Show Job Controls
Bid Cobra

SCURRY US0084 (6460-98-001)

Items: 31

County: SCURRY
Length: N/A
Highway: US0084
District: ABILENE
Control Number: 6460-98-001
DBE Goal: 0.0%
Project: RMC - 646098001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,087,122.00
Date: 07/10/2024 (1 year ago) Changed
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,087,122.00
Over/Under Est: -27.44% -$298,317.00
$1,167,263.00
Over/Under Est: 7.37% $80,141.00
Amt Left: 47.98% $378,458.00

Bid Items & Bid Tabulations

31 Total 0 of 31
SCURRY  |  US0084  |  ABILENE  |  6460-98-001  |  07/10/2024  |  $1,087,122.00  |  RMC - 646098001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BARRICADE COMPANY, L.L.C.
HJC FARMS, INC.
MOBILIZATION (CALLOUT)
EA 8.000 $500.000 $500.000 $1.000
MOBILIZATION (EMERGENCY)
EA 34.000 $1,000.000 $800.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 26.000 $200.000 $1.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 32.000 $30.000 $100.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 109.000 $30.000 $9.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 15.000 $30.000 $2.000 $1.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 15.000 $30.000 $2.000 $1.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 15.000 $30.000 $3.000 $1.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 15.000 $30.000 $5.000 $1.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 9,200.000 $20.250 $30.000 $30.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 10.000 $340.000 $75.000 $12.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 40.000 $50.000 $50.000 $5.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 250.000 $26.000 $51.000 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,100.000 $50.000 $30.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 166.000 $60.000 $100.000 $50.000
REALIGN POSTS
EA 21.000 $10.000 $100.000 $5.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 1,200.000 $12.000 $20.000 $7.500
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 167.000 $30.000 $50.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 16.000 $75.000 $150.000 $350.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 85.000 $3,250.000 $3,750.000 $3,750.000
REM & RESET SGT IMPACT HEAD
EA 8.000 $100.000 $250.000 $100.000
REPLACE SGT OBJECT MARKER
EA 10.000 $25.000 $50.000 $1.000
REMOVE AND REPLACE DAT
EA 15.000 $1,400.000 $800.000 $900.000
REPLACE POSTS (TL-4)
EA 735.000 $275.000 $14.000 $250.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 11.000 $350.000 $500.000 $1.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 16.000 $3,500.000 $1,000.000 $750.000
REPLACE CABLE (TL-4)
LF 846.000 $4.500 $3.000 $1.000
CHECK / RE-TENSION CABLE
EA 3.000 $10.000 $1,850.000 $1,000.000
REPAIR (W-BEAM - T101 RAIL)
LF 62.000 $100.000 $20.000 $1.000
REPAIR (TY T1)
LF 36.000 $100.000 $20.000 $1.000
TMA (STATIONARY)
DAY 180.000 $1,000.000 $1.000 $1,500.000
Totals: $1,087,122.000 $788,805.000 $1,167,263.000