|
|
PREPARING ROW
|
STA
|
8.000
|
$2,000.000
|
$3,000.000
|
$3,453.000
|
$3,500.000
|
$5,000.000
|
$90.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
55.000
|
$15.000
|
$25.000
|
$22.300
|
$5.000
|
$20.000
|
$14.500
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
881.000
|
$500.000
|
$350.000
|
$582.420
|
$500.000
|
$300.000
|
$1,500.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
48.000
|
$50.000
|
$50.000
|
$80.700
|
$10.000
|
$75.000
|
$62.000
|
|
|
BACKFILL (TY A)
|
STA
|
881.000
|
$125.000
|
$200.000
|
$183.800
|
$200.000
|
$350.000
|
$1,000.000
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
18,402.000
|
$0.200
|
$0.350
|
$0.240
|
$0.300
|
$0.250
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
309.500
|
$10.000
|
$25.000
|
$22.150
|
$15.000
|
$50.000
|
$48.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
22,938.000
|
$35.000
|
$76.000
|
$70.190
|
$60.000
|
$60.000
|
$72.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
17,777.000
|
$4.500
|
$4.000
|
$4.740
|
$4.000
|
$6.000
|
$6.500
|
|
|
FOG SEAL (SS-1)
|
GAL
|
217.000
|
$3.000
|
$8.000
|
$107.580
|
$4.000
|
$25.000
|
$10.250
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
162,420.000
|
$3.000
|
$3.400
|
$4.070
|
$4.000
|
$5.500
|
$5.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
3,363.000
|
$41.000
|
$115.000
|
$97.750
|
$110.000
|
$110.000
|
$90.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
18,662.000
|
$95.000
|
$90.000
|
$96.560
|
$100.000
|
$105.000
|
$87.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
|
TON
|
38,837.000
|
$100.000
|
$93.000
|
$91.660
|
$105.000
|
$120.000
|
$87.500
|
|
|
SUPERPAV MIX SP-D SAC-B PG70-22(LEV-UP)
|
TON
|
1,452.000
|
$100.000
|
$125.000
|
$104.650
|
$105.000
|
$125.000
|
$180.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
54,289.000
|
$2.000
|
$1.200
|
$2.750
|
$2.500
|
$2.400
|
$2.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
162.000
|
$10.000
|
$65.000
|
$50.000
|
$15.000
|
$95.000
|
$430.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
186.000
|
$550.000
|
$530.000
|
$450.000
|
$500.000
|
$510.000
|
$600.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
279.000
|
$100.000
|
$110.000
|
$95.000
|
$100.000
|
$500.000
|
$190.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
292.000
|
$525.000
|
$530.000
|
$500.000
|
$600.000
|
$575.000
|
$800.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
198.000
|
$15.000
|
$36.000
|
$49.350
|
$60.000
|
$65.000
|
$133.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
147.000
|
$450.000
|
$550.000
|
$465.000
|
$500.000
|
$500.000
|
$1,200.000
|
|
|
JOINT SEALANT
|
LF
|
882.000
|
$32.000
|
$10.000
|
$11.850
|
$15.000
|
$15.000
|
$48.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
6.000
|
$475.000
|
$580.000
|
$550.000
|
$750.000
|
$460.000
|
$500.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
14.000
|
$525.000
|
$620.000
|
$585.000
|
$500.000
|
$525.000
|
$600.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
17.000
|
$550.000
|
$660.000
|
$625.000
|
$650.000
|
$575.000
|
$650.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
4.000
|
$620.000
|
$710.000
|
$675.000
|
$750.000
|
$625.000
|
$720.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
5.000
|
$650.000
|
$830.000
|
$785.000
|
$750.000
|
$700.000
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
100.000
|
$55.000
|
$55.000
|
$50.000
|
$75.000
|
$85.000
|
$86.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
322.000
|
$70.000
|
$120.000
|
$110.000
|
$100.000
|
$130.000
|
$126.000
|
|
|
RC PIPE (ARCH)(CL V)(DES 3)
|
LF
|
501.000
|
$220.000
|
$220.000
|
$210.000
|
$115.000
|
$300.000
|
$319.000
|
|
|
RC PIPE (ARCH)(CL V)(DES 1)
|
LF
|
464.000
|
$180.000
|
$200.000
|
$185.000
|
$125.000
|
$285.000
|
$275.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
2.000
|
$3,800.000
|
$5,300.000
|
$5,000.000
|
$6,000.000
|
$4,750.000
|
$5,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
30.000
|
$4,500.000
|
$5,700.000
|
$5,500.000
|
$5,500.000
|
$3,700.000
|
$4,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
10.000
|
$4,900.000
|
$5,700.000
|
$5,500.000
|
$7,000.000
|
$4,750.000
|
$5,300.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$5,000.000
|
$6,400.000
|
$6,000.000
|
$7,500.000
|
$8,200.000
|
