000
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
LF
|
4.000
|
$1,650.000
|
$1,800.000
|
$2,000.000
|
$1,700.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
620.000
|
$3.000
|
$2.500
|
$2.250
|
$2.500
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,400.000
|
$2,650.000
|
$3,000.000
|
$2,700.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$265.000
|
$210.000
|
$225.000
|
$250.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,600.000
|
$2,625.000
|
$2,500.000
|
$1,200.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$820.000
|
$1,050.000
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$1,000.000
|
$9,765.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
19.000
|
$190.000
|
$199.500
|
$300.000
|
$200.000
|
$220.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
3.000
|
$230.000
|
$231.000
|
$350.000
|
$230.000
|
$240.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$330.000
|
$393.750
|
$500.000
|
$400.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$725.000
|
$535.500
|
$750.000
|
$540.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
103.000
|
$350.000
|
$294.000
|
$425.000
|
$300.000
|
$300.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
50.000
|
$35.000
|
$30.000
|
$25.000
|
$30.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
11,976.000
|
$0.300
|
$0.160
|
$0.160
|
$0.150
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
124,506.000
|
$0.280
|
$0.110
|
$0.110
|
$0.100
|
$0.110
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
824.000
|
$5.000
|
$2.630
|
$2.750
|
$2.500
|
$2.800
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
830.000
|
$0.250
|
$0.160
|
$0.150
|
$0.150
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
118,072.000
|
$0.190
|
$0.110
|
$0.110
|
$0.100
|
$0.110
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,799.000
|
$0.800
|
$1.000
|
$1.000
|
$0.650
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,079.000
|
$1.000
|
$1.000
|
$1.000
|
$0.650
|
$1.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
5,394.000
|
$1.000
|
$0.910
|
$1.050
|
$0.600
|
$1.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
26,944.000
|
$1.080
|
$1.140
|
$1.050
|
$0.600
|
$1.500
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,446.000
|
$1.000
|
$1.050
|
$1.100
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
412.000
|
$6.000
|
$5.780
|
$5.750
|
$5.800
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,988.000
|
$0.300
|
$0.460
|
$0.450
|
$0.450
|
$0.480
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
67,050.000
|
$0.300
|
$0.400
|
$0.400
|
$0.400
|
$0.410
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
415.000
|
$0.250
|
$0.460
|
$0.450
|
$0.450
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
63,836.000
|
$0.250
|
$0.400
|
$0.400
|
$0.400
|
$0.410
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
8.000
|
$490.000
|
$420.000
|
$450.000
|
$420.000
|
$440.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$1,000.000
|
$787.500
|
$850.000
|
$780.000
|
$900.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
310.000
|
$2.900
|
$3.680
|
$4.000
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
745.000
|
$2.720
|
$3.680
|
$4.000
|
$4.000
|
$4.000
|
|
|
PERMEABLE CONCRETE EDGE DRAIN
|
LF
|
1,350.000
|
$35.000
|
$70.000
|
$60.000
|
$60.000
|
$50.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$6,000.000
|
$15,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$2,300.000
|
$4,500.000
|
$25,000.000
|
$25,000.000
|
$40,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$500.000
|
$26.250
|
$28.000
|
$28.000
|
$50.000
|
|
Totals: |
$7,884,833.020
|
$8,695,777.000
|
$8,827,143.890
|
$8,940,228.450
|
$9,496,441.460
|