Show Job Controls
Bid Cobra

SMITH SH 135 (0378-03-017)

Items: 94

County: SMITH
Length: N/A
Highway: SH 135
District: TYLER
Control Number: 0378-03-017
DBE Goal: N/A
Project: STP 1902(170)
Guaranty: N/A
Time: 315 WORKING DAYS
Engineer's Estimate: $7,884,833.02
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: BS RPR,TRT SUBGRD,ACP,OCST,PFC SURF,STRS,PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,884,833.02
Over/Under Est: 10.28% $810,943.98
$8,827,143.89
Over/Under Est: 11.95% $942,310.87
Amt Left: 1.51% $131,366.89
$8,940,228.45
Over/Under Est: 13.39% $1,055,395.43
Amt Left: 2.81% $244,451.45
Delta: -1.28% -$113,084.56
Over/Under Est: 20.44% $1,611,608.44
Amt Left: 9.21% $800,664.46
Delta: -6.22% -$556,213.01

Bid Items & Bid Tabulations

94 Total 0 of 94
SMITH  |  SH 135  |  TYLER  |  0378-03-017  |  08/07/2019  |  $7,884,833.02  |  STP 1902(170)  |  BS RPR,TRT SUBGRD,ACP,OCST,PFC SURF,...  |  315 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
REYNOLDS & KAY, LTD.
A. L. HELMCAMP, INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 1.000 $1,500.000 $20,000.000 $1,100.000 $18,000.000 $8,000.000
REMOVING CONC (DRIVEWAYS)
SY 709.000 $12.000 $25.000 $9.500 $20.000 $15.000
REMOVING CONCRETE(MOW STRIP)
LF 710.000 $15.000 $13.750 $5.000 $9.000 $15.000
EXCAVATION (ROADWAY)
CY 8,179.000 $8.270 $12.250 $8.000 $15.000 $16.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,829.000 $15.000 $13.500 $8.000 $8.000 $20.000
BACKFILL (TY A)
STA 2.720 $255.000 $1,000.000 $375.000 $450.000 $400.000
BACKFILL (TY B)
STA 194.250 $147.000 $235.000 $375.000 $100.000 $175.000
FURNISHING AND PLACING TOPSOIL (4")
SY 137,500.000 $1.000 $1.000 $0.900 $0.400 $1.100
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 137,500.000 $0.900 $0.760 $0.850 $0.720 $0.770
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 68,750.000 $0.720 $0.640 $0.800 $0.630 $0.640
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 68,750.000 $0.750 $0.620 $0.800 $0.620 $0.620
VEGETATIVE WATERING
MG 1,513.000 $15.000 $10.000 $3.500 $15.000 $8.000
LIME (HYDRATED LIME (DRY))
TON 260.000 $180.000 $155.000 $180.000 $176.000 $235.000
LIME TRT (EXST MATL)(8")
SY 12,540.000 $3.600 $3.000 $4.000 $3.800 $4.000
CEMENT
TON 260.000 $144.460 $155.000 $160.000 $165.000 $165.000
CEMENT TREAT (SUBGRADE) (8")
SY 12,540.000 $2.500 $2.950 $4.000 $3.800 $3.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 1,870.000 $4.000 $4.000 $3.750 $6.000 $5.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 74,466.000 $2.900 $3.000 $3.100 $2.900 $3.120
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 1,266.000 $125.000 $98.000 $185.000 $110.000 $125.000
PFC (ASPHALT) PG76-22
TON 671.000 $125.000 $0.010 $146.500 $140.000 $155.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 10,516.000 $120.000 $155.000 $146.500 $140.000 $155.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 11,708.000 $98.000 $106.500 $105.000 $100.000 $110.000
SUPERPAVE MIXTURES SP-C PG64-22
TON 18,667.000 $100.000 $110.000 $109.000 $100.000 $110.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,000.000 $45.000 $52.000 $55.000 $55.000 $50.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 11,260.000 $55.000 $62.000 $62.000 $65.000 $60.000
PLANE ASPH CONC PAV(0" TO 2")
SY 711.000 $2.500 $6.000 $6.000 $6.000 $8.000
PLANE ASPH CONC PAV(0" TO 4")
SY 1,244.000 $3.000 $6.500 $5.500 $6.000 $8.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 730.000 $2.000 $6.000 $6.500 $6.000 $8.000
CL C CONC (COLLAR)
EA 2.000 $1,000.000 $1,200.000 $2,700.000 $1,600.000 $1,000.000
RIPRAP (CONC)(4 IN)
CY 3.000 $560.000 $1,200.000 $500.000 $950.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 44.000 $450.000 $450.000 $500.000 $580.000 $500.000
RC PIPE (CL III)(18 IN)
LF 3,078.000 $53.000 $48.000 $42.000 $50.000 $50.000
RC PIPE (CL III)(24 IN)
LF 56.000 $75.000 $85.000 $61.000 $105.000 $75.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 184.000 $850.000 $683.000 $705.000 $800.000 $800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,400.000 $1,300.000 $810.000 $850.000 $900.000
CLEAN EXIST CULVERTS
EA 1.000 $1,100.000 $3,000.000 $2,200.000 $2,800.000 $2,000.000
REMOV STR (PIPE)
EA 93.000 $700.000 $75.000 $465.000 $875.000 $500.000
MOBILIZATION
LS 1.000 $350,000.000 $570,238.590 $550,000.000 $800,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $6,500.000 $5,000.000 $2,000.000 $15,100.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 200.000 $20.000 $26.500 $35.000 $32.000 $32.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,220.000 $32.000 $30.000 $38.000 $33.000 $37.000
ROCK FILTER DAMS (REMOVE)