$9,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
3.000
|
$6,700.000
|
$6,400.000
|
$6,000.000
|
$7,500.000
|
$7,750.000
|
$8,700.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$6,900.000
|
$6,800.000
|
$6,500.000
|
$8,000.000
|
$10,600.000
|
$12,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
8.000
|
$7,000.000
|
$6,800.000
|
$6,500.000
|
$9,500.000
|
$9,200.000
|
$10,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$7,200.000
|
$7,400.000
|
$7,000.000
|
$11,000.000
|
$15,200.000
|
$16,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
3.000
|
$7,500.000
|
$8,500.000
|
$8,000.000
|
$7,000.000
|
$12,000.000
|
$13,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$7,800.000
|
$9,000.000
|
$8,500.000
|
$10,000.000
|
$16,000.000
|
$17,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$10,000.000
|
$9,500.000
|
$8,000.000
|
$14,700.000
|
$16,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
10.000
|
$8,800.000
|
$11,000.000
|
$10,500.000
|
$12,000.000
|
$9,250.000
|
$10,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$800.000
|
$750.000
|
$1,500.000
|
$1,100.000
|
$1,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$880.000
|
$800.000
|
$750.000
|
$1,000.000
|
$1,150.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,200.000
|
$850.000
|
$800.000
|
$2,000.000
|
$1,150.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,500.000
|
$900.000
|
$850.000
|
$1,600.000
|
$1,250.000
|
$1,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
18.000
|
$1,300.000
|
$900.000
|
$850.000
|
$1,900.000
|
$2,200.000
|
$2,400.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
38.000
|
$1,300.000
|
$900.000
|
$850.000
|
$1,500.000
|
$650.000
|
$600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
767.000
|
$21.000
|
$22.000
|
$20.000
|
$20.000
|
$11.500
|
$12.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
9.000
|
$63.000
|
$260.000
|
$250.000
|
$50.000
|
$150.000
|
$120.000
|
|
|
REMOV STR (CATTLE GUARD)
|
EA
|
1.000
|
$615.000
|
$2,500.000
|
$1,000.000
|
$2,200.000
|
$1,500.000
|
$635.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
1,081.000
|
$3.000
|
$2.000
|
$4.000
|
$12.000
|
$5.000
|
$2.510
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$856,000.000
|
$1,152,000.000
|
$1,446,162.930
|
$1,250,000.000
|
$1,000,000.000
|
$1,600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$6,000.000
|
$9,000.000
|
$3,625.000
|
$10,000.000
|
$5,000.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
800.000
|
$50.000
|
$55.000
|
$30.000
|
$35.000
|
$30.000
|
$59.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
800.000
|
$10.000
|
$5.000
|
$12.000
|
$13.000
|
$10.000
|
$9.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
780.000
|
$20.000
|
$10.000
|
$19.750
|
$25.000
|
$20.000
|
$24.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
780.000
|
$10.000
|
$1.000
|
$8.000
|
$10.000
|
$10.000
|
$8.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
1,081.000
|
$5.000
|
$5.000
|
$15.000
|
$6.000
|
$10.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,294.000
|
$5.000
|
$4.000
|
$2.940
|
$4.000
|
$10.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,294.000
|
$1.000
|
$1.500
|
$0.500
|
$1.000
|
$2.000
|
$0.750
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,077.000
|
$33.000
|
$33.000
|
$43.760
|
$12.000
|
$40.000
|
$46.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,236.000
|
$18.000
|
$33.000
|
$41.760
|
$55.000
|
$40.000
|
$62.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
6,033.000
|
$19.000
|
$7.000
|
$26.840
|
$40.000
|
$35.000
|
$24.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
173,893.000
|
$0.150
|
$0.180
|
$0.120
|
$0.200
|
$0.120
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
86,946.000
|
$0.150
|
$0.180
|
$0.120
|
$0.250
|
$0.120
|
$0.150
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
8.000
|
$400.000
|
$250.000
|
$600.000
|
$700.000
|
$250.000
|
$590.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,250.000
|
$22.000
|
$25.000
|
$19.500
|
$30.000
|
$28.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$2,200.000
|
$2,200.000
|
$1,450.000
|
$2,700.000
|
$2,200.000
|
$2,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,875.000
|
$2.000
|
$3.000
|
$1.500
|
$4.000
|
$3.600
|
$3.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$215.000
|
$320.000
