PREPARING ROW
|
STA
|
260.400
|
$1,500.000
|
$2,000.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
105.000
|
$25.000
|
$26.250
|
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
11,958.000
|
$11.000
|
$9.210
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,936.000
|
$20.000
|
$14.740
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
16,268.000
|
$20.000
|
$20.670
|
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
252,757.000
|
$1.500
|
$1.250
|
|
|
|
BLOCK SODDING
|
SY
|
1,280.000
|
$8.000
|
$5.220
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
252,757.000
|
$0.450
|
$0.370
|
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
126,380.000
|
$0.350
|
$0.370
|
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
126,380.000
|
$0.350
|
$0.350
|
|
|
|
VEGETATIVE WATERING
|
MG
|
10,135.000
|
$10.000
|
$0.010
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
11,636.000
|
$2.500
|
$0.720
|
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
5,208.000
|
$6.000
|
$6.050
|
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
1,260.000
|
$125.000
|
$208.240
|
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
640.000
|
$1,100.000
|
$750.080
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
700.000
|
$100.000
|
$199.100
|
|
|
|
CEM STABIL BKFL
|
CY
|
2.000
|
$120.000
|
$341.250
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,400.000
|
$25.000
|
$44.100
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
16.000
|
$205.000
|
$200.550
|
|
|
|
CL A CONC (COLLAR)
|
EA
|
3.000
|
$700.000
|
$1,060.500
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,433.000
|
$600.000
|
$682.500
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
78.000
|
$200.000
|
$210.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
647.000
|
$70.000
|
$60.900
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
29.000
|
$90.000
|
$89.250
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
68.000
|
$120.000
|
$136.500
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$4,500.000
|
$5,145.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,500.000
|
$6,195.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$7,000.000
|
$6,988.800
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 33 IN)
|
EA
|
2.000
|
$7,500.000
|
$7,245.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$8,000.000
|
$8,032.500
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$10,000.000
|
$8,977.500
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
1.000
|
$13,500.000
|
$15,750.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
1.000
|
$17,500.000
|
$21,000.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
1.000
|
$8,000.000
|
$9,450.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
1.000
|
$9,500.000
|
$10,290.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
1.000
|
$17,500.000
|
$22,575.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
33.000
|
$800.000
|
$825.300
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$1,874.250
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,500.000
|
$3,675.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
13.000
|
$250.000
|
$278.250
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,650,000.000
|
$1,077,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
33.000
|
$6,000.000
|
$4,750.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
576.000
|
$40.000
|
$35.700
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
576.000
|
$8.000
|
$12.600
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$25.000
|
$30.450
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$12.600
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
20,436.000
|
$3.000
|
$3.200
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
20,436.000
|
$1.000
|
$0.630
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
608.000
|
$51.000
|
$81.640
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
100.000
|
$120.000
|
$132.300
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,661.000
|
$62.000
|
$70.790
|
|
|
|
TURNOUTS (ACP)
|
SY
|
65.000
|
$100.000
|
$148.350
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
52,080.000
|
$0.250
|
$0.130
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
26,040.000
|
$0.350
|
$0.130
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,450.000
|
$26.000
|
$26.400
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,725.000
|
$3.000
|
$2.100
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
26.000
|
$3,200.000
|
$3,008.250
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
28.000
|
$275.000
|
$262.500
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$600.000
|
$636.300
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
19.000
|
$250.000
|
$236.250
|
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
6.000
|
$275.000
|
$255.150
|
|
|
|
IN RD IL (TY ST) 40T-8 (250W EQ) LED
|
EA
|
2.000
|
$5,200.000
|
$8,925.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
179.000
|
$15.000
|
$9.450
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
90.000
|
$24.000
|
$27.300
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
294.000
|
$2.000
|
$1.520
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
588.000
|
$2.000
|
$1.630
|
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
3.000
|
$1,200.000
|
$695.100
|
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$7,000.000
|
$7,140.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$800.000
|
$970.200
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$700.000
|
$995.400
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,200.000
|
$1,291.500
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
43.000
|
$360.000
|
$437.850
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$480.000
|
$556.500
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
40.000
|
$105.000
|
$98.700
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
57.000
|
$30.000
|
$33.600
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
30.000
|
$112.000
|
$123.900
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
52,080.000
|
$0.600
|
$0.260
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
300.000
|
$1.000
|
$1.050
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
52,080.000
|
$0.600
|
$0.260
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,212.000
|
$0.650
|
$1.500
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
10,424.000
|
$0.500
|
$1.500
|
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
104,460.000
|
$1.200
|
$1.310
|
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
104,160.000
|
$1.200
|
$1.310
|
|
|
|
REFL PAV MRK TY I (W)6"(LNDP)(090MIL)
|
LF
|
3,313.000
|
$1.000
|
$1.050
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
974.000
|
$1.100
|
$1.050
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
4,120.000
|
$0.400
|
$0.790
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
51,425.000
|
$0.400
|
$0.680
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
51,379.000
|
$0.300
|
$0.680
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
12.000
|
$13.500
|
$26.250
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$205.000
|
$236.250
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$460.000
|
$341.250
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$280.000
|
$278.250
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
103.000
|
$3.500
|
$4.200
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
662.000
|
$3.500
|
$4.200
|
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
563.000
|
$230.000
|
$241.500
|
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
35,585.000
|
$140.000
|
$143.250
|
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
16,539.000
|
$140.000
|
$145.900
|
|
|
|
BONDING COURSE
|
GAL
|
7,533.000
|
$3.500
|
$5.780
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$15,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
340.000
|
$150.000
|
$200.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
66.000
|
$110.000
|
$50.000
|
|
1
|
|
SP MIXES SP-B PG64-22
|
TON
|
21,525.000
|
$100.000
|
$0.000
|
|
1A
|
|
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(12")
|
SY
|
31,187.000
|
$65.000
|
$74.000
|
|
1A
|
|
ASPH (RC-250)
|
TON
|
37.000
|
$1,350.000
|
$1,399.530
|
|
1A
|
|
AGGR (TY E OR L GR 5)
|
CY
|
226.000
|
$333.610
|
$213.210
|
|
Totals: |
$18,603,274.910
|
$16,435,546.930
|