LF 1,420.000 $8.000 $7.000 $8.750 $4.000 $10.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 1,000.000 $20.000 $16.000 $10.000 $20.000 $30.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 150.000 $70.000 $105.000 $48.000 $70.000 $125.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,437.000 $4.000 $3.000 $3.250 $2.600 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,437.000 $0.680 $1.000 $0.650 $0.600 $1.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 150.000 $150.000 $170.000 $80.000 $92.000 $225.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 360.000 $29.000 $70.000 $114.000 $85.000 $100.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 360.000 $5.000 $21.000 $20.000 $17.000 $15.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 360.000 $8.000 $35.000 $27.000 $30.000 $20.000
INTERSECTIONS (ACP)
SY 3,898.000 $36.000 $32.000 $51.000 $50.000 $55.000
DRIVEWAYS (ACP)
SY 1,242.000 $36.000 $46.000 $26.000 $28.000 $29.000
DRIVEWAYS (SURF TREAT)
SY 6,160.000 $15.000 $14.000 $26.000 $18.000 $29.000
TURNOUTS (ACP)
SY 230.000 $25.000 $30.000 $41.000 $30.000 $40.000
DRIVEWAYS (CONC) (HES)
SY 621.000 $90.000 $100.000 $90.000 $135.000 $125.000
RUMBLE STRIPS (SHOULDER)
LF 67,050.000 $0.150 $0.150 $0.150 $0.160 $0.250
RUMBLE STRIPS (CENTERLINE)
LF 33,525.000 $0.150 $0.170 $0.170 $0.160 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 620.000 $30.000 $23.250 $20.000 $20.000 $24.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 4.000 $1,650.000 $1,800.000 $2,000.000 $1,700.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 620.000 $3.000 $2.500 $2.250 $2.500 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,400.000 $2,650.000 $3,000.000 $2,700.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $265.000 $210.000 $225.000 $250.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,600.000 $2,625.000 $2,500.000 $1,200.000 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $820.000 $1,050.000 $1,000.000 $1,000.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $1,000.000 $9,765.000 $10,000.000 $10,000.000 $10,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 19.000 $190.000 $199.500 $300.000 $200.000 $220.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 3.000 $230.000 $231.000 $350.000 $230.000 $240.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $330.000 $393.750 $500.000 $400.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $725.000 $535.500 $750.000 $540.000 $600.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 103.000 $350.000 $294.000 $425.000 $300.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 50.000 $35.000 $30.000 $25.000 $30.000 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 11,976.000 $0.300 $0.160 $0.160 $0.150 $0.160
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 124,506.000 $0.280 $0.110 $0.110 $0.100 $0.110
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 824.000 $5.000 $2.630 $2.750 $2.500 $2.800
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 830.000 $0.250 $0.160 $0.150 $0.150 $0.160
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 118,072.000 $0.190 $0.110 $0.110 $0.100 $0.110
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,799.000 $0.800 $1.000 $1.000 $0.650 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,079.000 $1.000 $1.000 $1.000 $0.650 $1.500
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 5,394.000 $1.000 $0.910 $1.050 $0.600 $1.500
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 26,944.000 $1.080 $1.140 $1.050 $0.600 $1.500
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,446.000 $1.000 $1.050 $1.100 $1.100 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 412.000 $6.000 $5.780 $5.750 $5.800 $6.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,988.000 $0.300 $0.460 $0.450 $0.450 $0.480
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 67,050.000 $0.300 $0.400 $0.400 $0.400 $0.410
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 415.000 $0.250 $0.460 $0.450 $0.450 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 63,836.000 $0.250 $0.400 $0.400 $0.400 $0.410
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $490.000 $420.000 $450.000 $420.000 $440.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $1,000.000 $787.500 $850.000 $780.000 $900.000
REFL PAV MRKR TY I-C
EA 310.000 $2.900 $3.680 $4.000 $4.000 $4.000
REFL PAV MRKR TY II-A-A
EA 745.000 $2.720 $3.680 $4.000 $4.000 $4.000
PERMEABLE CONCRETE EDGE DRAIN
LF 1,350.000 $35.000 $70.000 $60.000 $60.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $6,000.000 $15,000.000 $15,000.000
TMA (STATIONARY)
EA 1.000 $2,300.000 $4,500.000 $25,000.000 $25,000.000 $40,000.000
TMA (MOBILE OPERATION)
HR 50.000 $500.000 $26.250 $28.000 $28.000 $50.000
Totals: $7,884,833.020 $8,695,777.000 $8,827,143.890 $8,940,228.450 $9,496,441.460