|
$150.000
|
$400.000
|
$360.000
|
$360.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$200.000
|
$320.000
|
$175.000
|
$400.000
|
$360.000
|
$360.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
24.000
|
$2,700.000
|
$3,200.000
|
$2,450.000
|
$4,000.000
|
$3,600.000
|
$3,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$240.000
|
$320.000
|
$200.000
|
$400.000
|
$360.000
|
$360.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
711.000
|
$15.000
|
$9.000
|
$15.000
|
$25.000
|
$25.000
|
$24.000
|
|
|
CORNER OR PULL POST AM(REM/REP)(METAL)
|
EA
|
10.000
|
$20.000
|
$500.000
|
$250.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
14.000
|
$200.000
|
$190.000
|
$180.000
|
$1,000.000
|
$210.000
|
$370.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$450.000
|
$450.000
|
$430.000
|
$2,000.000
|
$500.000
|
$620.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
70.000
|
$830.000
|
$420.000
|
$395.000
|
$1,000.000
|
$550.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
41.000
|
$880.000
|
$610.000
|
$580.000
|
$1,500.000
|
$700.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$680.000
|
$640.000
|
$1,600.000
|
$725.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(T-2EXT)
|
EA
|
1.000
|
$1,100.000
|
$1,000.000
|
$945.000
|
$2,000.000
|
$1,100.000
|
$1,800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
96.000
|
$100.000
|
$45.000
|
$40.000
|
$130.000
|
$100.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
10.000
|
$84.000
|
$55.000
|
$52.000
|
$95.000
|
$60.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
34.000
|
$25.000
|
$25.000
|
$20.000
|
$25.000
|
$30.000
|
$24.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
44.000
|
$130.000
|
$60.000
|
$56.000
|
$100.000
|
$70.000
|
$93.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
44.000
|
$20.000
|
$11.000
|
$10.000
|
$13.000
|
$15.000
|
$12.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
61.000
|
$50.000
|
$30.000
|
$28.000
|
$45.000
|
$35.000
|
$43.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
182,310.000
|
$0.250
|
$0.300
|
$0.280
|
$0.400
|
$0.250
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
6,736.000
|
$1.250
|
$0.800
|
$1.260
|
$1.250
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
162.000
|
$3.000
|
$10.000
|
$9.000
|
$11.000
|
$12.000
|
$10.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,780.000
|
$0.400
|
$1.100
|
$1.000
|
$1.500
|
$1.200
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
890.000
|
$0.500
|
$3.000
|
$2.750
|
$4.000
|
$2.400
|
$3.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
890.000
|
$0.500
|
$3.000
|
$2.750
|
$4.000
|
$2.400
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
179,600.000
|
$0.200
|
$0.470
|
$0.440
|
$0.750
|
$0.340
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
12,542.000
|
$0.200
|
$0.520
|
$0.490
|
$0.650
|
$0.340
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
113,555.000
|
$0.200
|
$0.470
|
$0.440
|
$0.600
|
$0.340
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,643.000
|
$2.500
|
$4.500
|
$4.000
|
$5.000
|
$4.200
|
$4.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,780.000
|
$0.020
|
$1.100
|
$1.000
|
$1.500
|
$1.200
|
$1.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
16.000
|
$200.000
|
$220.000
|
$400.000
|
$300.000
|
$300.000
|
$270.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
5.000
|
$900.000
|
$240.000
|
$500.000
|
$600.000
|
$650.000
|
$600.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
7.000
|
$1,200.000
|
$500.000
|
$1,000.000
|
$600.000
|
$800.000
|
$600.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
2.000
|
$1,900.000
|
$1,200.000
|
$2,000.000
|
$1,000.000
|
$1,200.000
|
$1,100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,000.000
|
$7,500.000
|
$6,000.000
|
$20,000.000
|
$25,000.000
|
$25,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
4.000
|
$10,000.000
|
$8,000.000
|
$15,000.000
|
$15,000.000
|
$12,000.000
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
252.000
|
$250.000
|
$200.000
|
$220.000
|
$700.000
|
$300.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
288.000
|
$250.000
|
$50.000
|
$220.000
|
$65.000
|
$600.000
|
$700.000
|
|
Totals: |
$11,324,193.750
|
$12,581,377.010
|
$13,146,928.235
|
$14,143,642.000
|
$14,631,960.360
|
$15,990,038.660
|