SHACKELFORD FM 576 (1031-05-018)

Items: 66

County: SHACKELFORD
Length: N/A
Highway: FM 576
District: ABILENE
Control Number: 1031-05-018
DBE Goal: 550.0%
Project: BR 2024(663)
Guaranty: N/A
Time: 111 WORKING DAYS
Engineer's Estimate: $2,392,520.70
Date: 01/05/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
BRYCE TURENTINE
CHAD W CARTER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,392,520.70
Over/Under Est: 0.94% $22,431.17
Over/Under Est: 16.44% $393,447.53
Amt Left: 15.36% $371,016.36
Over/Under Est: 25.37% $607,070.90
Amt Left: 24.21% $584,639.73
Delta: -7.67% -$213,623.37
$3,898,272.00
Over/Under Est: 62.94% $1,505,751.30
Amt Left: 61.42% $1,483,320.13
Delta: -29.96% -$898,680.40
Subcontractor Percentage Amount
M & D FOUNDATION DRILLING INDUSTRIES, INC. 7.70% $191,566.08
AARON CONCRETE CONTRACTORS, LLC 6.88% $171,165.53
J. H. STRAIN & SONS, INC. 6.07% $151,013.78
ZENITH SITE SERVICES 5.63% $140,067.14
J. R. (JOE) RAMON & SONS, INC. 3.08% $76,626.43
HJC FARMS, INC. 2.76% $68,665.24
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 1.54% $38,313.22
JVH4 SERVICES, LLC 1.19% $29,605.67
ENVIRONMENTAL SAFETY SERVICES, INC. 0.57% $14,180.87
KING GEORGE TRAFFIC SOLUTIONS LLC 0.47% $11,692.99
FLAT LINE, INC. 0.39% $9,702.70
CONTRACTORS SERVICE, LTD. 0.39% $9,702.70
TORO BRAVO CONSTRUCTION, LLC 0.25% $6,219.68
PENHALL COMPANY 0.21% $5,224.53
Total: 37.13% $923,746.56

