Show Job Controls
Bid Cobra

SMITH FM 1253 (0203-08-017)

Items: 17

County: SMITH
Length: N/A
Highway: FM 1253
District: TYLER
Control Number: 0203-08-017
DBE Goal: N/A
Project: STP 2020(877)HES
Guaranty: N/A
Time: 40 WORKING DAYS
Engineer's Estimate: $92,512.90
Date: 06/05/2020 (6 years ago)
Contract Number: N/A
Type: INSTALL LED FLASHING CHEVRONS ON CURVE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$92,512.90
$99,072.00
Over/Under Est: 7.09% $6,559.10
Over/Under Est: 7.93% $7,333.38
Amt Left: 0.78% $774.28
Over/Under Est: 55.12% $50,997.10
Amt Left: 44.85% $44,438.00
Delta: -43.73% -$43,663.72

Bid Items & Bid Tabulations

17 Total 0 of 17
SMITH  |  FM 1253  |  TYLER  |  0203-08-017  |  06/05/2020  |  $92,512.90  |  STP 2020(877)HES  |  INSTL LED FLASHING CHEVRONS ON CURVE  |  40 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STRIPING TECHNOLOGY, L.P.
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
FNH CONSTRUCTION, LLC
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $175.000 $190.000 $248.040 $350.000
MOBILIZATION
LS 1.000 $9,500.000 $10,000.000 $11,106.380 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $2,759.200 $4,500.000 $6,983.000 $8,500.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 2.000 $3,604.510 $5,320.000 $3,490.850 $6,000.000
CONDT (PVC) (SCH 40) (2")
LF 280.000 $6.860 $5.100 $10.750 $15.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 240.000 $27.240 $21.000 $24.600 $40.000
ELEC CONDR (NO.8) BARE
LF 540.000 $1.440 $1.600 $1.130 $3.000
ELEC CONDR (NO.8) INSULATED
LF 1,080.000 $1.500 $2.000 $1.200 $3.000
GROUND BOX TY A (122311)W/APRON
EA 2.000 $593.140 $750.000 $861.150 $1,000.000
ELC SRV TY T 120/240 000(NS)GS(L)SP(O)
EA 1.000 $4,000.000 $3,000.000 $4,112.500 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $578.220 $500.000 $591.840 $850.000
REMOVE SM RD SN SUP&AM
EA 6.000 $116.410 $150.000 $105.000 $250.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 8.000 $79.030 $50.000 $105.000 $250.000
TMA (STATIONARY)
DAY 4.000 $129.190 $200.000 $697.500 $550.000
TMA (MOBILE OPERATION)
DAY 4.000 $20.440 $200.000 $697.500 $850.000
LEAD LED CHEVRON
EA 4.000 $6,090.000 $2,500.000 $2,599.250 $2,500.000
LED CHEVRON
EA 14.000 $1,425.000 $2,500.000 $1,742.500 $2,500.000
Totals: $92,512.900 $99,072.000 $99,846.280 $143,510.000