Bid Items & Bid Tabulations

66 Total 0 of 66
SHACKELFORD  |  FM 576  |  ABILENE  |  1031-05-018  |  01/05/2024  |  $2,392,520.70  |  BR 2024(663)  |  BRIDGE REPL  |  111 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC
PROJECT ALLIED RESOURCES, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
PREPARING ROW
AC 0.250 $40,000.000 $77,000.000 $92,000.000 $125,000.000 $100,000.000
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 4.000 $1,000.000 $2,625.000 $1,840.000 $13,000.000 $3,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 1.000 $2,500.000 $4,200.000 $3,400.000 $15,000.000 $4,000.000
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 1,294.000 $36.000 $9.450 $25.600 $30.000 $20.000
EXCAVATION (ROADWAY)
CY 949.000 $22.000 $26.250 $23.700 $50.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 574.000 $100.000 $31.500 $30.900 $50.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,982.000 $12.000 $7.350 $2.780 $5.000 $5.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 2,982.000 $1.500 $1.050 $1.070 $4.000 $4.000
VEGETATIVE WATERING
MG 25.100 $275.000 $240.000 $74.000 $1.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 320.000 $5.000 $5.250 $2.190 $6.000 $6.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 255.000 $100.000 $126.000 $99.000 $175.000 $150.000
PRIME COAT (MC-30)
GAL 460.000 $12.000 $21.000 $16.500 $20.000 $30.000
CEM STABIL BKFL
CY 155.000 $330.000 $360.000 $510.000 $350.000 $500.000
DRILL SHAFT (18 IN)
LF 144.000 $175.000 $130.000 $265.000 $150.000 $200.000
DRILL SHAFT (36 IN)
LF 288.000 $340.000 $360.000 $523.000 $320.000 $400.000
DRILL SHAFT (42 IN)
LF 273.000 $440.000 $480.000 $564.000 $350.000 $500.000
CL C CONC (ABUT)(HPC)
CY 58.200 $2,500.000 $1,350.000 $2,880.000 $2,800.000 $3,000.000
CL C CONC (COLUMN)(HPC)
CY 22.800 $2,500.000 $1,655.000 $3,010.000 $2,800.000 $3,000.000
CL H CONC (CAP)(HPC)
CY 37.200 $2,500.000 $4,405.000 $2,940.000 $2,800.000 $4,500.000
REINF CONC SLAB (HPC)
SF 6,800.000 $36.000 $39.500 $56.000 $48.000 $65.000
APPROACH SLAB (HPC)
CY 76.400 $1,200.000 $864.000 $1,700.000 $1,200.000 $2,000.000
PRESTR CONC GIRDER (TX40)
LF 842.420 $260.000 $312.450 $320.000 $425.000 $500.000
SILICONE RESIN PAINT FINISH
SF 605.000 $25.000 $16.600 $18.800 $20.000 $30.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 539.000 $280.000 $200.000 $343.000 $225.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $700.000 $1,217.000 $1,290.000 $800.000 $700.000
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
LF 400.000 $150.000 $167.000 $163.000 $180.000 $325.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 80.000 $290.000 $295.000 $431.000 $225.000 $300.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $200,000.000 $270,000.000 $174,000.000 $320,000.000 $350,000.000
REMOV STR (SMALL FENCE)
LF 275.000 $7.000 $10.500 $11.300 $5.000 $10.000
MOBILIZATION
LS 1.000 $218,000.000 $240,000.000 $304,000.000 $250,000.000 $370,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $5,700.000 $6,600.000 $30,000.000 $3,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $50.000 $58.800 $92.000 $1.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $30.000 $15.750 $23.400 $1.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $50.000 $24.400 $57.000 $1.000 $75.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $13.000 $15.750 $13.800 $1.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $6.000 $8.250 $8.600 $1.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $2.000 $3.400 $2.040 $1.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 891.000 $8.000 $6.600 $10.700 $1.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 891.000 $5.000 $1.600 $3.060 $1.000 $3.000
DRIVEWAYS (BASE)
SY 283.000 $65.000 $31.500 $68.000 $60.000 $70.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $40.000 $31.500 $38.900 $28.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $3,955.000 $3,270.000 $1,800.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 271.000 $7.000 $3.150 $3.890 $2.000 $6.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,100.000 $3,595.000 $4,440.000 $4,000.000 $4,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $315.000 $389.000 $500.000 $500.000
CRASH CUSH ATTEN (INSTL) (S) (TL3)
EA 2.000 $15,000.000 $8,925.000 $11,000.000 $10,000.000 $12,000.000
WIRE FENCE (TY C)
LF 100.000 $25.000 $31.500 $38.900 $25.000 $25.000
GATE (SPECIAL)
EA 5.000 $2,500.000 $3,675.000 $4,530.000 $4,400.000 $3,000.000
WIRE FENCE (TY A) (MOD)
LF 172.000 $60.000 $42.000 $52.000 $30.000 $2,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,250.000 $1,575.000 $1,940.000 $2,000.000 $2,000.000
REMOVE SM RD SN SUP&AM
EA 6.000 $150.000 $6.300 $262.000 $50.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $50.000 $21.000 $80.000 $50.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $90.000 $79.000 $78.000 $50.000 $75.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 62.000 $3.000 $7.000 $2.140 $5.000 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 62.000 $3.000 $7.000 $2.230 $5.000 $5.000
PAVEMENT SEALER 6"
LF 880.000 $1.500 $2.400 $0.440 $5.000 $3.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 1,240.000 $1.000 $2.000 $1.070 $8.000 $5.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 397.000 $1.000 $2.000 $1.070 $15.000 $5.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 843.000 $1.000 $2.000 $1.060 $10.000 $5.000
REFL PAV MRKR TY II-A-A
EA 18.000 $17.500 $4.500 $8.500 $25.000 $25.000
PAV SURF PREP FOR MRK (6")
LF 880.000 $0.500 $2.100 $0.080 $5.000 $3.000
SP MIXES SP-B SAC-B PG70-22
TON 379.000 $180.000 $262.500 $119.000 $300.000 $400.000
SP MIXES SP-C SAC-B PG70-22
TON 126.000 $180.000 $315.000 $139.000 $300.000 $500.000
TACK COAT
GAL 153.000 $10.000 $15.750 $3.090 $8.000 $30.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,500.000 $10,000.000 $13,300.000 $18,000.000 $25,000.000
TMA (MOBILE OPERATION)
HR 60.000 $275.000 $150.000 $112.000 $50.000 $120.000
Totals: $2,392,520.700 $2,414,951.879 $2,785,968.230 $2,999,591.600 $3,898,272.000